Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Provides Supporting Info Re Operations QA Plan Change QA-026". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19207A388  + (Provides Supplemental Responses to IE Bulletins 79-01 & 01A Re Use of Asco Solenoid Valves.Valves Are Necessary to Containment Isolation & Failure Would Have Minimal Adverse Effects)
  • ML17216A586  + (Provides Supplemental Safety Evaluation of SPDS & Addresses Confirmatory Info Submitted w/850904 Ltr Re Variable Validation.No Serious Safety Questions Identified.Safety Assessment Sys Completion Schedule Requested within 30 Days)
  • ML13322B110  + (Provides Supplemental Schedule Info Re Installation of Automatic Vent Sys for Boric Acid Sys to Minimize Gas Binding.Addl Work to re-size Flow Orifices in Sys Scheduled for Completion During Cycle XI Refueling)
  • ML20203C836  + (Provides Supplemental Testimony to 860415 Hearing Before Commission for Inclusion Under Conclusions & Recommendations Category.Related Correspondence)
  • ML20040E467  + (Provides Supplementary Comments on Ofc of Inspector & Auditor Rept, Adequacy of IE Investigation 50-358/80-09... No Info Provided Re util-supplied Info Studied or Method of Confirmation of Suspicions)
  • ML17297B664  + (Provides Supplementary Info Re Accuracies & Response Time of post-accident Containment Instruments Per SER Section 6.2.1.1.Sump Water & Atmosphere Temp Monitors,Pressure Monitors & Water Level Instruments Addressed)
  • ML20024G496  + (Provides Supplementary Info Re First Monticello Reload)
  • ML17296A611  + (Provides Supplementary Info Re Violations Noted in IE Insp on 790319-23.Corrective Actions:Diesel Generator Supplier Will Make Appropriate Changes to Packaging & Shipping)
  • ML20203J018  + (Provides Supplementary Info Related to Closure of GL 89-10, Safety-Related MOV Testing & Surveillance, Dtd 890628. Issues Raised During NRC Insp 50-293/97-11 Re MOV follow-up & close-out Activities,Addressed)
  • ML18051B006  + (Provides Supplementary Info in Response to NRC 840424 Request Re 840423 Fire Protection - Exemption Requests & Modified Commitments. Addl Exemption Requests Also Encl)
  • GO2-91-218, Provides Supplementary Info in Support of 910123 Request for Amend to License NPF-21,revising TS 6.2.2.f  + (Provides Supplementary Info in Support of 910123 Request for Amend to License NPF-21,revising TS 6.2.2.f)
  • RBG-30186, Provides Supplementary Info on Roofing Program,As Committed in Util .Purpose of Built Up Roofing Is to Provide Drainage,Watertightness,Installation & Protection of Access Openings  + (Provides Supplementary Info on Roofing Program,As Committed in Util .Purpose of Built Up Roofing Is to Provide Drainage,Watertightness,Installation & Protection of Access Openings)
  • ML20210R625  + (Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant)
  • ML20134P468  + (Provides Supplementary Info to Application for License Per Request.G Mccann Left Dept & P Eastvold,Chief of Nuclear Matls Safety Div,New Contact.Dose Calibrator & Nuclear Medicine Sources Will Be Used at Temporary Job Sites)
  • ML18026B115  + (Provides Supplementary Info to NUREG-0313 Request for Addl Info.Delta Ferrite Readings Taken on Unit 3 Valve During Current Outage Show That Ferrite Content of Cast Austenitic Stainless Steel Ranges from 8% to 20%)
  • ML20235B917  + (Provides Supplementary Rept on Facility Based on ACRS 118th Meeting on 700205-07.ACRS Believes That Item Re Event of Pipe Rupture within Primary Containment Can Be Resolved During Const.Proposed Plant Can Be Constructed)
  • ML20235B978  + (Provides Supplementary Rept on Plant Based on ACRS 125th Meeting on 700917-19.Recommends That Regulatory Staff Make Arrangements W/Dod to Be Notified of Any Contemplated Changes in Nike Hercules Installation in Plant Area)
  • NPL-97-0476, Provides Supplementary Response to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, Dtd 950519.All Previously Docketed Evaluations of Reactor Pressure Vessel Integrity for Facility Remains Valid  + (Provides Supplementary Response to GL 92-01,Rev 1, Reactor Vessel Structural Integrity, Dtd 950519.All Previously Docketed Evaluations of Reactor Pressure Vessel Integrity for Facility Remains Valid)
  • GO2-85-702, Provides Supplementary Response to Generic Ltr 83-28, Focusing on Combination of Routine Procedure Reviews & Control of Vendor Info That Ensures Appropriate Guidance in Test & Maint Procedures or Tech Specs  + (Provides Supplementary Response to Generic Ltr 83-28, Focusing on Combination of Routine Procedure Reviews & Control of Vendor Info That Ensures Appropriate Guidance in Test & Maint Procedures or Tech Specs)
  • ML19254B439  + (Provides Supplementary Response to IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg by Youngstown Welding & Engineering Co. Util Has Not Used SA-312 Piping for in BWRs)
  • ML20199B661  + (Provides Supplementary Responses to NRC 970422 & 0725 Requests for Addl Info for LAR Re Change to Reactor Coolant Sys Flow Requirements to Allow Increased SG Tube Plugging)
  • ML20198S108  + (Provides Support & Concurrence to Comments Provided by Counterparts in Me Dept of Human Svcs Re Post Shutdown Decommissioning Activities Rept.Continued Scrutiny of Decommissioning of Plant,Urged)
  • ML17311A884  + (Provides Support to Industry Position W/Respect to Proposed Rev 10CFR50 App J, Containment Leakage Testing as Put Forth by Nuclear Energy Inst)
  • ML20072B607  + (Provides Supporting Comments Re NRC Proposed Options for Reduction in Scope of Random Testing Under 10CFR26)
  • BVY-98-107, Provides Supporting Documentation Re Hydrodynamic Vols for ECCS Suction Strainers Calculations.Attachment 1 Includes Duke Engineering & Svcs Summary Rept on Hydrodynamic Testing  + (Provides Supporting Documentation Re Hydrodynamic Vols for ECCS Suction Strainers Calculations.Attachment 1 Includes Duke Engineering & Svcs Summary Rept on Hydrodynamic Testing)