DCL-2005-526, Submittal - Receiving Water Monitoring Program 2004 Annual Report
| ML051310225 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 04/29/2005 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Briggs R Office of Nuclear Reactor Regulation, State of CA, Central Coast Regional Water Quality Control Bd |
| References | |
| DCL-2005-526 | |
| Download: ML051310225 (2) | |
Text
Pacic Gaas and RElecrc Company James B. Becker Diablo Canyon Power Plant Vice President Diablo Canyon PO. Box 56 Operations and Station Director Avila Beach, CA 93424 805.545.3462 Fax: 805.545.4234 April 29, 2005 PG&E Letter DCL-2005-526 Certified/Return Receipt
- 7003-3110-0005-7002-8452 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 Re:
PG&E Diablo Canyon Power Plant (DCPP) Submittal -
Receiving Water Monitorinq Program 2004 Annual Report
Dear Mr. Briggs:
Enclosed is a copy of the Receiving Water Monitoring Program 2004 Annual Report for DCPP. This report presents the physical and biological data collected in the Receiving Water Monitoring Program during 2004. Per our agreement, no analysis or interpretation of the data were performed. Tables in the appendices provide summary statistics for each task.
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to ensure that qualified personnel properly gather and evaluate the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, I certify that the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
If you have any questions regarding this report, please contact Bryan Cunningham of my staff at (805) 545-4439.
since ely James R.
ker Vice President-Diablo Canyon Operations and Station Director 2005526/JLKtkmo
PG&E Letter DCL-2005-526 Mr. Roger Briggs, Executive Officer Central Coast Regional Water Quality Control Board April 29, 2005 Page 2 cc: w/encl.: Michael Thomas, CCRWQCB 895 Aerovista Place, Suite 101 San Luis Obispo, CA 93401-7906 California Department of Fish and Game 20 Lower Ragsdale, Suite 100 Monterey, California 93940 Resident Inspector, David Prouix U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 Director, Division of Reactor Projects U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 John Steinbeck TENERA DCPP, Avila Beach cc w/o encl.: Robyn Stuber US EPA, Region 9 CWA Standards & Permits Office (Water Div.)