Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML102850748 + (Revised Question 4 for Draft RAI on ISI Program for 4th 10-Year Interval)
- ML092870211 + (Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02)
- ML011490366 + (Revised Questions for the MRP on CRDM Cracking Interim Report)
- ML20013G764 + (Revised Questions to Support the Columbia SPRA Audit)
- LR-N10-0356, Revised RAI 4.3-01 Response Associated with the License Renewal Application + (Revised RAI 4.3-01 Response Associated with the License Renewal Application)
- ML19304C206 + (Revised RAI B3.2-1-a for the Safety Review of Surry Power Station, Units 1 and 2 SLRA (L-2018-RNW-0023_000951) Set 3)
- ML18110A398 + (Revised RAI Process in New Reactor Licensing Reviews April 2018)
- ML062640055 + (Revised RAI for SG Tube Inspection)
- ML031750768 + (Revised RERP Plan Implementing Procedures)
- ML021710592 + (Revised RERP Plan Implementing Procedures)
- ML18116A268 + (Revised RIS 2002-22 Supp 1 (Clean))
- ML20055B743 + (Revised RO 369/82-39 Advising That Statement That Change Made to M-18 Insp Procedure Was Actually Made to Const Procedure 878 Which Controls Implementation of M-18 Insp Program.Mod Designed to Eliminate Bolt)
- ML20081M346 + (Revised RO 369/83-84:on 830929,both Trains of Containment Spray Sys Inoperable.Unit Not Placed in Correct Mode in Required Time.Caused by Sludge Buildup Due to Seal Leakage, Rendering Pump Inoperable.Line Cleared & Operator Counseled)
- ML20214V900 + (Revised RO 50-20/1986-2:on 861008,elevated Levels of Fission Gases Discovered in Primary Containment.Cause Undetermined. Refueling Initiated & Element MIT-19 Removed.All in-core Elements Sipped.No Abnormalities Found)
- ML20030D181 + (Revised RO 50-219/81-2:on 810729,dilution Pump 1-3 Tripped Out of Svc.Cause Attributed to High Lubricating Oil Temps & Low Seal Water Pressure.Total Dilution Pump Upgrade Program Designed to Ameliorate Reliability & Operability Initiated)
- ML20086F412 + (Revised RO Re Plant Iodine & Particulate Release Rate Exceeding 4% of Tech Spec 3.8.C.2 Averaged Over Fourth Quarter 1976.Caused by Leaks in Reactor Water Cleanup Sys. Leaks Repaired & Equipment Modified to Reduce Leakage)
- ML20112F124 + (Revised RO-SPR-84-018:on 841204,RHR Train B Suction Relief Valve Actuated.Caused by RCS Pressure Transient Resulting from Isolation of Letdown Flow.Pressure Control Valves Opened & Power Supply Lead Replaced)
- ML20095L233 + (Revised Radiation Environ Monitoring Plan)
- ML030900622 + (Revised Radiation Protecting Coordinator: Emergency PLSN- Position Specific Procedure)
- ML20023A659 + (Revised Radiation Protection Manual)
- L-0312-451, Revised Radiation Safety Code & QC Manual + (Revised Radiation Safety Code & QC Manual)
- ML20206R078 + (Revised Radiation Safety Manual)
- ML20133D021 + (Revised Radioactive Effluent Rept for Jan-June 1985)
- ML20248C601 + (Revised Radioactive Effluent Rept for LACBWR (Jan-June 1989))
- ML20128F855 + (Revised Radiologic & Engineering Assessment for Property ED-00149-RS)
- ML20149K242 + (Revised Radiological Contingency Plan)
- L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 + (Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196)
- ML18010A772 + (Revised Radiological Effluent TS Pages,Per Generic Ltr 89-01)
- ML20107H524 + (Revised Radiological Effluent Tech Spec Pages 21,22,23,26 & 27 Re Sampling & Analysis of Incinerated Oil)
- ML20039G938 + (Revised Radiological Effluent Tech Spec 5.0 & Figures 5.1.1-1,5.1.2-1 & 5.1.4-1 Re Design Features)
- ML17213B202 + (Revised Radiological Effluent Tech Specs)
- ML20105C035 + (Revised Radiological Effluent Tech Specs Implementation (A-2), Technical Evaluation Rept)
- ML20087N308 + (Revised Radiological Emergency Plan Implementing Procedures, Including Procedures BFN IP-7 Re Activation of Operational Support Ctr & IP-6 Re Activation of Technical Support Ctr)
- ML20236N760 + (Revised Radiological Emergency Plan Implementing Procedures, Including Rev 13 to IP-8, Personnel Accountability & Evaluation & Rev 6 to IP-15, Emergency Exposure Guidelines)
- ML20092P698 + (Revised Radiological Emergency Plan Procedures,Including IP-6 Re Activation of Technical Support ctr,IP-1 Re Emergency Plan Classification logic,IP-14 Re Health Physics & IP-26 Re Tornado Emergency Procedure)
- ML20112G327 + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 15 to RERP-TSC Re Technical Support Ctr & Issue 26 to RERP Phone Lists)
- ML20234F300 + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Table of Contents,Rev 5 to EPP 01-2.1, Emergency Classification & Rev 5 to EPP 01-2.2, Activation of Emergency Plan/Organization)
- ML20198S980 + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Rev 3 to EPP 02-1.3, Drill & Exercises, Rev 5 to EPP 01-1.1, Wolf Creek Generating Station Organization & Rev 4 to EPP 01-1.2)
- ML20207P217 + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Rev 7 to EPP 01-1.1, Wolf Creek Generation Station Organization & Rev 4 to EPP 01-11.2, Status Boards)
- ML20100G295 + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 4 to RERP-CR Re Control Room Procedure & Issue 5 to RERP Section 10.B Re Radiological Emergency Response Plan)
- ML20098B458 + (Revised Radiological Emergency Response Plan Procedures, Consisting of Issue 5 to Section 4,Issue 6 to Section 5, Issue 7 to Section 6 & Issue 6 to Section 7)
- ML20245H037 + (Revised Radiological Emergency Response Preparedness Procedures,Including Rev 5 to EP-402, Responsibilities of Recovery Organization & Rev 3 to RAP-EM1-04, Drills & Exercise)
- ML20238D824 + (Revised Radiological Environ Monitoring Program for 1986)
- ML20154B788 + (Revised Radiological Environ Monitoring Rept,Amending Data Summary for Jul-Dec 1984 to Include Shoreline Sediment Sample)
- ML032461344 + (Revised Radiological Liaison)
- ML20196E580 + (Revised Radiological Safety Procedures)
- ML20151D336 + (Revised Radwaste Summary to Monthly Operating Repts for May 1988 for Browns Ferry Units 1,2 & 3)
- ML20151D333 + (Revised Radwaste Summary to Monthly Operating Repts for Apr 1988 for Browns Ferry Units 1,2 & 3)
- ML20005E878 + (Revised Rancho Seco Physical Security Plan,Training Program & Emergency Plan)
- ML20059H682 + (Revised Rancho Seco Quality Manual)
- ML17262B153 + (Revised Re Ginna Nuclear Power Plant ISI Program for 1990- 1999 Interval)