Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revised Radiological Contingency Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML102850748  + (Revised Question 4 for Draft RAI on ISI Program for 4th 10-Year Interval)
  • ML092870211  + (Revised Questions 4, 6, 7, and 12 of Formal RAI Dated 08/14/2009 GL 2004-02)
  • ML011490366  + (Revised Questions for the MRP on CRDM Cracking Interim Report)
  • ML20013G764  + (Revised Questions to Support the Columbia SPRA Audit)
  • LR-N10-0356, Revised RAI 4.3-01 Response Associated with the License Renewal Application  + (Revised RAI 4.3-01 Response Associated with the License Renewal Application)
  • ML19304C206  + (Revised RAI B3.2-1-a for the Safety Review of Surry Power Station, Units 1 and 2 SLRA (L-2018-RNW-0023_000951) Set 3)
  • ML18110A398  + (Revised RAI Process in New Reactor Licensing Reviews April 2018)
  • ML062640055  + (Revised RAI for SG Tube Inspection)
  • ML031750768  + (Revised RERP Plan Implementing Procedures)
  • ML021710592  + (Revised RERP Plan Implementing Procedures)
  • ML18116A268  + (Revised RIS 2002-22 Supp 1 (Clean))
  • ML20055B743  + (Revised RO 369/82-39 Advising That Statement That Change Made to M-18 Insp Procedure Was Actually Made to Const Procedure 878 Which Controls Implementation of M-18 Insp Program.Mod Designed to Eliminate Bolt)
  • ML20081M346  + (Revised RO 369/83-84:on 830929,both Trains of Containment Spray Sys Inoperable.Unit Not Placed in Correct Mode in Required Time.Caused by Sludge Buildup Due to Seal Leakage, Rendering Pump Inoperable.Line Cleared & Operator Counseled)
  • ML20214V900  + (Revised RO 50-20/1986-2:on 861008,elevated Levels of Fission Gases Discovered in Primary Containment.Cause Undetermined. Refueling Initiated & Element MIT-19 Removed.All in-core Elements Sipped.No Abnormalities Found)
  • ML20030D181  + (Revised RO 50-219/81-2:on 810729,dilution Pump 1-3 Tripped Out of Svc.Cause Attributed to High Lubricating Oil Temps & Low Seal Water Pressure.Total Dilution Pump Upgrade Program Designed to Ameliorate Reliability & Operability Initiated)
  • ML20086F412  + (Revised RO Re Plant Iodine & Particulate Release Rate Exceeding 4% of Tech Spec 3.8.C.2 Averaged Over Fourth Quarter 1976.Caused by Leaks in Reactor Water Cleanup Sys. Leaks Repaired & Equipment Modified to Reduce Leakage)
  • ML20112F124  + (Revised RO-SPR-84-018:on 841204,RHR Train B Suction Relief Valve Actuated.Caused by RCS Pressure Transient Resulting from Isolation of Letdown Flow.Pressure Control Valves Opened & Power Supply Lead Replaced)
  • ML20095L233  + (Revised Radiation Environ Monitoring Plan)
  • ML030900622  + (Revised Radiation Protecting Coordinator: Emergency PLSN- Position Specific Procedure)
  • ML20023A659  + (Revised Radiation Protection Manual)
  • L-0312-451, Revised Radiation Safety Code & QC Manual  + (Revised Radiation Safety Code & QC Manual)
  • ML20206R078  + (Revised Radiation Safety Manual)
  • ML20133D021  + (Revised Radioactive Effluent Rept for Jan-June 1985)
  • ML20248C601  + (Revised Radioactive Effluent Rept for LACBWR (Jan-June 1989))
  • ML20128F855  + (Revised Radiologic & Engineering Assessment for Property ED-00149-RS)
  • L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196  + (Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196)
  • ML18010A772  + (Revised Radiological Effluent TS Pages,Per Generic Ltr 89-01)
  • ML20107H524  + (Revised Radiological Effluent Tech Spec Pages 21,22,23,26 & 27 Re Sampling & Analysis of Incinerated Oil)
  • ML20039G938  + (Revised Radiological Effluent Tech Spec 5.0 & Figures 5.1.1-1,5.1.2-1 & 5.1.4-1 Re Design Features)
  • ML17213B202  + (Revised Radiological Effluent Tech Specs)
  • ML20105C035  + (Revised Radiological Effluent Tech Specs Implementation (A-2), Technical Evaluation Rept)
  • ML20087N308  + (Revised Radiological Emergency Plan Implementing Procedures, Including Procedures BFN IP-7 Re Activation of Operational Support Ctr & IP-6 Re Activation of Technical Support Ctr)
  • ML20236N760  + (Revised Radiological Emergency Plan Implementing Procedures, Including Rev 13 to IP-8, Personnel Accountability & Evaluation & Rev 6 to IP-15, Emergency Exposure Guidelines)
  • ML20092P698  + (Revised Radiological Emergency Plan Procedures,Including IP-6 Re Activation of Technical Support ctr,IP-1 Re Emergency Plan Classification logic,IP-14 Re Health Physics & IP-26 Re Tornado Emergency Procedure)
  • ML20112G327  + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 15 to RERP-TSC Re Technical Support Ctr & Issue 26 to RERP Phone Lists)
  • ML20234F300  + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Table of Contents,Rev 5 to EPP 01-2.1, Emergency Classification & Rev 5 to EPP 01-2.2, Activation of Emergency Plan/Organization)
  • ML20198S980  + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Rev 3 to EPP 02-1.3, Drill & Exercises, Rev 5 to EPP 01-1.1, Wolf Creek Generating Station Organization & Rev 4 to EPP 01-1.2)
  • ML20207P217  + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Rev 7 to EPP 01-1.1, Wolf Creek Generation Station Organization & Rev 4 to EPP 01-11.2, Status Boards)
  • ML20100G295  + (Revised Radiological Emergency Response Plan Implementing Procedures,Including Issue 4 to RERP-CR Re Control Room Procedure & Issue 5 to RERP Section 10.B Re Radiological Emergency Response Plan)
  • ML20098B458  + (Revised Radiological Emergency Response Plan Procedures, Consisting of Issue 5 to Section 4,Issue 6 to Section 5, Issue 7 to Section 6 & Issue 6 to Section 7)
  • ML20245H037  + (Revised Radiological Emergency Response Preparedness Procedures,Including Rev 5 to EP-402, Responsibilities of Recovery Organization & Rev 3 to RAP-EM1-04, Drills & Exercise)
  • ML20238D824  + (Revised Radiological Environ Monitoring Program for 1986)
  • ML20154B788  + (Revised Radiological Environ Monitoring Rept,Amending Data Summary for Jul-Dec 1984 to Include Shoreline Sediment Sample)
  • ML032461344  + (Revised Radiological Liaison)
  • ML20196E580  + (Revised Radiological Safety Procedures)
  • ML20151D336  + (Revised Radwaste Summary to Monthly Operating Repts for May 1988 for Browns Ferry Units 1,2 & 3)
  • ML20151D333  + (Revised Radwaste Summary to Monthly Operating Repts for Apr 1988 for Browns Ferry Units 1,2 & 3)
  • ML20005E878  + (Revised Rancho Seco Physical Security Plan,Training Program & Emergency Plan)
  • ML20059H682  + (Revised Rancho Seco Quality Manual)
  • ML17262B153  + (Revised Re Ginna Nuclear Power Plant ISI Program for 1990- 1999 Interval)