. . __. . - . ... -

r <+ ' GL8910 ,

h naeron smoon  ;

Pugern Nuclear Powet Staten Rocky Hdi Road Plytnoute. Massachusetts b2360 December 11,1997 Howy v. oheim BECo Ltr. #2.97.129 oentf at Manager . Techrdcol section U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 Licente No. DPR 35 SUPPLEMENTARY INFORMATION RELATED TO CLOSURE OF GENERIC LETTER 8910

References:

1. NRC Generic Letter 8910," Safety Related Motor-Operated Valve (MOV)

Testing and Surveillance," dated June 28,1989,

2. BECo Letter No.97-055, " Notification of Closure of Generic Letter 89-10,"

dated May 19,1997.

This letter provides supplementary information related to clos"re of Generic Letter 89-10 (Ref.1). In addition, it addresses issues raisej during NRC Inspection 9711 concerning .

motor-operated valve (MOV) follow up and close-out activities. l In response to GL 89-10, our closure letter (Ref. 2) indicated that flow testing and industry j '

data were utilized to ensure that MOVs covered by the program will provide the appropriate /

response under design basis conditions. Discussions with the NRC during the MOV close- , D I

out inspection confirm the EPRI MOV Performance Predictien' Methodology (PPM) could provide bounding estimates of thrust requirements for MOVs that could not be acceptably tested (i.e., non testable MOVs) at design basis conditions. This reinforces our planned initiative to implement the EPRI PPM, which can strengthen our current justification for non- /

testable MOVs consistent with the intent of GL 89-10. Accordingly, we will complete this [ D(2 effort by June 30,1998.

Shouid you have any questions regarding the above subject matter, pleas contact Walter Lobo at (617) 830-7940, 9712190103 97121'1 ' ' '

PDR ADOCK 05000293-P PDR ' H.V.Oheim

- wovgieuoAd

, . c'c: Mr. Alan B. W;ng, Project M: nager Division of Reactor Projects,13

, Office of Nuclear Reactor Regulation

, MaiJ Stop: OWF 14B2 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockvilin, MD 20852 U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station

.-