Text
--
4
{
,g._
\\
li i
Hic f, '
.~
e
.i n.
-i tif' Qqcket No. 50-423 B13591.
- .1, j.. ;
i.s 6
P
- Millstone Nuclear Power Station, Unit No. 3.
a
~ Proposed Revision to Techr ' cal Specifications
' Supplementary Leak Collection and Release: System t !
4-
- {'
3U
- m.Im.
3m
.l' i '
{i
?
- o ip July 1990 N)m
- n,
gig 9007270108 900720
}'3,
,{DR ADOCK 05000423
?
t..
PDC e, w s
s 5
- l. 1 n.
.[wl f
(
.4 M l
7 CONTAINMENT SYSTEMS 3/4.6.6 SECONDARY CONTAINMENT SUPPLEMENTARY LEAK COLLECTION AND RELEASE-SYSTEM LIMITING CONDITION FOR OPERATION 3.6.6.1 Two independent Supplementary Leak Collection and Release Systems shall be OPERABLE.
APPLICABILITY: MODES 1, 2, 3, and 4.
ACTION:
With-one Supplementary Leak Collection and Release System inoperable, restore the inoperable system to OPERABLE status within 7 days or be in ~at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHVTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
i
'SVRVEILLANCE RE0VIREMENTS u
4'.6.6.l' Each Supplementary Leak Collection and. Release System shall be demon-strated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS by initiating, from-the control room, flow through the HEPA filters and charcoal adsorbers and verifying a system flow rate of 7600 cfm to 9800 cfm and that the system operates for at least 10 continuous bours with the heaters operating; b.
At least once per 18~ months or (1) after any structur;l mr.tntenance on the HEPA' filter or charcoal. adsorber housings, sr (2) following painting, fire, or chemical. release in any antilation zone communi-t cating with the system by:
1)
Verifying that the system satisfies the in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% and uses-the test procedure guidance in Regulatory Posi-tions C.5.a C.5.c, and C.S.d of Regulatory Guide 1.52, Revi-sion 2, March 1978,* and the system flow rate is 7600 cfm to 9800 cfm; 2)
Verifying, within 31 days after removal, that a laboratory 1
analysis of a representative carbon sample obtained in accord-ance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,* meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revi-sion 2, March 1978,* for a methyl iodide penetration of less than 0.175%; and 3)
Verifying a system flow rate of 7600 cfm to 9800 cfm during system operation when tested in accordance with ANSI N510-1980.
MILLSTONE - UNIT 3 3/4 6-38 Amendment No. 2 i
z
,4 iy y _
-'r' CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS (Continued) c.
~ After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal'adsorbe'r operation, by verifying, within 31 days after removal that a-laboratory analysis.of a repre-
. sentative carbon-sample obtained in accordance with Regulatory -
Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978,*
meets the laboratory testing criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978,* for a methyl-iodide penetration of less than 0.175%;-
d.
At least once per 18 months by:
1)
Verifying that the pressure drop across the combined HEPA f',1ters and charcoal adsorber banks is less than 6.25_ inches Water. Gauge while operating th. system at a flow rate of 7600 ::fm to 9800 cfm, 2)
Verifying that the system starts on a Safety' Injection test-
- signal, 3)
Verifying that each system produces a negative pressure of greater than or equal to 0.25 inch Water Gauge in the_ annulus within 50 seconds after a start signal, and 4)
Verifying that the heaters dissipate 50 5 kW when tested in accordance with ANSI N510-1980.
- e.
After e6ch complete or partial replacement of a HEPA filter bank, by l verifying that the cleanup system satisfies the in-place penetration -
and bypass leakage-testing acceptance criteria of less than 0.05%.in-accordance with-ANSI N510-1980-for a DOP test aerosol-while operating the system at a-flow rate of 7600 cfm to 9800 cfm; and.
f.
After ecch complete or partial replacement of a charcoal adsorber bank, by verifying that the cleanup system satisfies the' in-place penetration and bypass leakage testing acceptance criteria of less than 0.05% in accordance with ANSI N510-1980 for a halogenated-hydro' carbon refrigerant test gas while cperating the system at a flow rate of 7600 cfm to 9800 cfm.
w P
p q-P
- ANSI-N510-1980 shall be used in place of ANSI N510-1975 referenced in Regulatory Guide 1.52, Revision 2, March 1978.
p i
MILLSTONE - UNIT 3 3/4 6-39 Amendment No. E m