Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-PI-13-086, Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46 + (Revised Heat Transfer Multiplier Distributions - Error Identified in ECCS Evaluation Model, 10 CFR 50.46)
- ML20030A569 + (Revised Heatup Analysis for Exxon Nuclear Co Mixed Oxide G Fuel in Big Rock Point Plant Using Reduced Fuel Thermal Conductivity)
- ML20205D888 + (Revised Heavy Load Analysis Rept,Phase I)
- ML040930190 + (Revised Heller Ehrman White & Mcauliffe Llps Cover Sheet Application for Allowance and Payment of Interim Compensation and Reimbursement of Expenses for the Period February 1, 2004, Through February 29, 2004)
- ML23317A422 + (Revised Hermes Construction Permit)
- ML20071J980 + (Revised Hope Creek Event Classification Guide)
- ML20094P115 + (Revised Hope Creek Event Classification Guide, Including Rev 44 to Table of Contents,Rev 38 to Attachments Signature Page & Rev 25 to Attachments 6,7 & 9)
- ML20069N207 + (Revised Hope Creek Generating Station Event Classification Guide,Including Rev 33 to Table of Contents,Rev 12 to Attachment 1,Page 5 & Rev 7 to Attachment 2,Page 4)
- ML20096F474 + (Revised Hope Creek Generating Station Event Classification Guide, Including Rev 45 to Table of Contents,Rev 39 to Attachments Signature Page,Rev 26 to Attachment 6,Rev 26 to Attachment 7 & Rev 26 to Attachment 9)
- ML18018A436 + (Revised Human Factors Design Evaluation Rept for Shearon Harris Unit 1 Control Room)
- ML20199F515 + (Revised Human Factors Engineering Dcrdr Technical Evaluation Rept for Beaver Valley Power Station Unit 2)
- ML19319C504 + (Revised Hydrologic Engineering Summary Input for SER)
- IR 05000003/1982001 + (Revised IE Insp Repts 50-003/82-01 & 50-247/82-02 on 820208- 11.No Noncompliance Noted.Major Areas Inspected:Followup of Emergency Preparedness Items from 810511-20 Appraisal.Rept Includes Revised Page 22)
- ML21106A282 + (Revised IMC 1245 App C15, Construction Inspector Technical Proficiency Training and Qualification Journal)
- ML13247A349 + (Revised ISFSI Bases, Includes Revised Record of Revision, Revised Current Page List, and Revision 9 to Page B 3.1.5-1)
- ML17263A523 + (Revised ISI Program for 1990-1999 Interval)
- ML12223A091 + (Revised IST Relief Request PR-06)
- ML25062A170 + (Revised IST Valve Relief Request, VRR-003 Rev. 1, for the Fourth 10-Year IST Interval)
- ML15254A509 + (Revised ITS Conversion Change Tables)
- ML060040303 + (Revised Implementation Date for Amendment No. 248 Concerning the Number of Emergency Core Cooling Systems)
- GO2-09-072, Revised Implementation Date for License Amendment Request for Proposed Changes to Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1 + (Revised Implementation Date for License Amendment Request for Proposed Changes to Technical Specification 3.3.6.1; Change Group 1 Primary Containment Isolation Valves Reactor Water Level Isolation Signal from Level 2 to Level 1)
- ML052710468 + (Revised Implementation Date for License Amendments & Technical Specification Changes Re Revision in the Number of Emergency Core Cooling Systems Required in Response to LOCA)
- W3F1-2015-0078, Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR) + (Revised Implementation Item Regarding Adoption of National Fire Protection Association Standard NFPA 805 License Amendment Request (LAR))
- ML020280361 + (Revised Implementation Period for License Amendment Nos. 246 and 124)
- L-2018-196, Revised Implementation Schedule for Open Phase Condition + (Revised Implementation Schedule for Open Phase Condition)
- ST-HL-AE-4764, Revised Implementation of Proposed Licensing Amend Re Tech Specs Based Upon Fuel Upgrade,Plant Safety & Revised Thermal Design Procedures + (Revised Implementation of Proposed Licensing Amend Re Tech Specs Based Upon Fuel Upgrade,Plant Safety & Revised Thermal Design Procedures)
- ML031700463 + (Revised Implementing Procedures)
- ML20069J264 + (Revised Implementing Procedures)
- ML20214U376 + (Revised Implementing Procedures,Including Rev 5 to 1.1, Activation of Corporate Emergency Response Organization, Emergency Transportation Instructions Rev 7 to 3.2, Corporate Communications Dept & Rev 4 to 2.1)
- ML20106B677 + (Revised Implementing Reference Including,Rev 15 to AR-501, ICS I Annunciator Response, Rev 5 to AR-951, Wda Annunciator Response & Rev 2 to AR-953, Wdc Annunciator Response)
- ML030840596 + (Revised Improved TS Bases Manuals Unit 2)
- ML031190342 + (Revised Improved TS Manual Bases Unit 1)
- ML030920351 + (Revised Improved TS Manual Bases Unit 1)
- ML030840591 + (Revised Improved TS Manual Bases Unit 1)
- ML031190332 + (Revised Improved Technical Specifications Bases Manuals Unit 2)
- ML20090E627 + (Revised Incident Rept,Turkey Point Unit 3,Safety Valve Headers,Dec 1971)
- ML18051A312 + (Revised Incidental Take Statement for Indian Point Nuclear Generating Units 2 and 3, Appendix a, Incident Report for Shortnose and Atlantic Sturgeon)
- ML20080B961 + (Revised Index to Emergency Plan Implementing Procedures)
- ML051660182 + (Revised Individual Monitoring Reports for 2004 (NRC Form 5))
- ML010190317 + (Revised Industry Steam Generator Program License Change Package)
- ML042530063 + (Revised Information)
- ML063180228 + (Revised Information Associated with License Amendment Request: Technical Specification Improvement Regarding Steam Generator Tube Integrity Using Consolidated Line Item Improvement Process)
- RNP-RA/03-0154, Revised Information Regarding License Renewal Application Dated June 14, 2002 + (Revised Information Regarding License Renewal Application Dated June 14, 2002)
- ML12093A093 + (Revised Information Regarding Pilgrim Station Safety Enhancement Program)
- ML031490355 + (Revised Information Regarding TS Change 02-07, One Time Frequency Extension for Type a Test Containment Integrated Leak Rate Test)
- ML043130016 + (Revised Initial Examination Results Letter, No. 50-123/OL-04-01, University of Missouri - Rolla)
- IR 05000352/2024302 + (Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302)
- ML081630086 + (Revised Initial Response to NRC Generic Letter 2008-01: Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems, Dated January 11, 2008)
- ML071020300 + (Revised Initial Scouting Trip Summary Report)
- ML20215M351 + (Revised Inservice Exam Program Plan for First 10-yr Interval)
- ML20076E107 + (Revised Inservice Insp Program)
- ML20097E804 + (Revised Inservice Insp Program)