Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20044B042 + (Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program)
- ML20199C701 + (Rev 3 to Canister Handling & Preparation for Shipment)
- ML20076K474 + (Rev 3 to Catawba Unit 2 Cycle 7 Colr)
- ML20237A960 + (Rev 3 to Certificate of Compliance 5580,Rev 3,for Model S5W Power Unit.Approval Record Encl)
- ML18068A712 + (Rev 3 to Chapter 12 of Zion Station Odcm)
- ML20205J334 + (Rev 3 to Comanche Peak Response Team Program Plan & Issue-Specific Action Plans)
- ML17286A890 + (Rev 3 to Confirmatory Action Ltr CAL-91-01 Re Understanding of Actions Taken or to Be Taken to Ensure That Deficiencies in Licensed Operator Requalification Program Promptly Corrected)
- ML20211E964 + (Rev 3 to Conformance to Generic Ltr 83-28,Item 3.1.3 & 3.2.3,Braidwood Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station)
- ML20204H714 + (Rev 3 to Conformed Spec SP-562-4549-00, Class 1E Diesel Generator Units)
- ML20217M697 + (Rev 3 to Const Environ,Safety & Health Mgt Plan ESH-2, Energy Source Lockout/Tagout Procedure)
- ML20137G337 + (Rev 3 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations)
- ML20202A726 + (Rev 3 to Const Procedure 35-1195-DCP-3, Reproduction)
- ML20138P287 + (Rev 3 to Const Procedure CCP-40, Protective Coatings of Concrete Surfaces, Incorporating Document Change Notice 1-3)
- ML20214G963 + (Rev 3 to Const Specification N2M-865, Field Fabrication, Assembly Exam & Tests for Pipe & Duct Sys)
- ML20127C304 + (Rev 3 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20213D415 + (Rev 3 to Contact Between Dissimilar Metals)
- ML17335A230 + (Rev 3 to Cook Nuclear Plant Restart Plan)
- ML20098B020 + (Rev 3 to Cooper Nuclear Station Startup & Power Ascension Plan)
- ML20081D145 + (Rev 3 to Core Operating Limits Rept)
- ML20067E559 + (Rev 3 to Core Operating Limits Rept Unit 1 - Cycle 14)
- ML20101S686 + (Rev 3 to Core Operating Limits Rept for Limerick Generating Station,Unit 2,Cycle 2)
- ML18057A405 + (Rev 3 to Core Seismic Input Palisades Nuclear Power Plant)
- ML20209H586 + (Rev 3 to Course of Action)
- ML20247C183 + (Rev 3 to Crisis Mgt Plan Implementing Procedure EDA-9, Environ Monitoring for Emergency Conditions for McGuire Nuclear Station)
- ML20114B963 + (Rev 3 to Criticality Safety Evaluation of TMI Fuel Storage Facilities W/Fuel of 5% Enrichment)
- ML20035D960 + (Rev 3 to Critically Safety Engineering Rept)
- ML20095F538 + (Rev 3 to Cycle 18,COLR)
- ML20094H610 + (Rev 3 to Cycle 8 Core Operating Limits Rept)
- ML20202J066 + (Rev 3 to DAP-1, Preparation & Review of Criteria Lists)
- ML20202J224 + (Rev 3 to DAP-10, Development & Use of Procedures & Discipline Instructions)
- ML20202J073 + (Rev 3 to DAP-2, Documentation & Tracking of Issues & Discrepancies)
- ML20202J118 + (Rev 3 to DAP-4, Preparation of Checklists)
- ML20199L182 + (Rev 3 to DB-OP-00000, Conduct of Operations)
- ML17334B357 + (Rev 3 to DC Cook Nuclear Plant Unit 1 Inservice Testing Valve Program)
- ML17334B356 + (Rev 3 to DC Cook Nuclear Plant Unit 2 Inservice Testing Valve Program)
- ML20141H150 + (Rev 3 to DE-AC03-90SF18495, Simplified Passive Advanced LWR Plant Program,AP600 Certified Design Matl)
- ML20141G634 + (Rev 3 to DOE/AL-62350-187, Long-Term Surveillance Plan for Falls City Disposal Site Falls City,Tx)
- ML20129F319 + (Rev 3 to DOE/AL/62350-129, Completion Rept for Umtra Project Vitro Processing Site,Salt Lake City,Ut)
- ML20138C865 + (Rev 3 to DOE/AL/62350-187, Long-Term Surveillance Plan for Falls City Disposal Site,Falls City,Tx)
- ML20138C970 + (Rev 3 to DOE/AL/62350-187, Long-Term Surveillance Plan for Falls City Disposal Site,Falls City,Tx)
- ML20095K413 + (Rev 3 to Decommissioning Plan)
- ML19354E820 + (Rev 3 to Defueling Completion Rept)
- ML20090L077 + (Rev 3 to Demonstration of Raychem Cable for Qualified Use in Class IE Svc:Primary & Secondary Containment for Brunswick Steam Electric Plant - Units 1 & 2 Outline)
- ML20151A436 + (Rev 3 to Dept QA Procedure E&C 24-10-17, Interim Design Change Notice (Idcn)/Design Change Notice (Dcn) for San Onofre Nuclear Generating Station 1,2 & 3. Proposed Change Notices 1,2,3 & 4 Encl)
- ML20215J931 + (Rev 3 to Design Adequacy Procedure DAP-19, Processing & Review of Info Between Quality of Const,Qa/Qc Adequacy Program & Design Adequacy Program)
- ML20236P038 + (Rev 3 to Design Adequacy Procedure DAP-14, Design Adequacy Program Records)
- ML20215J948 + (Rev 3 to Design Adequacy Procedure DAP-20, DAP Overview of Activities Performed by Comanche Peak Steam Electric Sys Project or Other External Organizations)
- ML20215J844 + (Rev 3 to Design Adequacy Procedure DAP-5, Review of Calculations,Evaluations & Other Implementing Documents)
- ML20215J854 + (Rev 3 to Design Adequacy Procedure DAP-6, Review of Drawings,Specs & Other Design Output Documents)
- ML20215J913 + (Rev 3 to Design Adequacy Procedure DAP-8, Preparation of Engineering Evaluations)
- ML20236N946 + (Rev 3 to Design Adequacy Procedure Discipline Instruction DDI-M-003, Technical Adequacy Review of Nonconformance Repts)