TS Change 92-09 to Licenses DRP-77 & DPR-79,adding Exclusion to TS 3.0.4 for Action a of TS 3.6.5.2 Re Ice Bed Temp Monitoring Sys & Mode 5 & 6 Actions of TS 3.7.7 Re Control Room Emergency Ventilation Sys
ML20141M482
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/21/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141M484 List:
References
CON-TVA-SQN-TS-92-09, CON-TVA-SQN-TS-92-9 NUDOCS 9208310204
Download: ML20141M482 (2)


Text

_ -..-_.._ _.__._.-___ __.____.__ _...___ __.___ _ _ _ __._ _ ____ _.

A

. ,, , ,u . , , 1. p . - .-

sm w m  !

6

, .n ,3, ,, s .,.c i

August 21, 1992 TVA-SQN-TS-92-09 10-CFR 50.90 U.S. Nuclear Regulatory Cormnission I ATTN Document Centrol Desk Washington, D.C. 20555 Gentiemeni In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 ,

SEQUOYAll NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CllANGE 92-09, "TS 3.0.4 EXCLUSION FOR ICE BED TEMPERATURE MONITORING AND CONTROL ROOM EMERGENCY VENTILATION" l ,

l l In accordance with 10 CFR 50.90, we are enclosing a requested amendment i to Licenses DIR-77 and DPR-79 to change the TSs of SQN Units 1 and 2.

The proposed change adds an exclusion to TS 3.0.4 for Action a, of TS 3.6.5.2 (ice bed temperature monitoring system) and the Mode 5.and 6 actions of TS 3.7.7 (control room emergency ventilation system)- .

The proposed TS change is identified in Enclosure 1. The justification l for the proposed TS change is provided in Enclosure 2. A proposed-I determination of no significant hazards consideration perforined pursuant to 10 CFR 50.92 is provided in Enclosure 3.

'IYA requests a 30-day itoplementation period for this TS change following issuance. . Picase note that the next opportunity to utilize this relaxation to the current TSs is during the upcoming Unit-1 Cycle 6 refueling outage currently scheduled to start April 3.'1993.

l '

od 310096 , y l 9200310204 920821 I PDR -ADOCK 05000327 P PDR

U.S. Nuclear Regulatory Conunission Page 2 August 21, 1992 Please direct questions concerning_this issue to K. C. Weller at (615) 843-7527.

Sincerely, l,l 3 fW L. Wilson Sworn to nd subscr bed bef re me this _ _, day o ' ')1992 lJJ ,

Notary Public7 # /

y MyCommissionExpires___'l[ Is Enclosures cc_(Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Conunission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Michael 11. Mobley, Director (w/o Enclosures)

Division of Radiological llealth T.E.R.R.A. Building 150 9th Avenue, N Nashville, Tennessee 37203 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 2

a