ML20214A172

From kanterella
Jump to navigation Jump to search
Provides TMI-2 Cleanup Project Directorate Weekly Status Rept for 861110-16
ML20214A172
Person / Time
Site: Crane 
Issue date: 11/17/1986
From: Travers W
Office of Nuclear Reactor Regulation
To: Harold Denton, Miraglia F
Office of Nuclear Reactor Regulation
References
CON-NRC-TMI-86-108 NUDOCS 8611190277
Download: ML20214A172 (3)


Text

-_

{O '

g s

C:,

1 F I 3

November 17, 1986

}?

-NRC/TllI-86-108 i

8

, _ NEHORANDUit FOR:

Harold P,. Denton, Director I

\\

M@

)

Office of f;uclear Reactor Regulation k

Frank J. Miraglia, Director y

/{

Division of PWR Licensing-B

'[/

b' FROM:

William D. Travers, Director cl THI-2 Cleanup Project Directorate y

1

SUBJECT:

HRC Tl11-2 CLEAliUP PROJECT DIRECTORATE WEEKLY STATUS

/q REPORT FOR fiOVEMBER 10 - 16, 1986 1

o,

)

n ;r

lc. L 1.

DEFUELIf1G

,y h

Drilling of the hard crust at the top of the remaining core material y'

was completed on November 14, 1986. A total of 425 itoles were Li drilled.

After completion of drilling the drill rig was removed and the I

t x c

shielded work platfom was reconfigured to support fuel renoval

.y activities.

l f

2.

EHVIRONMEllTAL MONITORING l

nl~

US Environnental Protection Agency (EPA) sample analysis results k

show that Tl!I site liquid effluents are in accordance with

"~

regulatory limits, NRC requirements, and The City of Lancaster Agreement.

The Lancaster water sample taken at the water works river intake and l(

analyzed by EPA consisted of a seven day composite saaple taken

'c sL October 26 - November 1,1986. A gacca scan detected no reactor a

P-related activity.

Till water scap)les taken by EPA at the plant discharge (includes p

+

3@;G Units I and 2 to the river consisted of seven daily coaposite samples taken frou October 25 - November 1,1966. A ganna scan

,1 detected no reactor related activity.

H//c The EPA analyses of the NRC outdoor air sanple for the period l

Hovcuber 6 '- 13, 1986 showed that concentrations of Cs-137 and I-131 were below the lower limit of quantitative detection (LLD) for the 2@

system. The LLD varies around a value'of IE-13 uC1/cc.

AN 8611190277 861117 o

li PDR ADOCK 05000320 y'*

Q PDR g-omce >

c D[h SunesAmesk m

ur. >

NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY

liarold R. D;nton 2

Havenber 17, 1986 Frank J. tiiraglia

[

URC/TMI-86-108 3.

AUXILIARY AtiD FUEL HAf DLIHG BUILDIl!G ACTIVITIES Decontanination of the seal injection cubicles continues.

Reclanation of Defueling 1.ater Cleanup Systea (DUCS) filters continues.

Fuel handling building ventilation systen nodifications are in progress.

Pre-operational tests of the DWCS and Sedicent Trensfer systens are in progress.

Fuel canister preparation for shipment is in progress.

Preparations and initial data collection are in progress for a gross flush of the reactor building basenent.

4.

URC EVALUATIONS IN PROGPESS Technical Specificativa Chance Request nunbc.s 49, 51, 52, and 54.

Recovery Operutions Plm Change nuabers 31 and 33.

Solid Haste Facility TxSnical Evaluation P.eport.

licavy Load Safety Evalvetion Report, Revision 3.

Disposal of Processed Huter Report.

Safety Evaluation Report for Use of Plasna Arc Cutting Torch.

5.

I;EETINGS_

On Hovember l'. 1966, Dr. Travers and John Thomas of the THICPD gave two 1 hcur p escntations on the status of the THI C1canup. The briefings were conducted at URC headqucrters in Bethesda, MD and were open to any interested nanbers of the t!RC staff.

The next neeting of the Advisory Panel is tentatively scheduled for December 10, 1986. Exact tino and location of the meeting will be announced in the future.

Persons desiring to speak before the Advisory Panel ere requestcd to c antact fir. Theaas Smithgall at 717-291-1042, or write him at 2122 Marietta Avenue, Lanccster, PA 17603.

omoew, siGNID #fs wmkn D. Inuvers Hillian D. Travers Director THI-2 Cleanup Project Directorate

't

~

l omCE)

Sa" >

DATE)

...i....

enc ronu ais oa soi nacu o2' OFFICIAL RECORD COPY l

o liarold R. Denton 3

!!cvenber 17, 1986 Frank J.111raglic

.RC/TllI-SG-1Da INTERGL DISTRIBUTI0fl fD!Tf.iTL71LE HRC PDR LOCAL PDR EDD OGC EPA DOE RI Regional Adainistrator RI Division Directors Public Affairs, RI State Liaison, RI Tiil llQ r/f Ti!I SITE r/f Tl!I-2 Project Section File Till-1 Resident Office (5)

Till Cle6nup Project Directorate (14) 4 D

A o

omca) TMIGPD

[TMICPD,(f[,,gCg 3TMI PD,,,,

SURNAMEk dII,lpi. nils;jeS..CC9V9i3 3.

Tech Support.W r.....

c^"> ntn tes.....11t ate 6..

.11th le6.....11tl]I66 I uc.c conu aia tiosoi uncu o2' OFFICIAL RECORD COPY