Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338C884 + (Submits to Governor Thornburg Re Release of Radioactive Gas from Facility & Health Effects of Radiation. Venting of Radioactive Gas from Facility Will Be Dangerous to Public Health & Safety)
- ML20210P856 + (Submits to NRC Post Shutdown Decommissioning Activities Rept for Haddam Neck Plant)
- SVP-98-376, Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings + (Submits to Nrc,Comed Root Cause Analysis Concerning Flaw Indications in Unit 1 Reactor Recirculation Sys Piping Requested in .Plan Will Be Submitted by 990331, as Discussed in 981204 Telcon.With Five Oversize Drawings)
- ML20059E494 + (Submits to file,931230 Ltr to J Quirk,Ge Nuclear Energy, W/Copy of FSER on ABWR Design)
- ML20132C261 + (Submits twenty-two Copies of TR NEDC-32601P, Methodology & Uncertainties for SL MCPR Evaluations. Rept Withheld Per 10CFR2.790)
- ML20059B859 + (Submits two-page Cover Memo to 930714 Document & Requests to Ensure That Cover Memo & Encls 1,2 & 3 to 930701 Document Retrievable from Document Control Sys Under 930701 Date)
- ML20002D152 + (Submits up-to-date Description of Program for Monitoring Radioactivity in Environ Around Facility Per 660715 Request. Lists Objectives of Radiological Environ Monitoring Program)
- ML20002C992 + (Submits up-to-date Info on Licensee Current Operating Practices & Future Plans for Reactor)
- ML18079A284 + (Submits up-to-date Summary of All Proposed ETS Changes, Suggested Replacement Pages & Supporting Justifications,To Assist Preparation of Amend to Ets,App B)
- ML20207D528 + (Submits,For Approval,Info to Establish Atmospheric Dilution Factor for Determining Permissible Average Concentration of Radioactive Effluent from Reactor Effluent Disposal Stack)
- ML20085B089 + (Submits,For Discussion, X Large Break W/Auxiliary Feedwater & Z Small Break Auxiliary Feedwater W/O Reactor Coolant Pumps)
- ML20137S674 + (Submits,For Docket 7002491,advance Notification of Export Shipment,Consisting of Two 40ft Open Top Containers Containing Total 24 Fuel Assemblies Packed in Fuel Transport Packages)
- ML20236J782 + (Submits,For Docket 7200025,description of DOE-Idaho SNF Fuel Transfer & Storage Privatization Project.Request for Proposal,Fuel Types & Funding for Project,Discussed)
- ML20216G800 + (Submits,For Info Only,Summary of Requirements Re Exception Allowing Alternate Emergency Response Facility)
- ML20151Y450 + (Submits,For Info,Plan of Short & long-term Actions to Respond to Issues Raised During 980730 Hearing Before Senate Subcommittee on Clean Air,Wetlands,Private Property & Nuclear Safety & 980717 Meeting with Stakeholders)
- ML20070B235 + (Submits,For NRC Approval,Proposed Change to Emergency Plan, Changing Wording of Section 8.6 Re Operability,Quarterly Checks & Calibr Frequency for Portable Radiation Monitors)
- ML19207A343 + (Submits,For Transmittal to Pdr,Quarterly Rept Re Petitions for Rulemaking as of 790630)
- ML20137D122 + (Submits,Iaw 10CFR20.2206 & TS D6.9.2.1,1996 NRC Form 5 Individual Monitoring Repts for Personnel Requiring Radiation Exposure Monitoring Per 10CFR20.1502 During 1996. W/O Encl)
- LD-85-116, Submits,On Behalf of Rochester Gas & Electric Corp,Fourth Notification for Series of Up to 81 Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna Nuclear Station. Schedule Forwarded.W/O Encl + (Submits,On Behalf of Rochester Gas & Electric Corp,Fourth Notification for Series of Up to 81 Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna Nuclear Station. Schedule Forwarded.W/O Encl)
- LD-85-122, Submits,On Behalf of Rochester Gas & Electric Corp,Fifth Notification for Series of Up to 81 Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna Nuclear Station. Schedule Forwarded.W/O Encl + (Submits,On Behalf of Rochester Gas & Electric Corp,Fifth Notification for Series of Up to 81 Spent Fuel Shipments from West Valley Nuclear Svcs to Re Ginna Nuclear Station. Schedule Forwarded.W/O Encl)
- ML20024H421 + (Submits,Per 10CFR50.54(a)(3),plans Re Replacement of Engineering Assurance in-line Quality Review of Procurement Documents W/Addl & Separate Procurement Engineering Technical & Quality Review at Facility)
- ML20029E120 + (Submits/Clarifies Listed Info Per Agreement Made During 940506 Telcon Re 940425 Emergency TS Amend for TS 3/4.4.5, Incorporating 1.0 Volt SG Tube Interim Plugging Criteria for Cycle 5)
- DCL-2002-584, Submittal - Receiving Water Monitoring Program 1995 - 2002 Analysis Report, Appendix D - E + (Submittal - Receiving Water Monitoring Program 1995 - 2002 Analysis Report, Appendix D - E)
- ML023250374 + (Submittal - Receiving Water Monitoring Program 1995 - 2002 Analysis Report, Appendix a - Appendix C)
- ML023250325 + (Submittal - Receiving Water Monitoring Program 1995-2002 Analysis Report)
- DCL-2005-526, Submittal - Receiving Water Monitoring Program 2004 Annual Report + (Submittal - Receiving Water Monitoring Program 2004 Annual Report)
- DCL-2008-518, Submittal - Receiving Water Monitoring Program 2007 Annual Report + (Submittal - Receiving Water Monitoring Program 2007 Annual Report)
- ML19302D850 + (Submittal 10 CFR 50.46 Annual Report)
- ML20205H538 + (Submittal 2 of Rev 3 to CEN-152, C-E Emergency Procedure Guidelines)
- ML19323D272 + (Submittal Acceptance 11192019)
- ML062130325 + (Submittal BWROG Topical Report NEDC-33178P, Revision 0, General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves)
- ML110280191 + (Submittal Concerning Procedures for Unit 2 Special Nuclear Material)
- ML16015A289 + (Submittal Core Operating Limits Report for Cycle 16 Operation)
- ML12033A121 + (Submittal Corrections (Next 3 Pages) - Enclosure 1 of HBL-11-006, (Pages 3, 4 and 5 of 6))
- SBK-L-15203, Submittal Date Change - Response to Requests for Additional Information for the Review of the License Amendment Application - Set 25, Relating to the Alkali-Silica Reaction (ASR) Monitoring Program + (Submittal Date Change - Response to Requests for Additional Information for the Review of the License Amendment Application - Set 25, Relating to the Alkali-Silica Reaction (ASR) Monitoring Program)
- ULNRC-06583, Submittal Date Change for Resolution of GL 2004-02 + (Submittal Date Change for Resolution of GL 2004-02)
- ULNRC-06605, Submittal Date Change for Resolution of GL 2004-02 + (Submittal Date Change for Resolution of GL 2004-02)
- ML18031A457 + (Submittal Date for Response to NRCs Requests for Additional Information (Rais) for License Amendment Request 1032-4 to HI-STORM FW CoC No. 1032 (CAC No. 001028))
- ML20136A444 + (Submittal Date for Responses to NRCs Request for Additional Information (RAI) for HI-STAR 100MB Transport Package License Amendment Request 9378-1)
- EPID:L-2019-LLA-0242 + (Submittal Date for Responses to Nrc'S Request for Additional Information (RAI) for HI-STAR 100MB Transport Package License Amendment Request 9378-1)
- ML13037A326 + (Submittal Date for Supplement to Application to Revise Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis (WBN-UFSAR-12-01))
- ML031430489 + (Submittal Dated October 16, 2002 - License Amendment for Instrument)
- CNL-14-110, Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project + (Submittal Extension to the Fifth Progress Update on Improved Flood Mitigation System Project)
- CNL-14-109, Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request + (Submittal Extension to the Fifth Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request)
- ML060730365 + (Submittal Letter Dated December 15, 2005, Request for TS for Safety Limit Minimum Critical Power Ratio Safety Limit)
- RS-05-078, Submittal Letter and Attachments 1 Through 5, Request for License Amendment Regarding Transition to Westinghouse Fuel; Dresden Units 2 and 3, Quad Cities Units 1 and 2 + (Submittal Letter and Attachments 1 Through 5, Request for License Amendment Regarding Transition to Westinghouse Fuel; Dresden Units 2 and 3, Quad Cities Units 1 and 2)
- ML17268A033 + (Submittal Letter for NEI 17-02, Revision 1, Tornado Missile Risk Evaluator (TMRE) Industry Guidance Document)
- ML12341A171 + (Submittal Letter for Revised Testimony/Exhibits Indian Point Units 2 and 2 Hearing)
- CNL-17-011, Submittal Letter for Revision 15 to the Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program + (Submittal Letter for Revision 15 to the Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program)
- RS-06-038, Submittal Letter of Additional Information Supporting Request for Transition to Westinghouse Fuel and Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit Ratio Safety Limit + (Submittal Letter of Additional Information Supporting Request for Transition to Westinghouse Fuel and Request for Technical Specifications Change for Minimum Critical Power Ratio Safety Limit Ratio Safety Limit)
- RS-06-033, Submittal Letter, Additional Information Supporting License Amendment Regarding Transition to Westinghouse Fuel + (Submittal Letter, Additional Information Supporting License Amendment Regarding Transition to Westinghouse Fuel)