ML030920351
| ML030920351 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 03/24/2003 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030920351 (8) | |
Text
Mar. 24, 2003 Page I of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-14638
/ 51
') 0.1 USER INFORMATION:
Name:GE AHRSE M
Address: NSA2 Phone#: /5-4 EMPL#:28401 CA#:0363 TRANSMITTAL INFORMATION:
TO:
-E~~fRSE Al 03/24/2003 LOCATION: f-USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO.THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
ITSB1 -
IMPROVED TECHNICAL SPECIFICATIONS MANUAL BASES - UNIT I REMOVE MANUAL TABLE OF CONTENTS DATE: 03/14/2003 ADD MANUAL TABLE OF CONTENTS DATE: 03/21/2003 CATEGORY: DOCUMENTS TYPE: ITSB1 ID:
ITSB1 REMOVE:
REV:39 ADD:
REV: 40 UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
f
~A-~
TSB APPROVED AMENDMENT TO THE UNIT I TECHNICAL SPECIFICATIONS BASES MANUAL REVISION 40 Replace the following pages of the Technical Specifications Bases Manual with the enclosed pages. The revised pages are identified by Revision Number and contain vertical lines indicating the-area of change.
REMOVE PAGES INSERT PAGES REV. #
TS / B LOES 1 through TS / B LOES 5 TS / B LOES 1 through TS I B LOES 5 40 B 3.6-64 TS / B 3.6-64 1
g \\hic docs\\ts-wp51\\ts-manual\\0.00 Ihsts\\tsb rem ins.u1u2.doc 3111/03
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision 1
TOC B 2.0 Table of Contents SAFETY LIMITS BASES Page B 2.0-1 Page TS/B 2.0-2 Pages TS/B 2.0-3 through TSB 2.0-5 0
1 1
corrected 1
0 Page TS/B 2.0-6 Pages B 2.0-7 through B 2.0-9 B 3.0 B 3.1 B 3.2 B 3.3 LCO AND SR APPLICABILITY BASES Pages B 3.0-1 through B 3.0-7 Pages TS / B 3.0-8 and TS / B 3.0-9 Page B 3.0-10 through B 3.0-12 4 - /
Pages TS / B 3.0-13 through TS / B 3.0-15
\\
REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-51 POWER DISTRIBUTION LIMITS BASES3/4
/
Page B 3.2-1 Page TS/B 3.2-2 Page B 3.2-3
/
3/4 Pages TS/B 3.2-4 through TSIB 3.2-6 Pages B 3.2-7 and 13.2-8 Page TSIB 3.2-9g(
N3/4 Page B 3.2-10-,",,
Page TS/B 13.2`1'I Page B 3.2-12 PageJTS/B 3.2-134 Pages B3.2-14 a"id B 3.2-15 Page TSIB,3.2-16 (Pages B,3.2-17 and 3.2-18 Page TS/B 3.2-19 INSTRUMENTATION Pages TS / B 3.3-1 through TS I B 3.3-10 Page TS / B 3.3-11 Pages TS I B 3.3-12 through TS / B 3.3-27 Pages TS / B 3.3-28 through TS I B 3.3-31 Pages TS / B 3.3-32 and TS / B 3.3-33 Pages TS / B 3.3-34 through TS / B 3.3-54 Pages B 3.3-55 through B 3.3-63 Pages TS / B 3.3-64 and TS / B 3.3-65 Page TS / B 3.3-66 Page TS I B 3.3-67 Page TS / B 3.3-68 1
2 3
2 3
I 0
2 3
2 3
SUSQUEHANNA
- UNIT I TSIB LOES-1 Revision 40 SUSQUEHANNA - UNIT 1 TS / B LOES-1 Revision 40
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Corrected Pages TS / B 3.3-69 through TS / B 3.3-75 2
Page TS / B 3.3-75a 4
Pages TS / B 3.3-75b through TS I B 3.3-75c 3
Pages B 3.3-76 through B 3.3-103 0
Page TS / B 3.3-104 1
Pages B 3.3-105 and B 3.3-106 0
Page TS I B 3.3-107 1
Page B 3.3-108 0
Page TS I B 3.3-109 1
Pages B 3.3-110 and B 3.3-111 0
Pages TS/B 3.3-112 and TS/B 3.3-112a 1
Pages B 3.3-113 and B 3.3-114 0
PageTS/B 3.3-115 1
Page TS I B 3.3-116 2
Page TS / B 3.3-117 1
Pages B 3.3-118 through B 3.3-122 0
Pages TS / B 3.3-123 through TS / B 3.3-124 1
Page TS I B 3.3-124a 0
Pages B 3.3-125 and B 3.3-126 0
Page TS / B 3.3-127 1
Pages B 3.3-128 through B 3.3-130 0
Page TS / B 3.3-131 1
Pages B 3.3-132 through B 3.3-137 0
Page TS / B 3.3-138 1
Pages B 3.3-139 through B 3.3-162 0
Page TS / B 3.3-163 1
Pages B 3.3-164 through B 3.3-177 0
Pages B 3.3-178 and B 3.3-179 1
Page B 3.3-179a 0
Pages TS / B 3.3-180 through TS / B 3.3-191 1
Pages B 3.3-192 through B 3.3-219 0
B 34 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0
Pages TSIB 3.4-3 and TS/B 3.4-4 1
Pages B 3.4-5 through B 3.4-14 0
Page TS / B 3.4-15 1
Pages TS / B 3.4-16 and TS I B 3.4-17 2
Page TS / B 3.4-18 1
Pages B 3.4-19 through B 3.4-28 0
Page TS / B 3.4-29 1
Pages B 3.4-30 through B 3.4-48 0
Page TS / B 3.4-49 2
Page TS / B 3.4-50 1
Page TS / B 3.4-51 2
Pages TS I B 3.4-52 and TS / B 3.4-53 1
SUSQUEHANNA - UNIT 1 TS / B LOES-2 Revision 40
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.4-54 2
Page TS / B 3.4-55 2
Page TS / B 3.4-56 1
Page TS / B 3.4-57 2
Pages TS / B 3.4-58 through TS I B 3.4-60 1
B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0
Page TS / B 3.5-3 2
Pages B 3.5-4 through B 3.5-10 0
Page TS I B 3.5-11 1
Pages B 3.5-12 through B 3.5-15 0
Pages TS / B 3.5-16 through TS / B 3.5-18 1
- Pages B 3.5-19 through B 3.5-24 0
Page TS / B 3.5-25 1
Pages B 3.5-26 through B 3.5-31 0
B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2
Page TS / B 3.6-1 a 3
Pages TS / B 3.6-2 through TS I B 3.6-5 2
Page TS / B 3.6-6 3
Pages TS / B 3.6-6a and TS I B 3.6-6b 2
Page TS / B 3.6-6c 0
Pages B 3.6-7 through B 3.6-14 0
Page TS / B 3.6-15 2
Pages TS / B 3.6-15a and TS / B 3.6-15b 0
Page B 3.6-16 0
Page TS / B 3.6-17 1
Page TS / B 3.6-17a 0
Pages TS / 8 3.6-18 and TS / B 3.6-19 0
Page TS / B 3.6-20 1
Page TS / B 3.6-21 2
Page TS / B 3.6-22 1
Page TS I B 3.6-22a 0
Page TS / B 3.6-23 1
Pages TS / B 3.6-24 through TS I B 3.6-25 0
Page TS /B 3.6-26 0
Corrected Page TS /B 3.6-27 2
Page TS /B 3.6-28 4
Page TS /B 3.6-29 1
Page TS/B 3.6-30 1
Page TS / B 3.6-31 3
Pages B 3.6-32 through B 3.6-35 0
Page TS / B 3.6-36 1
Page B 3.6-37 0
SUSQUEHANNA
- UNIT I TSIBLOES-3 Revision 40 SUSQUEHANNA - UNIT 1 TS / B LOES-3 Revision 40
J v
s SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS/B 3.6-38 1
Page B 3.6-39 0
Page TS I B 3.6-40 2
Pages B 3.6-41 through B 3.6-43 0
Pages TS / B 3.6-44 through TS / B 3.6-51 1
Page TS / B 3.6-52 2
Pages B 3.6-53 through B 3.6-63 0
Page TS / B 3.6-64 1
Pages B 3.6-65 through B 3.6-83 0
Pages TS / B 3.6-84 2
Pages TS / B 3.6-85 through TS / B 3.6-88 1
Page TS / B 3.6-88a 1
Pages TS / B 3.6-89 through TS / B 3.6-1 00 1
Pages B 3.6-101 through B 3.6-1 07 0
B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 through TS / B 3.7-6 2
Page TS l B 3.7-6a 2
Pages TS /13 3.7-6b and TS / B 3.7-6c 0
Pages TS / B 3.7-7 through TS / B 3.7-11 1
Pages TS / B 3.7-12 and TS / B 3.7-13 1
Pages TS / B 3.7-14 through TS / B 3.7-18 2
Page TS I B 3.7-18a 0
Pages TS / B 3.7-19 through TS / B 3.7-23 1
Pages B 3.7-24 through B 3.7-26 0
Pages TS / B 3.7-27 through TS I B 3.7-29 2
Page TS / B 3.7-30 1
Pages B 3.7-31 through B 3.7-33 0
B 3.8 ELECTRICAL POWER SYSTEMS BASES Pages TS / B 3.8-1 through TS / B 3.8-4 2
Page TS / B 3.8-5 3
Pages TS / B 3.8-6 through TS/B 3.8-17 2
Page TS / B 3.8-18 3
Pages TS / B 3.8-19 through TS / B 3.8-21 2
Pages TS / B 3.8-22 and TS I B 3.8-23 3
Pages TS / B 3.8-24 through TS I B 3.8-37 2
Pages B 3.8-38 through B 3.8-53 0
Pages TS / B 3.8-54 through TS / B 3.8-61 1
Page TS I B 3.8-62 2
Page TS I B 3.8-63 2
Page TS I B 3.8-64 1
PageTSlB3.8-65 2
Pages TSIB 3.8-66 through B 3.8-90 0
SUSQUEHANNA
- UNIT I TS/BLOES-4 Revision 40 SUSQUEHANNA - UNIT 1 TS / B LOES-4 Revision 40
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS I B 3.9-1a 1
Pages TS / B 3.9-2 through TS / B 3.9-4 1
Pages B 3.9-5 through B 3.9-30 0
B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 1
Pages B 3.10-2 through B 3.10-38 0
SUSQUEHANNA
- UNIT I TS/B LOES-5 Revision 40 SUSQUEHANNA - UNIT 1 TS / B LOES-5 Revision 40
RHR Suppression Pool Cooling B 3.6.2.3 BASES ACTIONS A_
(continued) pool cooling capabilities afforded by the OPERABLE subsystem and the low probability of a DBA occurring during this period.
B.1 With two RHR suppression pool cooling subsystems inoperable, one subsystem must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. In this condition, there is a substantial loss the of primary containment pressure and temperature mitigation function. The 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Completion Time is based on this loss of function and is considered acceptable due to the low probability of a DBA and the potential avoidance of a plant shutdown transient that could result in the need for the RHR suppression pool cooling subsystems to operate.
C.1 and C.2 If the Required Action and associated Completion Time cannot be met the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE 231 REQUIREMENTS SR 3.6.3.
Verifying the correct alignment for manual, power operated, and automatic valves in the RHR suppression pool cooling mode flow path provides assurance that the proper flow path exists for system operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position since these valves were verified to be in the correct position prior to locking, sealing, or securing. A valve is also allowed to be in the nonaccident position provided it can be aligned to the accident position within the time assumed in the accident analysis. This is acceptable since the RHR suppression pool cooling mode is manually initiated. This SR does not require any testing or valve manipulation; rather, it involves verification that those valves capable of being mispositioned are in the correct position. This SR does not apply to valves that cannot be inadvertently misaligned, such as check valves.
(continued)
SUSQUEHANNA - UNIT 1 TS / B 3.6-64 Revision 1