Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312A279 + (Revision to Response to Order Modifying Licenses)
- ML14241A019 + (Revision to Response to RAI Dated June 19, 2014, Regarding R-113 License Amendment Request)
- RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident)
- NL-12-119, Revision to Response to Request for Additional Information Regarding Operator Manual Actions - Revised Submittal Date + (Revision to Response to Request for Additional Information Regarding Operator Manual Actions - Revised Submittal Date)
- NL-12-093, Revision to Response to Request for Additional Information Regarding Operator Manual Actions + (Revision to Response to Request for Additional Information Regarding Operator Manual Actions)
- SBK-L-04095, Revision to Response to Request for Additional Information Regarding License Amendment Request 04-03. Application for Stretch Power Uprate + (Revision to Response to Request for Additional Information Regarding License Amendment Request 04-03. Application for Stretch Power Uprate)
- LIC-16-0078, Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report + (Revision to Response to Request for Information Regarding Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - Flood Hazard Reevaluation Report)
- ML18346A644 + (Revision to River Bend SER - ML18212A151 - Section 2-3-3-16 Plant Drains)
- ULNRC-04743, Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2 + (Revision to SG Water Level Low Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2)
- ML022910269 + (Revision to SG Water Level Low-Low LCO Applicability & Allowable Values in TS 3.3.1 & 3.3.2)
- NLS2015060, Revision to Safeguards Plan + (Revision to Safeguards Plan)
- NLS2008095, Revision to Safeguards Plan + (Revision to Safeguards Plan)
- ML032890578 + (Revision to Safety Evaluation Supporting License Amendments Approving an Increase in Reactor Power)
- ML071000063 + (Revision to Safety Evaluation Supporting Order Approving Transfer of License and Conforming Amendment Regarding Palisades Nuclear Plant)
- ML052850005 + (Revision to Safety Evaluation for Amendments No. 220 and 226, Dated September 23, 2005)
- ML070740430 + (Revision to Safety Evaluation for Amendment No. 267 Dated February 6, 2007)
- ML040720746 + (Revision to Safety Evaluation of Amendment No. 7 to Amended Facility Operating License No. R-130 - Regents of University of California)
- IR 05000272/2009402 + (Revision to Salem and Hope Creek Generating Stations - NRC Security Inspection Report 05000272-09-402, 05000311-09-402 and 05000354-09-402)
- ML032040005 + (Revision to Schedule for Conduct of Review of R. E. Ginna License Renewal Application)
- ML022900065 + (Revision to Schedule for Conduct of Review of St. Lucie, Units 1 & 2, License Renewal Application)
- ML021050186 + (Revision to Schedule for Conduct of Review of St. Lucie Nuclear Plant, Units 1 & 2, License Renewal Application)
- ML023300045 + (Revision to Schedule for the Conduct of Review of the R. E. Ginna License Renewal Application)
- TSTF-07-35, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Dated July 25, 2007 + (Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions, Dated July 25, 2007)
- TSTF-07-31, Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007 + (Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-493, Revision 2, Clarify Application of Setpoint Methodology for LSSS Functions Dated July 25, 2007)
- CNL-25-075, Revision to Second Round Request for Additional Information - TVA Request for Approval of Revision 44 to TVA Fleet Quality Assurance Program Description + (Revision to Second Round Request for Additional Information - TVA Request for Approval of Revision 44 to TVA Fleet Quality Assurance Program Description)
- NRC 2009-0034, Revision to Security Plan + (Revision to Security Plan)
- NG-04-0550, Revision to Security Plan + (Revision to Security Plan)
- W3F1-2004-0081, Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses + (Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses)
- GNRO-2004/00052, Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses + (Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses)
- 0CAN090406, Revision to Security Plan, T&Q Plan and Safeguards, Contingency Plans Incorporating RAI Responses + (Revision to Security Plan, T&Q Plan and Safeguards, Contingency Plans Incorporating RAI Responses)
- CNL-25-033, Revision to Sequoyah Nuclear Plant, Units 1 and 2 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02 + (Revision to Sequoyah Nuclear Plant, Units 1 and 2 American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternative RV-02)
- NLS2011067, Revision to Service List + (Revision to Service List)
- NLS2011016, Revision to Service List + (Revision to Service List)
- NLS2006025, Revision to Service List + (Revision to Service List)
- NLS2006011, Revision to Service List + (Revision to Service List)
- NLS2005096, Revision to Service List + (Revision to Service List)
- NLS2005005, Revision to Service List + (Revision to Service List)
- NLS2004151, Revision to Service List + (Revision to Service List)
- ML041830257 + (Revision to Service List)
- NLS2004070, Revision to Service List + (Revision to Service List)
- ML030630726 + (Revision to Service List)
- ML023180706 + (Revision to Service List)
- NLS2002128, Revision to Service List + (Revision to Service List)
- ML11111A109 + (Revision to Service List Update Request)
- BYRON 2019-0041, Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16 + (Revision to Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 16)
- RS-09-025, Revision to Standardized Radiological Emergency Plan Implementing Procedures + (Revision to Standardized Radiological Emergency Plan Implementing Procedures)
- PNP 2026-001, Revision to Start Date for Second Exemption from Requirements of 10 CFR 26.205, Fitness for Duty Programs - Work Hours + (Revision to Start Date for Second Exemption from Requirements of 10 CFR 26.205, Fitness for Duty Programs - Work Hours)
- TSTF-510 + (Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection)
- W3F1-2003-0048, Revision to Steam Generator Tubesheet Inspection Information + (Revision to Steam Generator Tubesheet Inspection Information)
- GNRO-2006/00058, Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency + (Revision to Supplement 3 of Amendment Request, Changes to the Local Power Range Monitor Calibration Frequency)
- ML041890407 + (Revision to Surry, Unit 2 Third Interval Relief Request No. SR-004 Rev. 2 - Withdrawal of Surry Unit 1 Fourth Interval Relief Request No. CMP-002)
- ML032250411 + (Revision to Susquehanna Emergency Plan-Position Specific Procedure EP-PS-207, Site Support Manager)
- ML032250414 + (Revision to Susquehanna Emergency Plan-Position Specific Procedure EP-PS-134, Health Physics Radioman)
- ML032250418 + (Revision to Susquehanna Emergency Plan-Position Specific Procedure EP-PS-357, MOC Writer)
- ML032250417 + (Revision to Susquehanna Emergency Plan-Position Specific Procedure EP-PS-350, Public Information Manager)
- ML032250412 + (Revision to Susquehanna Emergency Plan-Position Specific Procedure EP-PS-102, Technical Support Coordinator)
- ML030620523 + (Revision to TMI Modified Amended Physical Security Plan)
- TSTF-357 + (Revision to TS 2.1.1.2, MCPR Safety Limit)
- ML022900260 + (Revision to TS 3.1.8, Physics Tests Exceptions-Mode 2)
- ET 08-0039, Revision to TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, TS 3.7.2, Main Steam Isolation Valves (Msivs), and Addition of New TS 3.7.19, Secondary System Isolation Valves + (Revision to TS 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, TS 3.7.2, Main Steam Isolation Valves (Msivs), and Addition of New TS 3.7.19, Secondary System Isolation Valves)
- DCL-15-087, Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294) + (Revision to TS 3.4.15 for License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-432, Revision 1, Change in Technical Specification End States (WCAP-16294))
- DCL-03-019, Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days + (Revision to TS 3.5.2 - Increase in Completion Time for Charging Pump During Unit 1 Cycle 12 from 72 Hours to 7 Days)