Rev 2 to Operating Instruction SO23-0-35, Procedure Mod Permit
ML20133Q337
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/18/1985
From: Michael Jones, Morgan H
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20132C709 List:
References
FOIA-85-425 SO23--35, SO23-0-35, NUDOCS 8508150103
Download: ML20133Q337 (8)


Text

(,: _.

I - H - 9c NUCLEAR GENERATION SITE UNITS 2 AND 3 OPERATING INSTRUCTION $023-0-35 REVISION 2

)

ATTACHMENT 4 PAGE 22 0F 28 PROCEDURE MODIFICATION PERMIT 7C Y 2-1 Permit No.

m Unit 2

L-J 3, 'm Page l of 2

- J Common NOTE:

This document will be used to authorize procedure modifications and document the appropriate review and approval.

1.

Affected procedure number G 27 D. 7 Rev. or TCN _

~7 - h 2.

On page 2 Provide details of the modification.

in Section 2.1 that were left blank.

Line through all spaces 3.

conditions affecting the indicated Step (s) change.R 4.

Does this permit pose an unreviewed safety question per 10 CFR $0.59 i the consequen;ces.e., does it increase the probability of occurrence or accident; or reduce the Tech. Spec margin of safety? YESo If yes, then a procedure modification is ng authorized.NO V PREPARED BY: _ /Y7 A

)

~

3 0 /l/ 0

[- / /-8f _ /O'/[

Oate Time INITIAL APPROVAL Reviewed and Approved By:

l Plant Manageme _nt St

/-/t/-83' Operations

__jgs(*

Date Time Mo

/-1it-87~~

_,o y(

5entbr Reactor p fator Date Time Initial Approv required prior to use FINAL APPROVAL Reviewed and Approved By:

1 WW

  • ikhV 8.' &

Manager, Operations

(.)

~

Date

~

~

Time '

Final Approval shall be within fourteen days of Initial Approval l

8508150103 050717 PDR FDIA BELL 85-425 PDR 22179 ATTACHMENT 4 PAGE 10F 2 I

( nm i

NUCLEAR GENERATION SITE UNITS 2 AND 3 OPERATING INSTRUCTION 5023-0-35 REV1510N 2 ATTACHMENT 4 PAGE 23 0F 28

)

PROCEDURE MODIFICATION PERMIT Permit No. _ l

[(N 2-1,

~

Unit b m

m Page 3 of 1 ~

2 L-83 L-8 Common Affected procedure number _500-3-2. 7t Rev. or TCN 7' b.

1.0 PREREQUISITES INITIALS /DATE 1.1

-frior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy and any TCNs or by use of the method described in 50123-VI-0.9 i-sY-8 C 1.1.1 List any applicable TCNs or write N/A.

V d 'f 2.0 PROCEDURE

/i-/V-FI

~

2.1 List the step (s and reason for m)aking it:to be modified, describe the modification, l Number (s) ll Step Modification l

Reason For l SRO Ops. I l

Description t_

,i Modification i

l23 l

lSupv. Init.l

~

)

.l o.2. S.1-l b

l A/OT Remoutn6 Po19l i

fRon SE Rvict lnn*fll

\\

('

l I

t l

I I

I l

"N!

i 3

x l

l is N

1 i

l 1

l F

I I

I l

I I

I i

l I

l I

I i

I l

\\

o I

l

{

\\

I 1

I File Disposition:

procedure or attachment and send a copy of the permit tAfter Initial A Supervisor.

o the Ops. Procedures Sent to Ops. Proc. Supy

.0. Initials) 22179 ATTACHMENT 4 PAGE 2 0F 2

9 -/2 4 7 NUCLEAR GENERATION SITE UNITS 2 AND 3 OPERATING' INSTRUCTION $023-0-35 REVISION 2

)

ATTACHMENT 4 PAGE 22 0F 28 PROCEDURE HDDIFICATION PERMIT: CN 2-1 c1 rm r,

Page 1 of 1 Unit W t--83 L--8 Common

~~--

~

NOTE:

This document will be used to authorize procedure modifications and document the appropriate review and approval.

Q,$1 1.

Affected procedure number kD23-3-2.7

_ Rev. or TCH 7-8 2.

On page 2 Provide details of the modification.

in Section 2.I that were left blank.

Line through all spaces 3.

conditions affecting the indicated Step (s) change.Re-ev 4

Does this permit pose an unreviewed safety question per 10 CFR 50.59 i the consequen;ces.e., does it increase the probability of o accider,t; or reduce the Tech. Spec. margin of safety? YES If yes, then a procedure modification is ng authorized.

,___ NO i PREPARED BY: ImMeg 7 Mod A-M -8[ 10 $o j

Date

~ Time INITIAL APPROVAL l Reviewed and Approved By:

j' I JLA~

1 U.J-i d>W l

P an Ma gement ff-Opgeations~

Dat'e

~

p.sr Time '

l i '

Se or Reactor Operator D/D/d3

//oo

'Date Time

_. Initial Approval required prior to use I

l I

FINAL APPROVAL l Reviewed and Approved By:

l N

la< 'N-d ?N u=_---

)

Ran&ger, Ope (4tions V

}l/9A5~

_ //08 1

'Da t'e Time l

Final Approval shall be within fourteen days of Initial Appr 1

I oval l

1 I

22179 ATTAC0 MENT 4 PAGE 10F 2

s NUCLEAR GENERATION SITE UNITS 2 AND 3 OPERATING INSTRUCTION 5023-0-35.

REVISION 2 PAGE 23 0F 28 ATTACHMENT 4 PROCEDURE MODIFICATION PERMIT [(k 2-1, I

Permit No, m

n Page 2 of *1.

~

Unit 2

L-8 3 t-3 Common Affected procedure number 5c23-3-2 7 Afl. 0Rev. or TCN ~7 4.

1.0 PREREQUISITES I_NITIALS/DATE 1.1

-trior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy and any TCNs or by use of the method described in 50123-VI-0.9 f f 7A) / Alex//'/~

1.1.1 List any applicable TCNs or write N/A.

O'l N /Nok8C 2.0

_ PROCEDURE

~

2.1

'and reason for making it: List the step (s) to be modified, describ i

l Step l

Modification l

Reason For l SRO Ops. l l Number (s) 1 Description 1

l Modification lSupv. Init.1 l11. 8 TifAW j

(%/4G h> A e~

l ifp(J J P-ON l).I4 I

w, n m.s otos we l M"y<L ** %'^ %y bg ll

)

JY I

I I. u-vcy<

d.sc.wv s.

I v

uuJue neeAs

  • I I'

opene4 i

l2.I. l5 T" i Ps.kG pA oow VA fss of P" V

b.t.M l r vennS A c(-44 85

  • l l 59 2.2 Twaj
  1. Tj[#

l puu.c g/a w j psc o,3 &

'J

'Swp A.3 I

eg.n u s w w-I ot.9 w l 4. M.;

d h ]I

[

~A

[

(

i k

e l

l l

1 l

L i

I I

I I

I I

4 i

i s

File Disposition:

procedure or attachment and send a copy of the permit to th Supervisor.

. Procedures I

sent to Ops. Proc. Supv. -

(C.0. Initials) 2217g 1

ATTACHMENT 4 PAGE 2 0F 2 t

.n

l - rq. ' '

NUCLEAR GENERATION SITE UNITS 2 AND 3 OpERATI M INSTRUCTION 5023-0-35 REVISION 2

)

ATTACHMENT 4 pAGE 22 0F 28 PROCEDURE MODIFICATION PERMITThK2"l permit No.

m m

Unit 2 U 3, U Common Page l of 2 NOTE:

This document wil1 be used to authorize procedure modifications and document the appropriate review and approva l, 1.

~

Affected procedure number Ann _3-3.7 Rev. or TCN _

'7 -

2.

On page 2 Provide details of the modification.

in Section 2.1 that were left blank.

Line through all spaces 3.

conditions affecting the indicated Step (s) change.

4 Does this permit pose an unreviewed safety question per 10 CFR 50.59 1 the consequen;ces.e., does it increase the probability of occurrence or of an accident; create the possibility of a differen accident; or reduce the Tech. Spec. margin of safety? YES If yes, then a procedure modification is no,t authorized NO ot PREPARED BY: _ /// A 3[)A/E_$

)

L-/V-8f _ /O'/t Date Time

_ INITIAL APPROVAL

' Reviewed and Approved By:

{

Plant Manageme~nt St

/~/U-Ob' Operations ~

Ath~

Oate

/779o Time i

l Sentbr Reactor H4-81~

sovr l

\\

p ator Date Time ~

l Initial Approv required prior to use t

e y

l I

FINAL APPROVAL Reviewed and Approved By:

l 1

i 1 I YLW SYhV Manager, Operations Date

~

_0: Y

()

Ilme ~

l Final Approval shall be within fourteen days of Initial App i

roval l.

22179 ATTAC0 MENT 4 PAGE 10F 2 10-i

d NUCLEAR GENERATION SITE UNITS 2 AND 3 OPERATING INSTRUCTION 5023-0-35 REVISION 2 ATTACHMENT 4 PAGE 23 0F 28 PROCEDURE MODiFICAT!DN PERMITTCN 2-1 Permit No. _ l m

m Page 2 of A -

Unit 2 L J3 L 8 Common Af fected procedure number 5th3 2. 7, Rev. or TCN 7-S 1.0 PREREQUISITES u

INITIALS /DATE 1.1

-frior to use of an uncontrolled (pink) copy of thf s Station Document to perform work, vertfy that it is current by checking a controlled copy and any TCNs or by use of the method described in 50123-VI-0.9

//M

/i tY'8C 2.1.1 List any appitcable TCNs or write N/A.

(/

S ~f 2.0 PROCEDURE

/ o 5' I

~

2.1 and reason for making it: List the step (s) to be modified, descr

'e l

Step Modification l

Reason For l SRO Ops. I

{ Number (s) ll Description l

Modification l23 l

ISupv. Init.1

)

.la.2 5.9-.! YA lnoT Removin Ponl l

\\ fron SERvict ltrn'f' !

('

l l

t l

l l

l i

"m j

j l

m l

I I

(

I I

I I

I I

I, I

I t

i i

I, I

l

\\o l

I l

1-i l

1 l

\\

l

\\

l I

1 1

I I

i 1

l File Disposition:

procedure or attachment and send a copy of the permit tAfter Initi Supervisor.

o the Ops. Procedures Sent to Ops. Proc. Supy

.0. Initials) 22179 ATTACHMENT 4 PAGE 2 0F 2

T: &

. NUCLEAR GliNERAI/ON SITE UNITS 2 AND 3 OPERATING INSTRUCTION 5023-0-35 REVISION 2 PAGE 20 0F 28 ATTACHMENT 2 PROCEDURE SIGNATURE SUPPLEMENT Sheet 1_

l of _

AFFECTED PROCEDURE: 50 __ 0 3 2.7 CHECKLIST NUMBER:

REVISION 7

TCN ~7-T 9

REVISION r7 TCN W PERFORMED BY[0PERAT R/INIT FATE /

PERFORMED BY:

TIME OPERATOR /lNIT DATE/IIME PERFORMED BY:

/r # Yv5 b

b ' PERFORMED BY:

/

BU} TOR /lN T OATE/IIME OPERATOR /INIf DATE/ TIME PERFORMED BY-

, d l'lfffM5'W PERFORMED BY:

0 ~RATO

NIT DATE/ TIME OPERATOR /INIT DATE/ TIME

.. PERFORMED.B.Y: d A N 59 6 M

  • OP3tATOR/INIT DATE/IIME PERFORMED.BY:._

. PERFORMED BY _

. OPERATOR /INIT DATE/ TIME

, OPERATO 1 NIT 0 TE/ TIME PERFORMED BY:

VERIFIED. BY: _O

' OPERATOR /INIT DATE/ TIME

)

OP@

R/ NIT DATE/ TIME

'VEntFIED BY: _

VERIFIED BY:

/-tv-Kr

.0PERATOR/INIT DATE/ TIME 06o s' VERIFIED BY:

/0PE I

TE/ TIME

/-/ y 'i' 6PERATOR/INIT DATE/ TIME VERIFIED BY: /.

04 #

//DfIOR/INITDATE/TW VERIFIED BY:

1 0PERATOR/INIT DATE/ TIME

~0PERATOR/INIT DATE/IIME 6PERATOR/INIT DATE/ TIME

, OPERATOR /INIT DATE/ TIME OPERATbR/INITDATE/ TIME ~

INDEP. VER. BY: _ OPERATOR /INIT DATE/ TIME _

OPERATOR /INIT DATE/ TIME INDEP. VER. BY: _ OPERATOR /INIT DATE/ TIME INDEP..VER. BY:

OPERATOR /INIT DATE/ TIME ~

INDEP. VER. BY: _ OPERATOR /INIT DATE/IIME INDEP. VER. BY: _

INDEP. VER. BY:

OPERATOR /INIT DATE/ TIME y:^

__ OPERATOR /INIT DATE/ TIME INDEP. VER. BY: -

INDEP. VER. BY:

0PERATOR/INIT DATE/ TIME

}

~~'

i)PERATOR/INIT DATE/ TIME INDEP. VER. BY:

OPERATOR /INIT DATE/ TIME ~

22179 ATTACHMENT 2 PAGE I 0F I

... w

. NUCLEAR GENERAii0N SITE UNITS 2 N O 3 OPERATING JNSTRUCTION 5023-0-35 REVISION 2 PAGE 20 0F 28 ATTACHMENT 2 PROCEDURE SIGNATURE SUPPLEMENT

~

Sheet' l

of _

AFFECTED PROCEDURE: 50 93 2.7 l

REVISION

~7 TCN ~7-T CHECKLIST NUMBER:

Q REVISION r7 TCN J -gs 13TmR$

PERFORMED BY[dPERAT R/INIT FATE h

PERFORMED BY:

/ TIME OPERATOR /INIT DATE/ TIME PERFORMED BY:

/ #

7v$

b@

/

' PERFORMED BY:

"m) TOR /lN. I DATE/IIME OPERATOR /INIT DATE/ TIME

[L A l-IfffM5'3Y PERFORMED BY:

PERFORMED BY-0 RATOR/lNIT DATE/ TIME OPERATOR /INIT DATE/ TIME PERFORMED,B.Y:

/M NMT M iPERFORMED.BY:' OPERAT

OPERATOR /INIT DATE/ TIME

. PERFORMED BY:

PERFORMED BY:

16PERATO NIT 0 TE/IlME

' DPERATOR/INIT DATE/ TIME VERIFIED. BY:

  • b

' VERIFIED BY:

)

OPgRA R/ NIT DATE/ TIME

/- t v -Kr~

0PERATOR/INIT DATE/ TIME ~

VERIFIED BY:

f,nf M M 06ar s'

VERIFIED BY:

/0PE fir TE/ TIME l-/ y 'S' 6PERATOR/INIT DATE/ TIME ~

VERIFIED BY: /.

04 #

/APyTOR/INIT DATE/ TIME VERIFIED BY:

0PERATOR/INIT DATE/ TIME VERIFIED BY:

OPERATOR /INIT DATE/IIME VERIFIED BY:

OPERATOR /INIT DATE/ TIME _

VERIFIED BY: _ OPERATOR /INIT DATE/ TIME VERIFIED BY: _

OPERATOR /INIT DATE/ TIME _

INDEP. VER. BY:

OPERATOR /INIT DATE/ TIME ~ INDEP. VER. BY:

' OPERATOR /INIT DATE/ TIME ~

INDEP. VER. BY: _

INDEP...VER. BY:

OPERATOR /INIT DATE/ TIME OPERATOR /INIT DATE/ TIME INDEP. VER. BY: _ OPERATOR /INIT DATE/ TIME INDEP. VER. BY: __

OPERATOR /INIT DATE/ TIME INDEP. VER. BY:

yta

_ OPERATOR /INIT DATE/IIME INDEP. VER. BY:

OPERATOR /INIT DATE/ TIME INDEP. VER. BY:

}

T)PERATOR/INIT DATE/ TIME INDEP. VER. BY:

dPERATOR/INIT DATE/ TIME 22179 ATTACHMENT 2 PAGE I 0F 1