{{#Wiki_filter:. i Docket No. 50-336 l B14696 l~ l, t i Attachment I Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Electrical Power Systems Marked-up Pages I u 1 \\ l 3 l l December 1993 9312300054 931217 !? PDR ADOCK 05000336 P PDR y ~
1 December 8,1978 f l - ( 3/4.8 ELECTRICAL POWER SYSTEV.5 i 3/4.8.1 A.C. SOURCES l OPERATING LIMITING CONDITION FOR OPERATION i 3.8.1.1 As a rninimum, the following A.C. electrical power sources steil be OPERABLE-a. Two physically independer.1 circuits betweer. the offsite trar4-mission network and the switchyard, and l b. Two separate and independent diesel generators each with a separate fuel oil supply tank contair.ing a minimut of 12,000 gallons of fuel. i APPLICABILITY: MODES,1, 2, 3 and 4. j ACT10h: I 195EttT (4 j Mi h either an cffsite circuit or diesel generator-of the ato a. requ' ed A.C. electrical po er sources inoperable, demons ate the OPEis B]LITY of the remaining A.C. sources by perfo n5 t Surveillan Requirements 4.8.1.1.1 and 4.8.1.1.2. within one cbj3F hour and at I t once per 8 hours thereafter; tore at least two offsit ircuits and two diesel g tors to l OPERASLE status wit 72 hours or be in C0 D SHUTDOWh wittir. i -{ the next 36 hours. b. With one offsite circuit and diesel generator _ of the above required A.C. electrical p r so ces inoperable, demonstrate the OPERASILITY of the .,aining A.. ources by performing l Surveillance Requir nts 4.8.1.1.1 an Q.1.1.2.a.2withir, chl3f one hour and atJesist once per 8 hours there fter; restore at least oneprthe inoperable sources to OPE LE status within 12gurs or be in COLD SHUTDOWN within the xt 36' hours y.flestore at least two offsite circuits and tw iesel. l gegerators to OPERABLE status within 72 hours from the. e of 4titial loss or be in COLD SHUTDOWN within the next 36 hour q f !l i l 1 HILL 5 TONE - UNIT 2 3/46-1 J 1
?s, tegt m e...~. ELECTRICAL POWER SYSTEMS ACTION (Continued)
- c. h qh tw~o of the above required offsite A.C. circuits inoperabl demonsttrate the OPERABILITY of two diesel generators by perfoming Surveillance Requirement 4.8.1.1.2.a.2 withip-one hour and at leas (once per 8 hours thereafter, unless the,Affesel generators are already operating; restore at least one of the' inoperable offsite sources to OPERABt status within 24 hours or M in at least HOT SHUTDOWNwithinth(enex't4 hours. With eff one offsite restored, restore at leaststwo offsiteArcuits to OPERABLE status within 72 hours from time of4 piti oss or be in COLD SHUTDOWN within the next 36 hours.
d. With two of the above re red diesel geperators inoperable, demonstrate the OPER6BI ITY of two offsitb4.C. circuits by perfoming Surveipince Requirement 4.8.1.1.b ithin one hour and at least once per,(hours thereafter; restore at le st one of the be in COL 0' diesel generators to OPERABLE status wit'hin 2 hour inoperable SHUTDOWN within the next 36 hours. Restore X 1 east two, diesel generators to OPERABLE status within 72 hours from time ,of' initial loss or be in COLD SHUTDOWN within the next 36 hoursyN SURVEILLANCE REOUIREMENTS 4.8.1.1.1 Two physically independent circuits between the offsite transmission network'and the switchyard shall be determined OPERABLE at least once per 24 hours by verifying correct breaker alignments and indicated power availability. 4.8.1.1.2 Each diesei generator shall be demonstrated OPERABLE: i At least once per 31 days on a STAGGERED TEST BASIS by: a. 1. Verifying the fuel level in the fuel oil. supply tank, 2. Verifying the diesel starts from ambient condition and l accelerates to 190% of rated speed and to 197% of rated voltage in s 15 seconds. 3. Verifying the generator is synchronized, loaded to 11300 kw in $ 60 seconds, and operates for 1 60 minutes. 4 MILLSTONE - UNIT 2 3/4 8-2 Amendment'No. 167 eore
g e INSERT A Proposed Rewrite of Technical Specification 3.8.1.1 Action Statements a. With one offsite circuit inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter. If either diesel generator has not been successfully tested within the past 24 hours, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.2 separately for each such diesel generator within 24 hours. Restore the offsite circuit to OPERABLE status within 72 hours or be in COLD SHUTDOWN within the following 36 hours. b. With one diesel generator inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or ' testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 24 hours *; restore the diesel generator to OPERABLE status within 72 hours or be in COLD SHUTDOWN within the fellowing 36 hours. c. With one offsite circuit and one diesel generator inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 8 hours *; restore one of the inoperable sources to OPERABLE status within 12 hours or be in COLD SHUTDOWN within the following 36 hours. Restore the other A.C. power source (offsite circuit or diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1.1 Action Statement a or b, as appropriate with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable A.C. power source. A successful tesi. of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for an OPERABLE diesel generator or a restored to OPERABLE diesel generator-satisfies the diesel generator test requirement of Action Statement a or b. d. With two of the required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.2 on both diesel generators within 8 hours, unless the diesel generators are already_ operating; restore one of the inoperable offsite sources to OPERABLE status with 24 hours or be in at least HOT SHUTDOWN within the next 4 hours. Fo11cwing restoration of one offsite source, follow Action Statement a with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable offsite A.C. circuit. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for the OPERABLE diesel generators satisfies the diesel generator test requirement of Action Statement a.
- This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABLE.
With two of the above required diesel generators inoperable, demonstrate e. the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter; restore one of the inoperable diesel generators to OPERABLE. status within 2 hours or be in COLD SHUTDOWN within the following 36 hours. -Following restoration of one diesel generator unit, follow Action Statement b with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable diesel generator. A successful. test of dierel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for a restored to OPERABLE diesel generator satisfies.the diesel generator test requirement of Action Statement b. I but.au
. q: Docket No. 50-336 i B14696 r 'E t P 4 j Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Electrical Power Systems Retyped Pages l i ) Il 1 ) i December 1993
~ ~ l3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LINITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE: a. Two physically independent circuits between the offsite trans-mission network and the switchyard, and b. Two separate and independent diesel generators each with a separate fuel oil supnly tank containing a minimum of 12,000 gallons of fuel. 1 APPLICABILITY: MODES, 1, 2, 3 and 4. ACl10B: a. With one offsite circuit inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter. If either diesel generator has not been successfully tested within the past 24 hrJrs, demonstrate its OPERABILITY by performing 7urveillance Requirement 4.8.1.1.2.a.2 separately for each such t esel generator within 24 hours. Restore the offsite circuit to OPERABLE status within 72 hours or be in COLD SHUTDOWN within the following 36 hours. b. With one diesel generator inoperable, demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1 within 1 hour and at least once per 8 hours thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 24 hours *; restore the diesel generator to OPERABLE status within 72 hours or be in COLD SHUTDOWN within the following 36 hours. L
- This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABLE.
NILLSTONE - UNIT 2 3/4 8-1 Amendment No. 0101
p q o-ELECTRICAL POWER SYSTDiS ACTION (Continued) c. With one offsite circuit and one diesel generator inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter; and if the diesel generator became inoperable due to any cause other than preplanned preventative maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.2 within 8 hours *; restore one of the inoperable sources to OPERABLE status within 12 hours or be in COLD SHUTDOWN within the'following 36 hours. Restore the other A.C. power source (offsite circuit or diesel generator) to OPERABLE status in accordance with the provisions of Section 3.8.1.1 Action Statement a or b, as appropriate with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable A.C. power source. A successful test of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for an OPERABLE diesel generator or a restored to CPERABLE diesel generator satisfies the diesel generator test requirement of Action Statement a or b. d. With two of the required offsite A.C. circuits inoperable, demonstrate the OPERABILITY of two diesel generators by sequentially performing Surveillance Requirement 4.8.1.1.2.a.2 on both diesel generators within 8 hours, unless the diesel generators are already operating; restore one of the inoperable offsite sources to OPERABLE status with 24 hours or be in at least HOT SHUTDOWN within the next 4 hours. Following restoration of one offsite source, follow Actior Statement a with the time requirement of that Action Statement based on the time of initial-loss of the remaining inoperable offsite A.C. circuit. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for the OPERABLE diesel generators satisfies the diesel generator test requirement of Action Statement a. e. With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within I hour and at least once per 8 hours thereafter; restore one of the inoperable diesel generators to OPERABLE status within 2 hours or be in COLD SHUTDOWN within the following 36 hours. Fc;10 wing restoration of one diesel-generator unit, follow Action Statement b with the time requirement of that-Action Statement based on the time of initial loss of the remaining inoperable diesel generator. A successful test of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.2 performed under this Action Statement for a restored to OPERABLE diesel generator satisfies the diesel generator test requirement of Action Statement b. MILLSTONE.- UNIT 2 3/4 8-2 Amendment No. JR -0101 I' j
l ~ SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Two physically independent circuits between the offsite i transmission network and the switchyard shall be determined OPERABLE at least once per 24 hours by verifying correct breaker alignments and indicated power availability, i 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: j a. At least once per 31 days on a STAGGERED TEST BASIS by: t 1. Verifying the fuel level in the fuel oil supply tank, 2. Verifying the diesel starts froin ambient condition and accelerates to 2 90% of rated speed and to > 97% of rated voltage in 5 15 seconds. i 3. Verifying the generator is synchronized, loaded to 11300 kw in $ 60 seconds, and operates for > 60 minutes. e t I 1 I MILLSTONE - UNIT 2 3/4 8-2a Amendment No. 0101 L.}}