CNL-17-011, Submittal Letter for Revision 15 to the Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program

From kanterella
Jump to navigation Jump to search
Submittal Letter for Revision 15 to the Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, and ISFSI Security Program
ML17025A129
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 01/20/2017
From: James Shea
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNL-17-011
Download: ML17025A129 (2)


Text

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, Revision 15 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.54(p), this letter provides Revision 15 of the Sequoyah Nuclear Plant (SQN) Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program.

The Revision Log of the SQN Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program, provided in the enclosure, describes the recent change. The revised plan became effective as of November 23, .2016.

  • Tennessee Valley Authority (TVA) has evaluated the changes contained in this revision and does riot consider the revision to decrease the safeguards effectiveness of the subject plan.

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.

SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission CNL-17-011 Page 2 January 20, 2017 The enclosure to this letter contains Safeguards Information and should be protected in accordance with. 10 CFR 73.21 arid 10 CFR 73.22. The enclosed plan revision is being sent by certified mail and the signed receipt will signify that the NRC has received this information.

There are no new regulatory commitments associated with this submittal. If you have any questions regarding this information, please contact Brian Brigman, SQN Senior Man'ager, Nuclear Site Security at (423) 843-8051.

Enclosure:

Sequoyah Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and the Independent Spent Fuel Storage Installation Security Program, Revision 15 cc (Enclosure):

NRC Regional Administrator - Region II SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION CLASSIFICATION DOES NOT APPLY TO THIS PAGE WHEN SEPARATED FROM THE ENCLOSURE.