TS Change 92-03 to Licenses DPR-77 & DPR-79,changing TS to Delete 3.25 Requirement for Interval of Three Consecutive Surveillances from TS 4.0.2,per Generic Ltr 89-14
ML20098D733
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/26/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20098D734 List:
References
CON-TVA-SQN-TS-92-03, CON-TVA-SQN-TS-92-3 GL-89-14, NUDOCS 9205290312
Download: ML20098D733 (2)


Text

_

._____,__.___._-_m-

._ ~._ _. __ __ _ _. __... ___

d

,.,i.

~

ML& o 4

,u.

,e May 26, 1992 TVA-SQN-TS-92-03 10 CFR 50.00 U.S. Nuclear Regulatory Commission ATTN Docur.snt Control Desk Washington, D.C. 20555 Gent 1emen!

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CilANGE 92-03, "DELKTION OF 3.25 LIMIT ON EXTENDING SURVEILLANCE INTERVALS" In accordance with 10 CFR 50.90, we are enclosing a requested amendment to Licenses DPR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change deletes the 3.25 requirement for the interval of three consecutive surveillances from TS 4.0.2 in accordance with Generic Letter 89-14 l

tl' The proposed TS change is identified in Enclosure 1.

The justification for the proposed TS change is provided in Enclosure 2.

A proposed determination of no significant haze.rds consideration performed pursuant to 10 CFR 50.92 is provided in Encl.osure 3.

TVA requests a 30-day implementation period for this TS change following issuance.

s 9205290312 92052e

-f'DR ADocg 05000327

,0h) w PDR

-.. =.

__ __ ff ;!D

U.S. Nuclear Regulatory Conn ssion Page 2 May 26, 1992 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.

Sincerely, i -

y'~

J. L. Wilson i

Sworn togdaydsubscribegbeforeme th a Tic v/ /A/)

1992

//

)

.. lb2Lt_)sL.

'bl.fL-

/

Notary Public

/

My Commission Expires _

.4

?S Enclosures cc (Er. closures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Michael 11. Mobley, Director (w/o Enc 1csures)

Division of Radiological llealth e'

T.E.R.R.A. Building 15C 9th Avenue, N Nashville, Tennessee 17203 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, '- nessee 37379 Mr. B. A. Wi'-

n, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Merietta Street, NW, Suite 2900 Atlanta, Georgia 30323

.