ML20210U403

From kanterella
Jump to navigation Jump to search
Rev 2 to PI-MP3-09, Preparation & Approval of Checklists
ML20210U403
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/16/1997
From: Bass K, Neri A, Tom Ryan
SARGENT & LUNDY, INC.
To:
Shared Package
ML20210U355 List:
References
PI-MP3-09, PI-MP3-9, NUDOCS 9709190141
Download: ML20210U403 (7)


Text

_ _ . - ._ _ __

d gf PROJROT *

  • P~* "'

g INSTRUCTION > INSTRUCTION PI-MP349 REV. 2 l

Client- Northeast titilities l

Station umenn. iina 2

Title:

PPEPARATION AND APPROVAL OF CHECKLISTS 1

[ Safety Related Non Safety Related Reviewed By: Approved By:

System Lead Programmatic OSM Lead Accident QA Engineer Intemal Review Verification Lead Mitigation Committes Team Manager j l Lead Chairman g, Kj4,97

{ kwb& htfy ffb.ku  :

^

o W,0k Deschption ff J

())

U' R;v. 2 o Clarified use of revised checklists.

4 9709190141 970917 PDR ADOCK 05000423 Pa9e 1 of 5 P PDR

($* "

PROJECT INSTRUCTION PI-MP3-09 INSTRUCTION REV.2 1.0 PURPOSE This project instruction (PI) establishes the Sargent & Lundy procedure for preparing checklists to be used in the Independent Corrective Action Verification Program (ICAVP) reviews. These checklists shall be used by the ICAVP reviewers to document and verify key attributes and areas covered in the ICAVP These checklists will provide the team with the basis for determining if discrepancies exist in the design, configuration, and operation, maintenance and testing of the Millstene Unit 3 plant (MP3).

All areas of the ICAVP shall utilize checklists to control the review activities.

i These areas include;

  • System Reviews

. Operation, Maintenance and Testing Reviews

. Physical Configuration Reviews

. Programmatic Reviews

. Accident Mitigation Systems Review As many chechta as is required to adequately cover the particular review area

[ shall be utilized.

I 2.0 REFORENCES 2.1 ML3 Inw .lafety Analysis Report 2.2 MP3 Safety Evaluation Report 2.3 MP3 Technical Specifications 2.4 MP3 Design Criteria 2.5 10CFRr 0 Appendix A General Design Criteria 2.6 NRC Inspection Manual, Chapter 2535, Appendix A 3.0 DEFINITIONS 3.1 System Review-In depth review of the design of the systems in the scope of the ICAVP rO V

Page 2 of 5

' Gk "

1 g PROJECT INSTRUCTION

  • jd -

IN!iTRUC"lON PI-MP3-09 RE/ 2 3.2 Operation, Maintenance and Testing Review Review of the operating, maintenance and testing procedure 5, and training manuals for the systems within the scope of the ICAVP 3.3 Physical Configuration Review - Walkdowns to verify that the current as-built conditions are in conformance with the design and licensing basis for the systems within the scope of the ICAVP 3.4 Programmatic Review - Review of programs and processes addressing

" generic" (non-system specific) issues 3.5 Accident Mitigation System Review - Review of the critical design characteristics for the accident mitigating systems to ensure that they can perform their required safety functions.

4.0 RESPONSIBILITIES 4.1 A Verification Team (VT) Member shall be responsible for preparation of a checklist and for performing a review associated with a checklist.

4.2 The VT Lead or his designee shall be responsible for approving the

\

checklists in his area and for providing concurrence for the reviews conducted within his area.

4.3 The VT Manager shall be responsible for resolving comments which cannot be resolved between a team member (reviawer) and the Team Lead. The Verification Team Manager may also approve checklists.

5.0 PROCEDURE 5.1 Geneml The checklists are intended to assure that key issues associated with a particular area or element are adequately and consistently evaluated during the review process. Some checklists may De system specific, but many of the checklists will apply to elements that are common to many or all systems.

5.2 Checklist Preparation 5.2.1 Checklists shall be prepared prior to performing the affected review activities.

O Page 3 of S

1 1-PROJECT i INSTRUCTION: .

[#"" INSTRUCTION PI-MP3 09 REV, 2 i

a 1 5.2.2 The checklist shall be prepared by an individual knowledgeable in the area or element under review. The preparer may be the individual who

} will perform the review.

5.2.3 - The first page of the checklist shall use a form similar to that shown in l Attachment 7.2. The checklist shall contain questions related to key issues applicable to the area or element under review. Applicable j

checklists developed for previous project reviews may be utilized as a -

!- source for checklist preparation, input for checklist preparation may be l obtained from the following:

i

. MP3 Final Safety Analysis Report l

e MP3 Safety Evaluation Report

{ . MP3 Technical Specifications--

l . MP3 Design Criteria 3

e 10CFR50 Appendix A General Design Criteria e USNRC Regulatory Guides applicable to MP3

[ e industry Codes and Standards applicable to MP3 i

l In addition to the above MP3 source documents, S&L design experience and practices, as well as industry experience, shall provide a basis for j checklist preparation. Chapter 2535, " Design Verification Programs",

! Appendix A, of the NRC Inspection Manual also provides guidance for j checklist preparation, (Ref. 2.6).

l: Checklists shall address system design adequacy, component design -

l adequacy, design process adequacy, and plant procedure adequacy.

l Specific accept / reject criteria shall be provided for configuration reviews.

1 l 5.2.4 Checklists shall be numbered by each ICAVP group according to the

! following scheme:

i

} CK-MP3-M-M I

j Project Instruction Sequential Number Applicable to the Checklist i 5.2.5 The Team Member designated as preparer of the checklist shall sign and date the checklist. The checklist shall be approved by the j respective VT Lead or by the VT Manager.

5.2.6 The VT Lead shall file checklists in the project file in accordance with PI-j( MP3-12.

i l

4

, Page 4 of 5 i l

I

/

dit PROJECT INSTRUCTION

  • Y"'" / INSTRUCTION PI-MP3-09 REV. 2 bs V

4 5.3 Checklist Completion The ICAVP Verifier assigned to perform the evaluation of a particular area / element shall complete the appropriate checklist accordir'g to the requirements of the applicable project instruction and sign and date the l

checklist. It is recommended that the checklist be used to document the basis for accepting questionable items which might otherwise be considered discrepant by another reviewer. As a minimum, the appropriate VT Lead or his designee willindicate his concurrence with the review work performed by the ICAVP Venfier by also signing and dating the checklist. This concurrence will confirm that the checklist is complete and that there is adequate explanation describing the results.

j

' Concurrence shall not be given unlets there is documentation of those records and/or documents used in filling out the checklist.

' Any unresolved comments between the ICAVP reviewer and the VT Lead will be resolved by the VT Manager. Any differing professional

i opinions shall be handled in accordance with PI MP310.

Discrepancies identified as a result of the checklist review shall be processed in accordance with PI-MP3-11.

6.0 REVISIONS Any revisions to a checklist shall be prepared and approved in the same manner as the originalissue. The revision level of the checklist shall be indicated on the checklist. Any new or revised checklist shall be approved by the NRC. If a checklist revision is made subsequent to the completion of any reviews, the completed reviews shall be assessed for the effect of the checklist change, and a

updated, if required. Reviews not affected by the checklist change shall be so documented.

7,0 ATTACHMENTS 7.1 ICAVP Process Flowchart, " Checklist Preparation. Approval and Use" (1 page) 7.2 Sample Checklist Form (1 page) l 4

O Page 5 of 5

PI-MP3-09

/

Attachment 7,1

. 1 / Gather MP3 Data &

/ Questsons Related to Checklist

/

, Team Member rer#u wm '..y m ,.u 1r Prepare Checklist 4

Team Member M .:

v 1

Approve Checklist i

i Review Te Perform eviewper appbcable Checklist nequirements Verifier

~6 .m v

Review Concurrence g

File Checklist per PI-MP3-12 I

~

(CAVP PROCESS FLOWCHART Checkilst Preparation, Approval and Use

a PI MP3 09

. Anachment 7.2 Samole Checklist Cover Pane Northeast Utilities Millstone - Unit 3 Independent Corrective Action Verification Program (ICAVP)

System Review Checklist CK-MP3-02 -4.3, Rev, O Electrical Schematic Review Checklist O Prepared by:

Name Signature Date Approved by:

Name Signature Date l

IMPLEhENTATION System Document No./Rev.

Verified by: Date:

f') Concurrence by: Date:

V

. _ . - ---