Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-78-191, Submit License Fee Concerning Acceptable Analysis of Unit 3 Beyond 6 Equivalent Months of Operation + (Submit License Fee Concerning Acceptable Analysis of Unit 3 Beyond 6 Equivalent Months of Operation)
- ML19095A273 + (Submit License Renewal Applications for Applicants Who Completed VEPCOs Operator Requalification Program Satisfactorily)
- 05000280/LER-1978-016, Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening + (Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening)
- 05000280/LER-1978-024, Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste + (Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste)
- 05000280/LER-1978-001, Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir + (Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir)
- 05000280/LER-1978-007, Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 + (Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98)
- 05000280/LER-1978-015, Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces + (Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces)
- 05000280/LER-1978-002, Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance + (Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance)
- 05000280/LER-1978-012, Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand + (Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand)
- 05000280/LER-1978-003, Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 + (Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24)
- 05000280/LER-1978-006, Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping + (Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping)
- 05000280/LER-1978-004, Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler + (Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler)
- 05000316/LER-2078-047-03, Submit Licensee Event Report No. RO 78-047/03L-0 + (Submit Licensee Event Report No. RO 78-047/03L-0)
- 05000316/LER-2078-048-03, Submit Licensee Event Report No. RO 78-048/03L-0 + (Submit Licensee Event Report No. RO 78-048/03L-0)
- 05000316/LER-2078-049-03, Submit Licensee Event Report No. RO 78-049/03L-0 + (Submit Licensee Event Report No. RO 78-049/03L-0)
- 05000316/LER-2078-050-03, Submit Licensee Event Report No. RO 78-050/03L-0 + (Submit Licensee Event Report No. RO 78-050/03L-0)
- ML19095A572 + (Submit Licensee Event Report No. USRE-S1-76-17 for Surry Unit 1)
- 05000280/LER-2076-018, Submit Licensee Event Report No. USRE-S1-76-18 Re Inoperable Manipulator Crane Area Monitor + (Submit Licensee Event Report No. USRE-S1-76-18 Re Inoperable Manipulator Crane Area Monitor)
- 05000280/LER-2076-017, Submit Licensee Event Report No. USRE-S1-76-17 Re Failure of Relay VS-103A During Safety Injection Functional Test + (Submit Licensee Event Report No. USRE-S1-76-17 Re Failure of Relay VS-103A During Safety Injection Functional Test)
- 05000316/LER-2078-043-03, Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L + (Submit Licensee Event Report Nos. 1978-043-03L & 1978-044-03L)
- 05000280/LER-2078-019, Submit Licensee Event Report Nos. LER 1978-019/03L-0, LER 1978-021/03L-0, LER 1978-022/03L-0, LER 1978-023/03L-0, LER 1978-025/03L-0, LER 1978-026/03L-0 for Surry Unit No. 1 + (Submit Licensee Event Report Nos. LER 1978-019/03L-0, LER 1978-021/03L-0, LER 1978-022/03L-0, LER 1978-023/03L-0, LER 1978-025/03L-0, LER 1978-026/03L-0 for Surry Unit No. 1)
- 05000280/LER-1978-013, Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded + (Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded)
- 05000280/LER-1978-017, Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid + (Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid)
- 05000280/LER-1977-021, Submit Licensee Event Report Nos. LER-77-021/03L-0 & LER-77-022/03L-0 + (Submit Licensee Event Report Nos. LER-77-021/03L-0 & LER-77-022/03L-0)
- 05000280/LER-1978-008, Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1 + (Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1)
- 05000316/LER-2078-045-03, Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0 + (Submit Licensee Event Report Nos. RO 78-045/03L-0 & RO 78-046/03L-0)
- 05000316/LER-2078-051-03, Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0 + (Submit Licensee Event Report Nos. RO 78-051/03L-0 & RO 78-052/03L-0)
- 05000272/LER-2078-056-03, Submit Licensee Event Report for Reportable Occurrence 78-56/03L + (Submit Licensee Event Report for Reportable Occurrence 78-56/03L)
- ML18227A428 + (Submit Licensee Event Report of Turkey Point Unit 3, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 10/6/1976 for Boron Injection Tank)
- ML18227A427 + (Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 7/26/1976 for Malfunction of 4B Starting Transformer Breaker)
- ML18227A425 + (Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide 30-day Notification, Occurrence on 1/8/1977 for Bfd Relays)
- ML18227A424 + (Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 4/18/1977 for Nominal Power)
- ML18227A429 + (Submit Licensee Event Report of Turkey Point Unit 4, in Accordance with Technical Specification 6.9.2 to Provide Prompt Notification, Occurrence on 8/5/1976 for ECCS Analysis)
- ML19093A496 + (Submit Miscellaneous Changes for Technical Specifications)
- ML19105A329 + (Submit Monthly Operating Report for Surry 2 for the Month of February 1976)
- ML19105A328 + (Submit Monthly Operating Report for Surry 2 for the Month of April 1976)
- ML19105A326 + (Submit Monthly Operating Report for Surry 2 for the Month of July 1976)
- ML19030A338 + (Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1)
- ML19030A347 + (Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1)
- ML19030A343 + (Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1)
- ML19030A356 + (Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1)
- ML19105A325 + (Submit Monthly Operating Report for the Month of August 1976 on Units 1 & 2, & Corrected Copy of Data for March Through July 1976 on Unit 1 & April Through July 1976 on Unit 2)
- ML19030A341 + (Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1)
- ML19030A340 + (Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1)
- ML19030A329 + (Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1)
- ML19030A326 + (Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1)
- ML19030A337 + (Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1)
- ML19030A335 + (Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1)
- ML19030A372 + (Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1)
- ML19030A371 + (Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1)
- ML19030A366 + (Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1)