Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197H552 + (Proposed Tech Specs Revising Testing Methodology Used by Vcns to Determine Operability of Charcoal Adsorber in ESF Air Handling Units)
- ML20141K248 + (Proposed Tech Specs Revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Emergency Safeguards Features Air Handling Units)
- ML17229A925 + (Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1)
- ML20151C389 + (Proposed Tech Specs Revising Titles Listed in Index Section of Tech Specs to Be Consistent W/Titles in Text Re Administrative Changes)
- ML20238C173 + (Proposed Tech Specs Revising Trip Setpoint for Refueling Floor Radiation Monitors & Authorization Level for Approving Changes to Plant Operating Procedures Under Tech Spec Section 6.2)
- ML20153C512 + (Proposed Tech Specs Revising Type of Fire Detection Instruments Required for Diesel Generator Bldg Specified in Tech Specs Table 3.3.5.7-1)
- ML20210B624 + (Proposed Tech Specs Revising Typos & Clarifying Appropriate Process to Be Used for Review & Approval of Temporary Changes to Procedures.Certificate of Svc Encl)
- ML20141G829 + (Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program)
- B14653, Proposed Tech Specs Revising Unit 3 TS Re Pressurizer Safety Valves & Main Steam Safety Valves Lift Setting Tolerance Change + (Proposed Tech Specs Revising Unit 3 TS Re Pressurizer Safety Valves & Main Steam Safety Valves Lift Setting Tolerance Change)
- ML17229A549 + (Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion)
- ML20209G167 + (Proposed Tech Specs Revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values)
- ML20127M020 + (Proposed Tech Specs Revising Value of Soluble Boron Concentration in Refueling Canal,Rwst & SI Accumulators as Described in STP UFSAR & TSs)
- ML20091C614 + (Proposed Tech Specs Revising Various Administrative Controls to Reflect Changes in Offsite Organization Chart (Figure 6.2.1-1))
- ML20126E528 + (Proposed Tech Specs Revising Various Instrumentation SR Requirements)
- ML20155E323 + (Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1)
- ML20067B711 + (Proposed Tech Specs Revising Wording for Page 3 of License DPR-35,clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion)
- ML20141F374 + (Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7)
- ML20101S804 + (Proposed Tech Specs Revising Wording of Reactor Coolant Sys Volume in Design Features Section & Eliminating Ref to Exact Volume in Bases Section)
- ML20196J407 + (Proposed Tech Specs Revising Wording of Action Statement 5a to TS Table 3.3-1, Reactor Trip Sys Instrumentation)
- ML20148P717 + (Proposed Tech Specs Revising Wording to Support Installation of Tube Sleeves as Alternative to Plugging to Repair Defective SG Tubes)
- ML20128G361 + (Proposed Tech Specs Revising once-through Steam Generator Tech Specs by Incorporating once-through Requirements of Proposed Amend 63,Rev 2)
- ML20246D380 + (Proposed Tech Specs Revising post-accident Monitoring & Combustible Gas Control in Hydrogen Analyzers)
- ML20215K241 + (Proposed Tech Specs Revising pressure-temp Limits & Max heat-up & cool-down Rates for RCS)
- ML20079G531 + (Proposed Tech Specs Revising pressure-temp Limits & Max Heatup Rate for RCS)
- ML20106D124 + (Proposed Tech Specs Revising safety-related Shock Suppressors)
- ML16134A665 + (Proposed Tech Specs Revision for Cycle 6)
- ML20128D150 + (Proposed Tech Specs Revision of Sections 3.1 & 3.2 Re RWCU Instrumentation)
- ML17329A486 + (Proposed Tech Specs Revision to 3/4.7.8 & 3/4.7.7 for Units 1 & 2,respectively & Associated Bases to Be Consistent W/ Guidance Provided in Generic Ltr 84-13 & 90-09)
- ML18025B548 + (Proposed Tech Specs Revisions 4.2.A,3.7.A & 3.7.D)
- ML19326C408 + (Proposed Tech Specs Revisions Re Power/Flow/Imbalance Setpoint Envelope)
- ML20037B075 + (Proposed Tech Specs Revisions,Permitting Substitution of Improved Radiogases Monitoring Method,Average & Max Emission Rate Clarification & Establishing Release Limits & Monitoring Methods for Other Airborne Radioactive Matls)
- ML18033A259 + (Proposed Tech Specs Revs Clarifying Limiting Conditions for Operation for RHR Svc Water & Emergency Equipment Cooling Water)
- ML20148S267 + (Proposed Tech Specs Revs to Industry/Tstf Standard Tech Specs Change Traveler Including TSTF-30,rev 2,TSTF-71, Rev 1,TSTF-79,rev 1,TSTF-80,rev 1,TSTF-82,rev 1,TSTF-85, Rev 1,TSTF-91,rev 1,TSTF-93,rev 2 & TSTF-94,rev 1)
- B13591, Proposed Tech Specs Revs to Supplementary Leak Collection & Release Sys + (Proposed Tech Specs Revs to Supplementary Leak Collection & Release Sys)
- B14696, Proposed Tech Specs Rewriting Action Statements for LCO + (Proposed Tech Specs Rewriting Action Statements for LCO)
- ML20134J699 + (Proposed Tech Specs SR 3.1.5.4, CEA Alignment)
- ML20035H561 + (Proposed Tech Specs SR 3.1.7.7 Re SLC Sys)
- ML20210P597 + (Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25)
- ML20154C827 + (Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required)
- ML20237E419 + (Proposed Tech Specs SR 3.8.1.17,revising Acceptance Criteria for Meeting ready-to-load Requirement for Division 3 DG)
- ML20202E593 + (Proposed Tech Specs SR 3.8.1.7 Re Rev to DG Surveillance Requirement)
- ML17292B488 + (Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125)
- ML17284A718 + (Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1)
- ML20216F379 + (Proposed Tech Specs SR 3/4.5.2b.1 Adding Clarification in Regard to Venting ECCS Pump Casings & Accessible Discharge Piping High Points)
- ML18010B117 + (Proposed Tech Specs SR 4.1.1.1.1 Re Determination of Shutdown Margin)
- ML20091L307 + (Proposed Tech Specs SR 4.2.5.2,reflecting Deletion of Requirement to Calibr RCS Flowrate Measurement Instrumentation within 7 Days Prior to Performance of Flow Measurement)
- ML20205A320 + (Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used)
- ML20217C488 + (Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG)
- ML20036B981 + (Proposed Tech Specs SR 4.6.1.2,citing 10CFR50,App J,Which Incorporates Total Time Method & Mass Point Method for Calculating Containment Integrated Leakage Rates)
- ML20101K013 + (Proposed Tech Specs SR 4.6.1.2,reflecting Exception to Min 24 Month Interval Between Type a Tests Specified in Section 9.2.3 of NEI 94-01,using Nominal 18 Month Interval Instead, to Correspond W/Plants Refueling Interval)
- ML20036B288 + (Proposed Tech Specs SR 4.6.1.2.a Re Type a Containment ILRTs)