P O Rc 33198 nce President Charlotte, N C 28242 Nuclear Productwn (704)373 4531 DUKEPOWER May 15, 1990
.U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 l
i Subject'- Catawba Nuclear Station, Unit 2 Docket No. 50-414 Fourteenth Quarterly Update to'Startup Report 1
Gentlement i
In accordance with Section 6.9.'1.~3:of the Catawba Nuclear Station Technical Specifications, please find attached the fourteenth quarterly update to the
' Unit-2 Startup Report.- As indicated in my February 13,-1990 letter to NRC, one test.is.not complete. Additional quarterly updates to thelStartup
'{
. Report will be submitted as required by Technical Specifications.
l l
l l
Very'truly yours, j
8 k y%.
\\
Y l
Hal B. Tucker-l
.i e
HHH-6/lcs l
'i l
Attachment
- 3 1
xc:
Mr. S. D. Ebneter j
r Regional Administrator, RII j
U. S. Nuclear Regulatory Commission 101 Marietta' Street, NW,. Suite 2900 Atlanta, Georgia 30301 1
Mr. W. T.- Orders
, '.]
NRC Resident Inspector-Catawba Nuclear Station Il 1
00$l$-$0@ff;a f
f 47 q
e
[ - ast:
?
STARIUP REFORT QUARTERLY UPDNIE CATAWBA UNIT 2 CYCIE 1-May 7, 1990 TESTING O24PIRTED DURING CUARTER None.
STNIUS OF TESTING NOT 024PIETE STEADY STATE PIPING SYSIDE OPERATIONAL VIBRATION MEASURDiDff-- TP/2/A/1200/21
Ihis test was described in Sections 10.5 and-11.5 in the Startup Report. It is ocmplete except for retesting of piping associated with the Diesel Generator. Fuel Oil and Inbe 011 systems. Aliitional restraints were installed' during the EOC-1 refueling outage., However,- further modifications have been,
found to be wary. ~ 'Ihese nodifications involve the replacemant of rigid
. piping with flexible piping. It has been detemined by Design' Engineering.'
that a Nuclear Station Mxilfication will be necessary to perfom this piping replacement. -. Design work is nearing ccupletion. A qualified parts vendor has been detemined. ' oxpletion of:the test is dependent on these redifications.
It is expected that this modification will'be empleted in mid 1990.
Igb doc 1 start. doc 1