ML031700463
| ML031700463 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/09/2003 |
| From: | Entergy Nuclear Northeast |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 28226 IP-1053, Rev 14 | |
| Download: ML031700463 (13) | |
Text
Page:
1 DISTRIBUTION CONTROL LIST tocument Name:
EMER PLAN CC_NAME NAME 2 EP/TRAINING ADMINISTRATOR 3 RES DEPARTMENT MANAGER 4 REFERENCE LIBRARY 9 JOINT NEWS CENTER 10 SHIFT MGR.(LUB-001-GEN) 11 CONTROL ROOM & MASTER 14 EOF 16 AEOF/A.GROSJEAN(ALL EP'S) 19 NUC ENGINEERING LIBRARY 21 TSC 22 RESIDENT INSPECTOR 23 SILK DAVID 24 SILK DAVID 25 DOCUMENT CONTROL-DESK
'28 AVRAKOTOS N 29 E-PLAN STAFF 30 E-PLAN STAFF 31 BARANSKI J(VOLUME I ONLY) 32 SUTTON A -(VOLUME I ONLY) 33 LONGO N (VOLUME I ONLY) 34 GREENE D (VOLUME I ONLY) 35 RAMPOLLA M(VOLUME I ONLY) 41 SIMULATOR 107 QA MANAGER 319 C.STELLATO(NRQ-OPS TRN) 354 L.GRANT(LRQ-OPS/TRAIN) 376 E-PLAN STAFF 424 J.CHIUSANO(OPS INSTR) 510 L.GRANT(LRQ-OPS/TRAIN) 511 L. GRANT (LRQ-OPS/TRAIN) 512 C.STELLATO(NRQ-OPS TRN) 513 C.STELLATO(NRQ-OPS TRN) 517 PLANT MANAGER'S OFFICE 518 DOCUMENT CONTROL 520 CONTROL ROOM (UNIT 2) 521 SIMULATOR 522 NRC RESIDENT 523 ROBERT VOGLE (UNIT 2) 524 JOHN MCCANN (UNIT 2)
DEPT LOCATION TRAINING (ALL EP'S)
RES (UNIT 3/IPEC ONLY)
REC/TRN(UNT 3/IPEC ONLY)
EMER PLN (ALL EP'S)
OPS (UNIT 3/IPEC ONLY)
DOC (UNIT 3/IPEC ONLY)
RECORDS US NRC(UNIT 3/IPEC ONLY)
NRC (ALL EP'S)
NRC (ALL EP'S)
NRC (ALL EP'S)
J A(UNIT 3/IPEC ONLY)
ST. EMERG. MGMT. OFFICE DISASTER & EMERGENCY EMERGENCY SERVICES DISASTER & CIVIL DEFENSE OFFICE OF EMERG MANAGE TRAIN(UNIT 3/IPEC ONLY)
QA (UNIT 3/IPEC)
NRQ (UNIT 3/IPEC ONLY)
LRQ (UNIT 3/IPEC ONLY)
(UNIT 3/IPEC ONLY)
LRQ (UNIT 3/IPEC ONLY)
LRQ (UNIT 3/IPEC ONLY)
NRQ (UNIT 3/IPEC ONLY)
NRQ (UNIT 3/IPEC ONLY)
ADMIN/(UNIT 2/IPEC ONLY)
UNIT 2(UNIT 2/IPEC ONLY)
TRAIN (UNIT 2/IPEC ONLY)
US NRC(UNIT 2/IPEC ONLY)
TRAIN/LIB (ALL EP'S)
NUC SAFETY/LIC(ALL EP'S)
- 48 45-4-A BLDG/17 EOF IP3 IP3(ONLY)
EOF WPO-12D WPO/7A 45-3-F 45-2-B OFFSITE OFFSITE OFFSITE OFFSITE EOF EOF OFFSITE WESTCHESTR ROCKLAND ORANGE PUTNAM 48-2-A TRL #2A
- 48
- 48 EOF
- 48
- 48
- 48
- 48
- 48 IP2 IP2 IP2 IP2 IP2 TODDVILLE IP2 13-MAR-03 o4f.s
IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0
'-? Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTAcHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paqe I of 1 I 'Entery CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES TO: DISTRIBUTION DATE:
69/2003 TRANSMITTAL NO: 28226 (Circle one)
FROM: IPEC DOCUMENT CONTROL: EEC or IP2 53'EL PHONE NUMBER: 271-7057 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
AFFECTED DOCUMENT:
EMERGENCY PLANNING PROCEDURE:
IP3 DOC #
REV#
TITLE I
INSTRUCTIONS NOTE: REPLACE CURRENT INDEX WITH ATTACHED REVISED INDEX.
THE FOLLOWING PROCEDURE HAS BEEN REVISED. REPLACE CURRENT COPY WITH ATTACHED REVISED COPY:
IP-1053 REV.14
- PLEASE NOTE EFFECTIVE DATE********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
NAME (PRINT)
SIGNATURE DATE CC#
NAME (PRINT)
SIGNATURE DATE CC#
TO:
FROM:
Nuclear Regulatory Commission 240 r" IPEC Emergency Planning
SUBJECT:
Emergency Planning Document Update Date: 6/06/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.
Please sign this memo indicating that you have completed the update as specified and return to:
Entergy Nuclear Indian Point Nuclear Generating Station Records and Documents Department Broadway & Bleakley Aves.
Buchanan, NY 10511 Attn: Document Custodian Update completed as specified:
Signature of ControiJed Copy Holder Date
- -0New S:0Old 7
7 DocumentNe Od Document Name Rev.
R Rev. #1 Instructions
- Date, Date Unit 3 IPEC Vol. III Emergency Plan Implementing Procedures TOC Table of Contents 5/19/03 5/05/03 Replace old with new Rev. 14 Rev. 13 Replace old with IP-1053 Evacuation of Site 6/06/03 03/02 new r
~Date Signature of Controlled Copy Holder
VOLUME III TABLE OF CONTENTS 06/06/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO.
3 NUCLEAR POWER PLANT EMERGENCY PLAN -
VOLUME III IMPLEMENTING PROCEDURES TABLE OF CONTENTS PROCEDURE #
PROCEDURE TITLE Dose Assessment Determining the Magnitude of Release Replaced by IP-EP-310 Post-Accident Monitoring of Noble Gas Concentration in Plant Vent Obtaining Meteorological Data Replaced by IP-EP-510 Midas Computer System Replaced by IP-EP-510 VOID N/A 4
02/99 VOID N/A VOID N/A Environmental Monitoring IP-1011 Offsite Monitoring/Site Perimeter Surveys IP-1012 Emergency Airborne Activity Determination IP-1015 Post-Accident Environmental Sampling and Counting Protective Actions IP-1017 IP-1019 Protective Action Recommendations for the Offsite Population Replaced by IP-EP-410 Emergency Use of Potassium Iodide (KI)
VOID N/A 10 11/02 Personnel Iniury IP-1021 Radiological Medical Emergency IP-1023 Use and Set Up of the IP3 Personnel Decon Suite Damage Assessment IP-1025 Repair and Corrective Action Teams IP-1027 Emergency Personnel Exposure IP-1028 Core Damage Assessment Notification and Communication IP-1038 Offsite Emergency Notifications IP-1039 Emergency Response Data System (ERDS)
Activation and Testing 25 VOID 12 13 9
VOID 4
06/98 N/A 12/9 8 12/02 06/98 N/A 02/01 i
IP-1001 IP-1002 IP-1003 IP-1004 REV.
DATE 24 4
7 05/99 02/99 12/98
VOLUME III TABLE OF CONTENTS 06/06/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO.
3 NUCLEAR POWER PLANT EMERGENCY PLAN -
VOLUME III IMPLEMENTING PROCEDURES TABLE OF CONTENTS PROCEDURE #
PROCEDURE TITLE REV.
DATE Emergency Response Facilities IP-1040 Habitability of the Emergency Response 17 11/02 Facilities and Assembly Areas IP-1041 Personnel Monitoring for EOF, TSC, OSC VOID N/A and Control Room Personnel Accountability and Evacuation IP-1050 Accountability 28 08/02 IP-1053 Evacuation of Site 14 06/03 IP-1054 Search and Rescue Teams 11 08/02 Non-Radiological Emergencies IP-1052 Hazardous Waste Emergency 8
07/02 IP-1055 Fire Emergency Response 15 04/02 IP-1056 Directing Fire Fighting Personnel in VOID N/A Controlled Area IP-1057 Natural Phenomena Emergency 8
10/01 IP-1058 Earthquake Emergency VOID N/A IP-1059 Air Raid Alert 7
05/01 H.P. Release Surveys and Decontamination IP-1060 Personnel Radiological Check and 12 02/03 Decontamination IP-1063 Vehicle/Equipment Radiological Check 12 11/02 and Decontamination Emergency Equipment and Maintenance IP-1070 Periodic Inventory of Emergency Plan 31 02/01 Equipment IP-1076 Roster Notification Methods VOID N/A Replaced by IP-EP-AD9 Refer to EP-AD04 for Rosters/ETD IP-1080 Conduct of Emergency Exercises and Drills VOID N/A IP-1085 Maintenance of Emergency Preparedness VOID N/A at IP-3 ii
a Entergy EMERGENCY PLAN PROCEDURES PROCEDURE NO.
TITLE:
IP-1053 EVACUATION OF SITE THIS PROCEDURE IS TSR X
THIS PROCEDURE IS NOT TSR IfN BY: -x 2
/
WRI T TEr REVIEWED BY:
APPROVED BY:
EFFECTIVE DATE:
0 S NAT U ATE pof(
(Y J
' /7SIGRNAURE/DATE
_6f c
4 Z
A, I
SNOSMIREY DATE b (D
- D- 0 3 14 44>/ 3 os 3z4 PROCEDURE USE IS REFERENCE v
REV.-
s v
VOLUME III IP-1053 Rev. 14 EVACUATION OF SITE TABLE OF CONTENTS SECTIN TITLE PAG 1.0 Purpose 1
2.0 Responsibilities 1
3.0 References 1
4.0 Procedure 1
5.0 Attachments 5.1 IPEC Assembly Areas and Evacuation Route Map
VOLUME III IP-1053 Rev. 14 IP-1053 EVACUATION OF SITE 1.0 PURPOSE This procedure provides criteria for evacuating non-essential personnel from the Indian Point (IP) Site and describes the actions to be followed.
2.0 RESPONSIBILITIES 2.1 The Emergency Director (ED) is responsible for determining when evacuation of non-essential personnel is required.
2.2 The Lead Accountability Officer (LAO) is responsible for coordinating evacuation of the assembly areas.
3.0 REFERENCES
3.1 Tables 4-1, "Initiating Conditions/Emergency Action Levels" 3.2 IP-1050, "Accountability" 4.0 PROCEDURE 4.1 CONSIDER evacuating non-essential personnel using the following criteria:
. Alert Emergency with potential for radioactive airborne releases;
- Site Area Emergency;
. General Emergency;
. Any condition in the opinion of the ED that warrants evacuation.
4.2 COORDINATE all decisions involving site evacuation through the Westchester County Emergency Operations Center (EOC) (via the Offsite Communicator).
4.3 DETERMINE if evacuees can be dismissed directly to their homes or if they must reassemble at the Service Center for contamination checks and decontamination.
IP-1053 Page 1 of 3 NOTE Non-essential personnel are individuals who do not have specific emergency response duties at IP, including visitors and contractor personnel.
The steps in this procedure are not required to be performed in sequence.
VOLUME III IP-1053 Rev. 14 4.4 Once an evacuation has been deemed necessary, ENSURE a safe and orderly evacuation by completing the following steps.
A.
IF there is no release, THEN DISMISS evacuees directly to their homes using private vehicles.
B.
IF a radioactive airborne release occurs or is imminent, THEN COMPLETE the following:
- 1.
CONTACT the Operations Support Center (OSC), H.P. Team Leader to request health physics assistance.
- 2.
REQUEST a Health Physics Technician (H.P.) to monitor the approved site evacuation route and vehicles for contamination.
- a.
IF no contamination, THEN DISMISS evacuees directly to their homes using private vehicles.
NOTE IF there has been a release with offsite as well as onsite contamination, THEN private vehicles can be released off site without going to the Service Center for decontamination.
- 3.
REQUEST a Health Physics Technician (H.P.) be dispatched to the assembly areas if evacuation route and vehicles are contaminated:
- a.
CHECK personnel and vehicles for contamination and advise the Radiological Assessment Team Leader (RATL) of any contamination found.
- b.
ACCOMPANY evacuees to the Service Center, and notify the ED upon their arrival.
- c.
DECONTAMINATE private vehicles before leaving the site.
- 4. 5 DETERMINE onsite evacuation route by using wind direction as one deciding factor. Another factor would be a Security Threat. See.1, "IPEC Assembly Areas and Evacuation Route' for map.
A During a Security Threat, contact Security to determine if evacuation is feasible and if so, which route to take.
B.
For Radiological release concerns;
- a.
Wind from the south (up valley flow):
USE the southerly route and enter the Service Center area.
- b.
Wind from the north (down valley flow):
USE the northerly route passing through the IP2 river front Security gate and up to the Service Center as instructed.
- c.
Wind cross valley:
DECIDE which route (north or south) to take or to have personnel remain in their assembly areas.
IP-1053 Page 2 of 3
VOLUME III IP-1053 Rev. 14 NOTE Assembly Area and Evacuation Route Maps are posted throughout the Site.
4.6 DIRECT the EOF Offsite Communicator to contact the Westchester County EOC to discuss the proposed off-site evacuation route with the Director of the Office of Disaster and Emergency Services in order to assure that movement from the Site is coordinated with the County plans and actions.
4.7 ENSURE IP-2 Security is advised of the pending evacuation (via the Security Team Leader) so all routes necessary for evacuation are open through any IP2 gates.
4.8 CALL the LAO to advise him/her of the pending evacuation and instructions to be provided to the effected personnel.
A.
The LAO shall advise Security, Energy Education Center Assembly Area Coordinator and the Training Building Hall Monitor of the following:
. Pending site evacuation;
. Route to take off-site;
. Mode of transportation to use;
. Go home or reassemble at the Service Center for contamination checks.
B.
The LAO shall call the IP3 ED via the EOF Onsite Radiological Communicator and the IP3 Security Team Leader during on hours or the IP3 Shift Manager (Control Room) during off hours for an IP3 event or the IP2 Emergency Director via the IP2 EOF Manager during on hours or the IP2 Shift Manager (Control Room) during off hours for an IP2 event when evacuation of non-essential personnel is complete. See Volume II, Appendix C for the phone numbers.
4.9 DIRECT the Control Room to make the following announcement via plant page:
'Attention all NON-ESSENTIAL personnel, you are directed to evacuate the Site using (the mode of transportation selected) and to go (to the selected destination). Use the (selected route)'.
REPEAT THE PAGE.
5.0 ATTACHMENTS 5.1 IPEC Assembly Areas and Evacuation Routes Map END OF TEXT IP-1053 Page 3 of 3
VOLUME III IP-1053 Rev. 14 Page 1 of 1 ATTACHMENT 5.1 IPEC ASSEMBLY AREAS AND EVACUATION ROUTES Hudson River is--,
SltlAh INDIAN POINT ENERGY CENTER r
UNIT 2 Buildings l
UNIT 3 Buildings EVACUATiON ROUTtS CD ASSEMDLY AREAS T.1T Parldng Ares ()
S.curtly Bases Slt oundary
/
\\
("cm, 3%
~~~~~~~~~~~~~~~~~~~~~~~~~~~
OWtq. siftnfl ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i LJLJ l*4C~~
(ad 3 ~
~
WY~~~~~~~'0 P49 U~~~~~~~l~~~l TOL N~~~~~~
i r IPEC.SM-.TR06.OWC 08/22/2002 NOT TO SCALE I
,II
VOLUME III IP-1053 Rev. 14 Page 1 of 1 PROCEDURE #:
IP-1053 NEW YORK POWER AUTHORITY INDIAN POINT NO.
3 NUCLEAR POWER PLANT PROCEDURE TITLE:
EVACUATION OF SITE REVISED BY MAC MAGS MAGS MAC/D.BELL
/
DATE 3 3/87 12 /87 10 /89 5i/90 MAGS/MAC 6/92 MAGS/MAC 4/94 MAGS
/ CHARLIE 10/94 MAC/MATTY/LAURIE 9/96 REASONS FOR CHANGE Biennial review.
New may of EOF. transportation changes.
Biennial review -
no change.
Sec. Team Leader to notify IP3. CAS to notify IP-2 CAS regarding pendina evacuation throuah Con Ed property.
offsite Comm. to notify West, Co. EOC.
AP-3 format chanae. biennial review, add statement for ED to notify Con Ed of IP3 evacuation.
Biennial review. format chanaes. Table of Contents &
responsibilities.
CHANGED USE TO CONSIDER EVAC./REMOVED RATL RESPONSIBILTY Step 4.5. changed layout of sentence to show condition first and remove "once site acct. has been completed.
spell out RATL. chanae Ass. Area Acct. Officers to Ass.
)/
REV 4
5 7
8 9
10
VOLUME III IP-1053 Rev. 14 Page 1 of 1 NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT PROCEDURE TITLE:
PROCEDURE #:
DVITCT;n V
REV A
/
flAMP REASONS FOR CHANGE area Hall Montiors
)
,)
-L I
^
1 S
Vs 4