Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "TS Bases Control Program". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18037A490  + (TS 333 to Licenses DPR-33,DPR-52 & DPR-68,revising Amount of Boron Required to Be Stored in Standby Liquid Control Sys Solution Tank)
  • ML18037A493  + (TS 337 to Licenses DPR-33,DPR-52 & DPR-68,revising Fire Protection License Condition for Units 1,2 & 3 & Adds Definition of App R Safe Shutdown Program to Section 1.0 in Unit 3 TSs)
  • ML18037A494  + (TS 337 to Licenses DPR-33,DPR-52 & DPR-68,revising Fire Protection License Condition for Units 1,2 & 3 & Adds Definition of App R Safe Shutdown Program to Section 1.0 in Unit 3 TSs)
  • ML18037A486  + (TS 341 to Licenses DPR-33,DPR-52 & DPR-68,revising Requirements for Lab Sample Analysis of Charcoal Adsorbers to Reflect Latest ASTM Std)
  • ML18037A487  + (TS 341 to Licenses DPR-33,DPR-52 & DPR-68,revising Requirements for Lab Sample Analysis of Charcoal Adsorbers to Reflect Latest ASTM Std)
  • ML18249A193  + (TS 4.3.3.6 SR LAR - Request for Additional Information)
  • ML15334A397  + (TS 5 3 2 Emergency LAR Pre-Submittal Meeting Presentation)
  • ML16062A304  + (TS 5.3.2 LAR Pre-Submittal Meeting Presentation - March 2, 2016)
  • ML20052D944  + (TS 5.5.9 Example - Program and Manuals Markup)
  • ML20052D945  + (TS 5.6.7 Example - Reporting Requirements - Markup)
  • ML20300A209  + (TS 5.6.7 Reporting Template Industry Draft)
  • ML15336A731  + (TS 50456-Bwd-AppsABC)
  • ML020510529  + (TS 6.3.2 STA Qualification Requirements Clarification)
  • 05000333/FIN-2013003-01  + (TS Actions for Inoperable Control Rod Not Performed Within the TS Allowed Completion Time)
  • 05000333/FIN-2014005-02  + (TS Actions for Inoperable ECCS Not Performed Within the TS Allowed Completion Time)
  • ML21091A195  + (TS Admin Section on PRA for TSTF-505)
  • ML040330211  + (TS Amendment Pages for License No. NPF-069)
  • ML21203A049  + (TS Amendment SER 7-21-21)
  • ML21253A237  + (TS Appendix B)
  • ML21253A236  + (TS Appendix a)
  • LR-N03-0107, TS Bases Change  + (TS Bases Change)
  • LR-N03-0018, TS Bases Change  + (TS Bases Change)
  • HNP-03-015, TS Bases Change - Containment Isolation Valves  + (TS Bases Change - Containment Isolation Valves)
  • NOC-AE-03001522, TS Bases Changes  + (TS Bases Changes)
  • ML031190352  + (TS Bases Changes)
  • ML031280189  + (TS Bases Changes)
  • ML052410281  + (TS Bases Pages Regarding Limiting Safety System Settings)
  • ML20154Q451  + (TS Bases Update for Period of 970410 Through 981015)
  • W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003  + (TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003)
  • W3F1-2003-0024, TS Bases Update to NRC for Period January 8, 2003 Through April 7, 2003  + (TS Bases Update to NRC for Period January 8, 2003 Through April 7, 2003)
  • ML15083A083  + (TS Bases Updates)
  • ML030790281  + (TS Change 03-01, Revision of Boron Requirements for Cold Leg Accumulators & Refueling Water Storage Tanks)
  • NPL-98-0303, TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles  + (TS Change 205 to License DPR-27,revising Schedule for Implementing Boron Concentration Changes Related to Planned Conversion of Unit 2 to 18-month Fuel Cycles)
  • ML18036B198  + (TS Change 332 to Licenses DPR-33,DPR-52 & DPR-68,changing Surveillance Frequency for EDG Maint Insps from Once Per Yr to Maint Insp Interval of 24 Months)
  • ML18036B199  + (TS Change 332 to Licenses DPR-33,DPR-52 & DPR-68,changing Surveillance Frequency for EDG Maint Insps from Once Per Yr to Maint Insp Interval of 24 Months)
  • ML20059C498  + (TS Change 346 to Licenses DPR-33,DPR-52 & DPR-68, Incorporating Recommendations for Snubber Visual Insp Intervals Contained in GL 90-09, Alternative Requirements for Snubber Visual Insp Intervals & Corrective Actions)
  • ML18039A501  + (TS Change 354 to License DPR-52,providing TS for Operation of Oscillation Power Range Monitor Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys)
  • ML18039A503  + (TS Change 354 to License DPR-52,providing TS for Operation of Oscillation Power Range Monitor Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys)
  • ML18039A822  + (TS Change 398 to License DPR-58,providing TS for Operation of Oscillation PRM Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys)
  • ML18039A823  + (TS Change 398 to License DPR-58,providing TS for Operation of Oscillation PRM Upscale Trip Function in Aprm,Which Is Part of Power Range Neutron Monitoring Sys)
  • ML18039A878  + (TS Change 399 to Licenses DPR-52 & DPR-68,increasing Allowable Leakage Rate Criteria for MSIVs & Requesting Exemption to Portions of 10CFR50,App J.Rev 0 to Rept 2100918-R-002 Encl)
  • ML18039A879  + (TS Change 399 to Licenses DPR-52 & DPR-68,increasing Allowable Leakage Rate Criteria for MSIVs & Requesting Exemption to Portions of 10CFR50,App J.Rev 0 to Rept 2100918-R-002 Encl)
  • ML030550482  + (TS Change 420 - Safety Limit Minimum Critical Power Ratio - Cycle 13 Operation - Response to NRC Request for Additional Information)
  • ML030580460  + (TS Change 423 - Eliminate Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process & Delete Regulatory Commitment)
  • ML20098D733  + (TS Change 92-03 to Licenses DPR-77 & DPR-79,changing TS to Delete 3.25 Requirement for Interval of Three Consecutive Surveillances from TS 4.0.2,per Generic Ltr 89-14)
  • ML20098D668  + (TS Change 92-05 to Licenses DPR-77 & DPR-79,revising TS Bases 3/4.3.3.8, Fire Detection Instrumentation, 3/4.7.11, Fire Suppression Sys & 3/4.7.12, Fire Barrier Penetrations, to Clarify Fire Watch Requirements)
  • ML20098E170  + (TS Change 92-06 to Licenses DPR-77 & DPR-79,revising TS 6.2.3.4 to Reflect Current Restructuring within Util Nuclear Power Organization)
  • ML20114B748  + (TS Change 92-07 to Licenses DPR-77 & DPR-79,increasing Allowable Value for RCS Loss of Flow Reactor Trip Setpoint in TS Table 2.2-1)
  • ML20141M482  + (TS Change 92-09 to Licenses DRP-77 & DPR-79,adding Exclusion to TS 3.0.4 for Action a of TS 3.6.5.2 Re Ice Bed Temp Monitoring Sys & Mode 5 & 6 Actions of TS 3.7.7 Re Control Room Emergency Ventilation Sys)
  • ML20141M484  + (TS Change 92-09 to Licenses DRP-77 & DPR-79,adding Exclusion to TS 3.0.4 for Action a of TS 3.6.5.2 Re Ice Bed Temp Monitoring Sys & Mode 5 & 6 Actions of TS 3.7.7 Re Control Room Emergency Ventilation Sys)