ML20043B100

From kanterella
Jump to navigation Jump to search
Startup Rept,Quarterly Update Catawba Unit 2,Cycle 1. W/
ML20043B100
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/07/1990
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9005240189
Download: ML20043B100 (2)


Text

[3:

x'.

s,.

Duke Ibuer Comparty Hu B %kn D

P O Rc 33198 nce President Charlotte, N C 28242 Nuclear Productwn (704)373 4531 DUKEPOWER May 15, 1990

.U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 l

i Subject'- Catawba Nuclear Station, Unit 2 Docket No. 50-414 Fourteenth Quarterly Update to'Startup Report 1

Gentlement i

In accordance with Section 6.9.'1.~3:of the Catawba Nuclear Station Technical Specifications, please find attached the fourteenth quarterly update to the

' Unit-2 Startup Report.- As indicated in my February 13,-1990 letter to NRC, one test.is.not complete. Additional quarterly updates to thelStartup

'{

. Report will be submitted as required by Technical Specifications.

l l

l l

Very'truly yours, j

8 k y%.

\\

Y l

Hal B. Tucker-l

.i e

HHH-6/lcs l

'i l

Attachment

3 1

xc:

Mr. S. D. Ebneter j

r Regional Administrator, RII j

U. S. Nuclear Regulatory Commission 101 Marietta' Street, NW,. Suite 2900 Atlanta, Georgia 30301 1

Mr. W. T.- Orders

, '.]

NRC Resident Inspector-Catawba Nuclear Station Il 1

00$l$-$0@ff;a f

f 47 q

e

[ - ast:

?

STARIUP REFORT QUARTERLY UPDNIE CATAWBA UNIT 2 CYCIE 1-May 7, 1990 TESTING O24PIRTED DURING CUARTER None.

STNIUS OF TESTING NOT 024PIETE STEADY STATE PIPING SYSIDE OPERATIONAL VIBRATION MEASURDiDff-- TP/2/A/1200/21

Ihis test was described in Sections 10.5 and-11.5 in the Startup Report. It is ocmplete except for retesting of piping associated with the Diesel Generator. Fuel Oil and Inbe 011 systems. Aliitional restraints were installed' during the EOC-1 refueling outage., However,- further modifications have been,

found to be wary. ~ 'Ihese nodifications involve the replacemant of rigid

. piping with flexible piping. It has been detemined by Design' Engineering.'

that a Nuclear Station Mxilfication will be necessary to perfom this piping replacement. -. Design work is nearing ccupletion. A qualified parts vendor has been detemined. ' oxpletion of:the test is dependent on these redifications.

It is expected that this modification will'be empleted in mid 1990.