- ML19319D856 + (Startup Rept, Suppl 1)
- ML19319D855 + (Startup Rept, Suppl 5)
- ML19319D854 + (Startup Rept, Suppl 9)
- DCL-85-031, Startup Rept, for 831115-841031 + (Startup Rept, for 831115-841031)
- ML20082M949 + (Startup Rept,Cycle 2)
- ML20246A900 + (Startup Rept,Cycle 3)
- ML20095D207 + (Startup Rept,Cycle 9)
- ML20043B100 + (Startup Rept,Quarterly Update Catawba Unit 2,Cycle 1. W/)
- ML17304A629 + (Startup Rept,Suppl 1)
- ML20151T548 + (Startup Rept,Suppl 2)
- ML19344D258 + (Startup Rept,Suppl 2 for Period Ending 800129)
- ML20206E757 + (Startup Rept,Suppl 3)
- PY-CEI-NRR-0661, Startup Rept,Supplemental - 1 + (Startup Rept,Supplemental - 1)
- PY-CEI-NRR-0706, Startup Rept,Supplemental - 2 + (Startup Rept,Supplemental - 2)
- PY-CEI-NRR-0746, Startup Rept,Supplemental- 3 + (Startup Rept,Supplemental- 3)
- ML19322C130 + (Startup Rept,Unit 3,for 750314)
- ML20043C603 + (Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup)
- ML20260D422 + (Startup SGFP Discharge NON-RETURN VLV Logic Diagram System:Fw. Actual Drawing NUMBER:6S-13-9-Z-40489 1)
- ML20260D404 + (Startup STM Generator Feedpump Discharge MOV Control Logic Diagram System Fw. Actual Drawing NUMBER:6S-13-9-Z-40484 1)
- ML20261C164 + (Startup Sequence Schedule Balance of Plant HVAC Electrical. Sheet 1 of 2)
- ML20261C170 + (Startup Sequence Schedule NSSS Const & W.P. System. Sheet 2 of 2)
- ML20265C850 + (Startup Steam Generator Feedpump Control Logic Diagram System:Fw)
- ML20260D401 + (Startup Steam Generator Feedpump Control Logic Diagram System:Fw. Actual Drawing NUMBER:5S-13-9-Z-40483 1)
- ML20261C192 + (Startup Summary Schedule Unit 2 Status as Of:May 1,1983. Sheet 1 of 1)
- ML19308C383 + (Startup Svcs & Training Activitives During 1977)
- ML19209A793 + (Startup Test 1:Core Loading Verification)
- ML19209A796 + (Startup Test 2:Control Rod Operability & Subcritical Check)
- ML19209A802 + (Startup Test 3:Transient In-Core Probe Sys Symmetry, Reproducibility & Total Uncertainty)
- ML19209A804 + (Startup Test 4:Initial Criticality Comparison)
- ML19269D159 + (Startup Test 9 for Period 780822 Through 781122.Since NRC Has Not Authorized Operation at Power Levels in Excess of 70%,no Further Power Tests Were Performed During Period)
- W3F1-2007-0044, Startup Test Activity Reduction (STAR) Summary Report from 14th Refueling Outage + (Startup Test Activity Reduction (STAR) Summary Report from 14th Refueling Outage)
- ML092580092 + (Startup Test Activity Reduction (STAR) Summary Report)
- 2CAN040701, Startup Test Activity Reduction (STAR) Summary Report + (Startup Test Activity Reduction (STAR) Summary Report)
- ML20178A565 + (Startup Test Activity Reduction (STAR) Summary Report)
- ML081190041 + (Startup Test Activity Reduction Report)
- ML071010150 + (Startup Test Activity Reduction Summary Report)
- ML15282A240 + (Startup Test Plan)
- ML20024B104 + (Startup Test Procedure 12,Average Power Range Monitor Calibr)
- ML20024B107 + (Startup Test Procedure 17,Sys Expansion)
- ML19305E268 + (Startup Test Procedure 2-ST-13, Simulated Loss of All Onsite & Offsite Power)
- ML19305E274 + (Startup Test Procedure 2-ST-14, Boron Mixing & Cooldown)
- ML19305E273 + (Startup Test Procedure 2-ST-14, Establishment of Natural Circulation from Stagnant Conditions)
- ML20024B109 + (Startup Test Procedure 23A,Feedwater Control Sys)
- ML20024B110 + (Startup Test Procedure 26,Relief Valves)
- ML20024B111 + (Startup Test Procedure 29,Recirculation Flow Control Sys)
- ML20024B112 + (Startup Test Procedure 30,Recirculation Sys)
- ML20024B115 + (Startup Test Procedure 33,Drywell Piping Vibration)
- ML20024B116 + (Startup Test Procedure 35,Recirculation Sys Flow Calibr)
- ML20024B119 + (Startup Test Procedure 74,Offgas Sys)
- ML20024B103 + (Startup Test Procedure 9,Water Level Measurement)
- ML19323A424 + (Startup Test Program)