Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133Q337 + (Rev 2 to Operating Instruction SO23-0-35, Procedure Mod Permit)
- ML17216A310 + (Rev 2 to Operating Procedure 0030119, Post-Trip Review)
- ML20077M694 + (Rev 2 to Operating Procedure 1104-28I, Hittman Nuclear & Developmental Corp Process Control Program)
- ML20212P790 + (Rev 2 to Operating Procedure B.2A, Plant Operation W/Either or Both DHS Trains Not Operable)
- ML20198C782 + (Rev 2 to Operating Procedures,Acceptance Test & Maint Program, Exposure Device,IR-100)
- ML20079B124 + (Rev 2 to Operational Safety Requirement OSR/GP-7, Criticality Safety for Liquid Transfers)
- PY-CEI-NRR-0430, Rev 2 to Operations Manual OM12D, Offsite Dose Calculation Manual + (Rev 2 to Operations Manual OM12D, Offsite Dose Calculation Manual)
- ML20212C061 + (Rev 2 to Operations Mgt Manual Procedure OMM-006, Emergency Operating Procedure Writers Guide)
- ML17299B050 + (Rev 2 to Operations Procedure 42AO-2ZZ50, Venting Charging Pumps)
- ML20090L707 + (Rev 2 to Operator Requalification Program)
- ML20154L528 + (Rev 2 to Operator Requalification Program)
- ML20150B449 + (Rev 2 to Operator Requalification Program)
- ML20216K064 + (Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program)
- ML20205E705 + (Rev 2 to Oyster Creek Nuclear Generating Station Procedure 105.3, Maint of Oyster Creek Environ Qualified Equipment)
- ML20147H791 + (Rev 2 to PCI-TR-402, Decontamination & Decommissioning Plan for Quehanna,Pa Site)
- ML20206D897 + (Rev 2 to PECO-COLR-L1R7, COLR for Lgs,Unit 2 Reload 7, Cycle 8)
- ML20199E328 + (Rev 2 to PECO-COLR-L2R4, COLR for Lgs,Unit 2,Reload 4,Cycle 5)
- ML20212H631 + (Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13)
- ML20217G998 + (Rev 2 to PECO-COLR-P3C12, COLR for PBAPS Unit 3 Reload 11, Cycle 12)
- ML19332C620 + (Rev 2 to PGE-1048, Trojan Nuclear Plant Inservice Testing Program for Pumps & Valves,Second 10-Yr Interval)
- ML20132G283 + (Rev 2 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan)
- ML20211E095 + (Rev 2 to PI-01, Sys Vertical Slice Review (Svsr) Project Instruction:Svsr Implementation Checklists & Workbook)
- ML20148N988 + (Rev 2 to PI-MP3-01, Independent Corrective Action Verification Program Communications Protocol)
- ML20141E472 + (Rev 2 to PI-MP3-02, Review of Sys Design for Compliance W/Design & Licensing Basis)
- ML20210U374 + (Rev 2 to PI-MP3-03, Review of Plant Mods Prepared After Receipt of Operating License for Technical Adequacy & for Configuration Control)
- ML20141E487 + (Rev 2 to PI-MP3-04, Programmatic Reviews)
- ML20210U392 + (Rev 2 to PI-MP3-06, Project Instruction PI-MP3-06)
- ML20203F675 + (Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems)
- ML20210U403 + (Rev 2 to PI-MP3-09, Preparation & Approval of Checklists)
- ML20141E492 + (Rev 2 to PI-MP3-11, Discrepancy Rept Submittal & Closure)
- ML20151X872 + (Rev 2 to PM-1010, RHR Pump Npsh)
- ML20151X881 + (Rev 2 to PM-1011, Core Spray Pump Npsh)
- ML17164A589 + (Rev 2 to PP&L SSES Odcm)
- ML20199L011 + (Rev 2 to PP-04, Regulatory Review Procedure)
- ML20105A900 + (Rev 2 to PRA North Anna Power Station Svc Water Preservation Project,Part One, Final Rept)
- ML13329A721 + (Rev 2 to PRA-1-91-016, Probabilistic Risk Assessment Evaluation of Proposed CCW Heat Exchanger Allowed Outage Time)
- ML20141D282 + (Rev 2 to PRA96NQA-01093-S3, MP3 Maint Performance Criteria)
- ML20238A181 + (Rev 2 to PRCP-A, Process Control Program for Dewatering Wet Radioactive Solid Waste)
- ML20112A664 + (Rev 2 to PSAR Chapter 17, Qa)
- ML17229B084 + (Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines)
- ML20217B628 + (Rev 2 to PSR-15, Vitrification Facility Non-Radiological Sys Monitoring Requirements. W/Index)
- ML20138D698 + (Rev 2 to PSR-17, Min Staffing Levels for Safe Facility Operation)
- ML17313A670 + (Rev 2 to PVNGS Unit 2 Colr)
- ML17312B600 + (Rev 2 to PVNGS Unit 2 Cycle 7 Colr)
- ML13310B081 + (Rev 2 to PWR Safety & Relief Valve Test Program,Porv Block Valve Adequacy Rept for Southern California Edison,San Onofre Unit 1)
- ML18065A538 + (Rev 2 to Palisades Plant Colr)
- ML20138K590 + (Rev 2 to Pc 23,Part 5, Charging Pump Preventative Maint)
- ML20056G009 + (Rev 2 to Pcp)
- ML20235Z180 + (Rev 2 to Pennsylvania Power & Light Co Approach to Risk Mgt & Risk Assessment)
- ML20056D601 + (Rev 2 to Performance Test Procedure 2-PT-24.6.4, SWS Hydraulic Performance Test for Bsep,Unit 2)
- ML20045D379 + (Rev 2 to Performance Testing Procedure PT-340, Acceptance Criteria)