Letter Sequence Other |
---|
|
|
MONTHYEARML20210C6331987-04-29029 April 1987 Forwards Application for Amend to License NPF-1,consisting of License Change Application 156,revising Tech Specs to Correct Typos & Clarify Appropriate Process Used for Review & Approval of Changes to Procedures.Fee Paid Project stage: Request ML20210B6241987-04-29029 April 1987 Proposed Tech Specs Revising Typos & Clarifying Appropriate Process to Be Used for Review & Approval of Temporary Changes to Procedures.Certificate of Svc Encl Project stage: Other ML20210B5801987-04-29029 April 1987 Application for Amend to License NPF-1,consisting of License Change Application 156,revising Tech Specs to Correct Typos & to Clarify Appropriate Process Used for Review & Approval of Temporary Changes to Procedures Project stage: Request ML20235V5961987-10-0202 October 1987 Forwards Amend 135 to License NPF-1 & Safety Evaluation. Amend Revises Tech Spec Section 6 Re Administrative Controls Concerning Review & Approval of Temporary Changes to Procedures & Corrects Typos Project stage: Approval 1987-10-02
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20204B7691999-03-18018 March 1999 Proposed Tech Specs 5.6 Re High Radiation Area.Certificate of Svc,Encl ML20207J0831999-02-11011 February 1999 Proposed Tech Specs for Trojan Isfsi,Stating Length of Time Air Pads Can Be Installed & Inflated ML20151X8671998-09-10010 September 1998 Rev 2 to Proposed TS Bases,Changing Name of Cooling Sys to Modular Spent Fuel Pool Cooling & Cleanup Sys & Updates Spent Fuel Pool Heat Up Info to 3 1/2 Years After Plant Shutdown ML20238E8291998-08-27027 August 1998 Proposed Tech Specs,Deleting Number of License Conditions & TS Requirements as Prerequisite to Implementing Requested Amend to Transfer Nuclear Sf from Existing 10CFR50 Licensed Area to Proposed 10CFR72,ISFSI Area ML20199J5801998-01-29029 January 1998 Proposed Tech Specs Pages,Deleting Security Plan Requirements of 10CFR50.54(p) & Part 73 for Trojan Plant After Spent Nuclear Fuel Is Moved to Proposed ISFSI Area ML20134C9901997-01-28028 January 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134A9571997-01-16016 January 1997 Proposed Tech Specs LCO 3.1.4 Re Spent Fuel Pool Load Restrictions ML20134B5881997-01-16016 January 1997 Proposed Tech Specs Deleting Paragraph 2.(C)(7) to Allow Loading & Handling of Spent Fuel Casks & Insertion of New License Condition Authorizing Loading of Spent Fuel & Other Matls in Fuel Building ML20134B8631997-01-16016 January 1997 Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building ML20135B5071996-11-27027 November 1996 Proposed Tech Specs Reflecting New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan ISFSI ML20129E7341996-10-23023 October 1996 Proposed Tech Specs Re Spent Fuel Pool Debris Processing ML20059A5601993-10-21021 October 1993 Proposed Tech Specs Modifying Security License Conditions for Clarity ML20127P2121993-01-27027 January 1993 Proposed TS 6.2.2.f Re Composition of Fire Brigade & TS Table 6.2-1 Re Min Shift Crew Composition for Shift Manager & Noncertified Operator ML20127M6391992-11-16016 November 1992 Proposed Tech Specs for Deferral of Unscheduled Steam Generator ISI ML20141M1901992-03-27027 March 1992 Proposed Tech Specs Re Surveillance Requirements for Lco. Response to Request for Addl Info on Subj Encl ML20059L6701990-09-21021 September 1990 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20247C8941989-07-19019 July 1989 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20245C8091989-06-12012 June 1989 Proposed Tech Specs,Changing Orifice Size of Steam Line Safety Valves Shown in Tech Spec Table 4.7-1, Steam Line Safety Valves Per Loop ML20235L9441989-02-10010 February 1989 Proposed Tech Specs,Allowing Mods to Control Auxiliary Fuel Bldg Complex Resulting in Increase in Lateral Shear Forces on Any Story ML20235Q9191989-02-10010 February 1989 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Containment Integrity for Equipment Hatches ML20154D1781988-09-0909 September 1988 Proposed Tech Specs Revising Pressurizer LPSI Setpoint ML20151T5951988-08-12012 August 1988 Proposed Tech Specs,Revising Surveillance Requirements for ECCS Check Valves ML20151A0381988-07-0808 July 1988 Proposed Tech Specs Re Radioactive Gaseous Effluents & Radioactive Liquid Waste Sampling & Analysis Program ML20151U7171988-04-14014 April 1988 Revised Proposed Tech Specs Re Plant Sys,As Part of Rev 1 to License Change Application 142 ML20148K5971988-03-23023 March 1988 Proposed Revised Tech Specs Re RCS ML20148C2101988-03-18018 March 1988 Proposed Tech Specs,Reflecting Revised Offsite & Facility Organization Charts ML20196J9031988-03-0101 March 1988 Proposed Tech Specs Modifying OL NPF-1,removing 3.5% U-235 Limit on Reactor Fuel Assemblies & Increase Enrichment Limit for New Fuel Storage Racks to 4.5%.Certificate of Svc Encl ML20147E7371988-03-0101 March 1988 Proposed Tech Specs Re Containment Isolation Valves ML20149K1901988-02-17017 February 1988 Proposed Tech Specs,Adding New Instruments for Monitoring Steam Generator Blowdown Sys Liquid Effluent Radioactivity ML20149L6981988-02-15015 February 1988 Proposed Tech Specs Re Offsite & Facility Organization Charts.Util Certificate of Svc Encl ML20149H1121988-02-0404 February 1988 Proposed Tech Specs Revising Operability & Surveillance Requirements for Component Cooling Water Sys ML20147D4561988-01-15015 January 1988 Proposed Tech Specs,Revising Offsite & Facility Organization Charts ML20195H8971987-12-24024 December 1987 Proposed Tech Specs Deleting Sections Re Fire Protection ML20237D6971987-12-18018 December 1987 Proposed Tech Specs,Requiring Measurement of Initial Discriminator Bias Curve for Each Detector & Subsequent Discrimination Bias Curves Obtained,Evaluated & Compared to Initial Curves ML20237D6551987-12-16016 December 1987 Proposed Tech Specs Deleting Provision for Continued Plant Operation in Section 3/4.4.6.2 & Requiring Prompt Unit Placement in Cold Shutdown After Pressure Boundary Leakage Occurrence ML20236W7611987-11-20020 November 1987 Proposed Tech Specs Including Effects of Nuclear Fuel Design Changes ML20236Q2271987-11-16016 November 1987 Proposed Tech Specs,Resolving Control Room Habitability Issues ML20236P4391987-11-13013 November 1987 Proposed Tech Specs,Extending Surveillance Time Period for Verifying Control Rod Insertability During Control Rod Worth & Shutdown Margin Tests to 7 Days.Certificate of Svc Encl ML20236N3861987-11-0909 November 1987 Proposed Tech Spec,Revising Tech Spec 3.9.9 to Resolve Inconsistencies within Tech Specs.W/Certificate of Svc ML20236N5881987-08-0606 August 1987 Proposed Tech Spec Section, Bases Correcting Section for Agreement W/Definition of Pressure Boundary Leakage ML20235W5571987-07-14014 July 1987 Proposed Tech Specs Re Solid Radwaste Sys ML20215K8381987-06-22022 June 1987 Proposed Tech Spec Table 3.3-1,revising Operability Requirements for Reactor Trip Breakers & 4.3-1,revising Surveillance Requirements for Manual Reactor Trip,Reactor Trip Breakers & Bypass Breakers ML20210B6241987-04-29029 April 1987 Proposed Tech Specs Revising Typos & Clarifying Appropriate Process to Be Used for Review & Approval of Temporary Changes to Procedures.Certificate of Svc Encl ML20209D0251987-04-20020 April 1987 Proposed Tech Specs Re RCS Surveillance Requirements ML20206D9261987-04-0303 April 1987 Revised Tech Spec Pages 3/4 8-6 & 3/4 8-7 Re Onsite Power Distribution Sys,Per License Change Application 128 ML20206A6221987-04-0303 April 1987 Revised Tech Spec Page 7,clarifying License Change Application 124 Re power-operated Valves ML20245A2631987-02-26026 February 1987 Proposed Tech Specs,Consisting of Revised Pages for License Change Application 124 & License Change Application 135, Adding Steamline Isolation Valves & Valve CV-8825 Back Onto Table 3.6-1 & Excluding Containment Airlocks from Criteria ML20211P0031987-02-20020 February 1987 Proposed Tech Specs Re Steam Generator Tube Plugging Criteria in Tube Sheet Region ML20211H4021987-02-11011 February 1987 Proposed Tech Specs Increasing Setpoint Tolerance for Pressurizer & Main Steam Safety Valves from 1% to 2% ML20207Q5371987-01-20020 January 1987 Proposed Tech Specs,Revising Surveillance Requirements for Safety Injection Sys Accumulator Isolation Valves 1999-03-18
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20210M7291999-08-0505 August 1999 Replacement Pages to PGE-1078, Trojan Nuclear Plant License Termination Plan. with D&D Modeling Runs for Determination of Screening Dcgls & Survey Area Maps Indicating Preliminary Survey Units ML20207D3951999-06-0101 June 1999 Rev 1 to Trojan Nuclear Plant Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20204B7691999-03-18018 March 1999 Proposed Tech Specs 5.6 Re High Radiation Area.Certificate of Svc,Encl ML20207J3911999-03-10010 March 1999 Trojan Nuclear Plant License Termination Plan ML20207J0831999-02-11011 February 1999 Proposed Tech Specs for Trojan Isfsi,Stating Length of Time Air Pads Can Be Installed & Inflated ML20153D3081998-09-21021 September 1998 Rev 0 to PGE-1077, Tnp Reactor Vessel & Internals Removal Project Transportation Safety Plan ML20151X8671998-09-10010 September 1998 Rev 2 to Proposed TS Bases,Changing Name of Cooling Sys to Modular Spent Fuel Pool Cooling & Cleanup Sys & Updates Spent Fuel Pool Heat Up Info to 3 1/2 Years After Plant Shutdown ML20238E8291998-08-27027 August 1998 Proposed Tech Specs,Deleting Number of License Conditions & TS Requirements as Prerequisite to Implementing Requested Amend to Transfer Nuclear Sf from Existing 10CFR50 Licensed Area to Proposed 10CFR72,ISFSI Area ML20199J5801998-01-29029 January 1998 Proposed Tech Specs Pages,Deleting Security Plan Requirements of 10CFR50.54(p) & Part 73 for Trojan Plant After Spent Nuclear Fuel Is Moved to Proposed ISFSI Area ML20196J5131997-07-29029 July 1997 Rev 0 to Trojan Second Integrated Test Rept,Filter Media Processing Sys Trojan Nuclear Plant Spent Fuel Pool Debris Project ML20196J5241997-07-29029 July 1997 Rev 2 to In-Canal Equipment,Filter Media Processing Sys, Trojan Nuclear Plant Spent Fuel Pool Debris Project ML20137T9361997-04-0808 April 1997 Rev 1 to Trojan Proof of Principle Test Summary ML20137G1731997-03-20020 March 1997 Rev 6 to Trojan Plant Procedure,Tpp 20-2, Radiation Protection Program ML20137K5151997-03-0404 March 1997 Rev 0 to Trojan Proof of Principle Test Summary ML20138L1901997-01-30030 January 1997 Reactor Vessel & Internals Removal Plan ML20134C9901997-01-28028 January 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134B8631997-01-16016 January 1997 Proposed Tech Specs Re Delete Paragraph 2.(C)(7) to Allow pre-operational Testing & Load Handling of Spent Fuel Transfer & Storage Casks in Trojan Fuel Building ML20134B5881997-01-16016 January 1997 Proposed Tech Specs Deleting Paragraph 2.(C)(7) to Allow Loading & Handling of Spent Fuel Casks & Insertion of New License Condition Authorizing Loading of Spent Fuel & Other Matls in Fuel Building ML20134A9571997-01-16016 January 1997 Proposed Tech Specs LCO 3.1.4 Re Spent Fuel Pool Load Restrictions ML20135B5071996-11-27027 November 1996 Proposed Tech Specs Reflecting New Fuel Debris Storage Container Design & Storage of non-fuel Bearing Components & Fuel Rod Storage Container in Trojan ISFSI ML20129E7341996-10-23023 October 1996 Proposed Tech Specs Re Spent Fuel Pool Debris Processing ML20059L1721993-11-30030 November 1993 Final Update to PGE-1043,Amend 3, Accident Monitoring Instrumentation Review, Identifying Rept as Historical by Placing Explanation in Preface to Be Inserted at Front of Document ML20059A5601993-10-21021 October 1993 Proposed Tech Specs Modifying Security License Conditions for Clarity ML20057D9131993-09-30030 September 1993 Amend 14 to PGE-1012, Trojan Nuclear Plant Fire Protection Plan. W/Four Oversize Drawings ML20057F1631993-09-30030 September 1993 Updated Trojan Nuclear Div Manual ML20056F9971993-08-26026 August 1993 Rev 9 to Odcm ML20127P2121993-01-27027 January 1993 Proposed TS 6.2.2.f Re Composition of Fire Brigade & TS Table 6.2-1 Re Min Shift Crew Composition for Shift Manager & Noncertified Operator ML20126B7231992-12-0303 December 1992 Rev 13 to Chemistry Manual Procedure CMP 1, Primary-to-Secondary Leak Rate ML20127M6391992-11-16016 November 1992 Proposed Tech Specs for Deferral of Unscheduled Steam Generator ISI ML20126B7601992-09-25025 September 1992 Rev 18 to Emergency Instruction EI-3, SG Tube Rupture ML20126B7451992-09-25025 September 1992 Rev 7 to Event-Specific Emergency Instruction ES-3.1, Post- SG Tube Rupture Cooldown Using Backfill ML20126B7491992-09-25025 September 1992 Rev 7 to Event-Specific Emergency Instruction ES-3.3, Post- SG Tube Rupture Cooldown Using Steam Dump ML20126B7411992-09-25025 September 1992 Rev 8 to Event-Specific Emergency Instruction ES-3.2, Post- Steam Generator Tube Rupture Cooldown Using SG Blowdown ML20126B7331992-09-25025 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.3, SG Tube Rupture W/O Pressurizer Pressure Control ML20126B7061992-09-25025 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.2, SG Tube Rupture W/Loss of Reactor Coolant - Saturated Recovery Desired ML20126B7181992-09-23023 September 1992 Rev 7 to Emergency Contingency Action Procedure ECA-3.1, SG Tube Rupture W/Loss of Reactor Coolant - Subcooled Recovery Desired ML20126B7141992-08-20020 August 1992 Rev 19 to Off-Normal Instruction ONI-12, High Activity Radiation Monitoring ML20210D5281992-06-0808 June 1992 Errata to Amend 6 to PGE-1025, Environ Qualification Program Manual ML20141M1901992-03-27027 March 1992 Proposed Tech Specs Re Surveillance Requirements for Lco. Response to Request for Addl Info on Subj Encl ML20126B7201992-01-24024 January 1992 Rev 2 to Off-Normal Instruction ONI-3-12, SG Tube Leak ML20062F7391990-11-15015 November 1990 Amend 4 to PGE-1049, Trojan Nuclear Plant Inservice Insp Program for Second 10-Yr Interval,Jan 1987 - Dec 1996 ML20059L6701990-09-21021 September 1990 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20247C8941989-07-19019 July 1989 Proposed Tech Spec Table 3.6-1, Containment Isolation Valves ML20245C8091989-06-12012 June 1989 Proposed Tech Specs,Changing Orifice Size of Steam Line Safety Valves Shown in Tech Spec Table 4.7-1, Steam Line Safety Valves Per Loop ML20247E5331989-03-29029 March 1989 Rev 0 to Procedure QTS-VT-100, Visual Exam Procedure ML20248D3271989-03-27027 March 1989 Rev 0 to QAP-VT-108, Visual Exam ML20247E5491989-03-0202 March 1989 Rev 0 to Procedure TNP-QAP-VT108, Visual Exam ML20235Q9191989-02-10010 February 1989 Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Containment Integrity for Equipment Hatches ML20235L9441989-02-10010 February 1989 Proposed Tech Specs,Allowing Mods to Control Auxiliary Fuel Bldg Complex Resulting in Increase in Lateral Shear Forces on Any Story ML20154D1781988-09-0909 September 1988 Proposed Tech Specs Revising Pressurizer LPSI Setpoint 1999-08-05
[Table view] |
Text
.
, ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Plant Review Board shall be composed'of the:
Chcirman: Manager, Technical Services Member: Engineering Supervisor I Member: Maintenance Supervisor Member: Operations Supervisor Member: Quality Assurance Supervisor Member: Radiation Protection Supervisor ALTERNATES
- 6. 5.1. 3 All alternate members shall be appointed in writing by.the PRB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PR8 activities at-any one time.
MEETING FREQUENCY 6.4.1.4 The PRB shall meet at least once per calendar month and as
! convened by the PRB Chairman or his designated alternate.
QUORUM 6.5.1.5 A quorum of the PRB shall consist of the Chairman or his l designated alternate and at least four members including alternates.
RESPONSIBILITIES 6.5.1.6 The Plant Review Board shall be responsible for:
- a. Review of the safety evaluations for: (1) procedures, (2) change-to procedures, equipment, systems or facilities, and (3) tests or-experiments completed under the ~ provision of 10 CFR 50.59 to verify that such actions did not constitute an unreviewed safety question.
- b. Review of proposed procedures and changes to procedures, equipment, systems or facilities which may involve an unreviewed safety question as defined in 10 CFR 50.59 or involves a change ;
in Technical Specifications.
- c. Review of proposed test or experiments which may involve an unreviewed safety question as. defined in 10 CFR 50.59 or requires a change in Technical Specifications.
- d. Review of proposed changes to Technical Specifications or the Operating License.
TROJAN-UNIT 1 6-6 Amendment No. #2, 128 87050500hb9 B70429 PDR ADOCK 05000344 P PDR
ADMINISTRATIVE CONTROLS
- e. Investigation of all violations of the-Technical Specifications including the preparation and forwarding lof reports covering
- evaluation and recommendations to prevent _ recurrence to the
-Vice President Nuclear and to the Chairman of the Trojan Nuclear
-Operations Board. The investigation shall include an assessment.
of the safety significance of_each violation.
- f. Review of all REPORTABLE EVENTS.
d
- g. Review of facility operations to detect potential; safety -
hazards.
- h. Performance of special reviews, investigations or analyses and reports thereon as requested-by the Chairman of the-Trojan-Nuclear Operations Board.
- i. Review of the Plant Security Plan and implementing procedures.
J. Review of the Emergency Plan and implementing procedures.
- k. Review of the Offsite Dose-Calculation Manual.
4
- 1. Review of the Process Control Program for Solid Radioactive Waste.
AUTHORITY 6.5.1.7 The Plant Review Board shall:
- a. Recommend to the General Manager written approval or disapproval of items considered under 6.5.1.6(a) through (c) above.
- b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (c) above constitutes an unreviewed safety question.
- c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice Presi- 1 dent Nuclear and the Trojan Nuclear Operations Board of disagreement l between the PRB and the General Manager; however, the General l Manager shall have responsibility for resolution of such i disagreements pursuant to 6.1.1 above. '
l 1 i 4
a d
i TROJAN-UNIT 1 6-7 Amendment No. #2, 52,-~ 88, 97, 99,128 1
l
.,,*e . - - - , - - - - - = = e ,vwn e.,W -- - - , ==1, w - p -m--
nx = - - -
[l
~
ADMINISTRATIVE CONTROLS 6.7 SAFETY LIMIT-VIOLATION 6.7.1 The following actions shall-be taken in the event a_. Safety Limit -t is violated:
- a. The facility shall be placed.in at least HOT STANDBY within one hour.
- b. The Safety Limit. violation ~shall be reported to the Commission,
.the Vice President Nuclear and to the TNOB within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- c. -A Safety Limit Violation Report shal1 be prepared. The repcrt.shall be reviewed by the PR8. This report shall describe (1) applicable circumstances preceding the viola-tion, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to .
prevent recurrence. l
- d. The Safety Limit Violation Report shall be submitted to.the Commission, the TNOB and the Vice President Nuclear within 14 days of the. violation.
6.8 PROCEDURES AND-PROGRAMS 6.8.1 Written procedures shall be established, implemented and main-tained covering the activities referenced below:
- a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November,1972.
- b. Refueling operations.
- c. Surveillance and test activities of safety related equipment.
- d. Security Plan implementation.
- e. Radiological Emergency Plan implementation.
- f. Fire Protection Program implementation.
- g. Offsite Dose Calculation Manual implementation.
- h. Radiological effluent monitoring..
6.8.2 Each procedure and administrative policy of 6.8.1 above, and !
changes thereto, shall be reviewed and approved prior to implementation
~
as set forth in Specification 6.5.3.
TROJAN-UNIT 1 6-13 Amendment No. #2, 52, 97, if, 188, 728
ADMINISTRATIVE CONTROLS l
6.8.3 Temporary changes to procedures of.6.8.1 may be made provided:
- a. The intent of the original procedure is not altered.
- b. For procedures covering activities performed by the Facility Staff, the change is approved by two members of the Plant Management Staff, at least one of whom holds a Senior Reactor Operator's License on Trojan, and the change is documented, reviewed, and approved by the Responsible Manager within fourteen (14) days of implementation.
- c. For procedures covering activities performed by Company organizations other than the Facility Staf f, the change is reviewed and approved in accordance with the Nuclear Quality Assurance Program.
6.8.4 The following programs shall be established, implemented, and maintained:
- a. Primary Coolant Sources Outside Containment l A program to reduce leakage from systems outside Containment that l would or could contain highly radioactive fluids during a serious transient or accident to as low as practical levels. This program shall include the following: l (i) Provisions establishing preventive maintenance and periodic ,
visual inspection requirements, and
{
(ii) Leak test surveillance requirements for each system at refueling cycle intervals (18 months).
- b. In-Plant Radiation Monitoring A program which will ensure the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions. This program shall include the following:
(i) Training of personnel, (ii) Procedures for monitoring, and (iii) Provisions for maintenance of sampling and analysis equipment. '
- c. Secondary Water Chemistry A secondary water chemistry monitoring program to inhibit steam generator tube degradation. This program shall include:
(i) A sample schedule and control points for critical parameters.
(ii) Use of commonly accepted industrial procedures for quantifi-cation of parameters that are critical to control points.
TROJAN-UNIT 1 6-14 Amendment No. 78, 27, #2, 97, 99, 796 128 April 9, 1987
'=.*s'
=,.
ADMINISTRATIVE CONTROLS-the first sample in which the limit was exceeded;-(4) Graph of the I-131 concentration and one other radiciodine isotope concentration in microcuries per gram as a function of time ~ for the duration of the specific activity above the steady-state level; and'(5)-The '
time duration.when the specific ' activity of the primary coolant exceeded the radioiodine limit.
ANNUAL RADIOLOGICAL ENVIRONMENTAL MONITORING REPORT
- 6. 9 .1. 5 .1 Routine Radiological Environmental-Monitoring Reports covering -
the operation of the unit during the previous calendar year shall be submitted prior to May 1 of each year.
6.9.1.5.2 The Annual Radiological Environmental Monitoring' Reports shall include summaries,' interpretations, and statistical evaluation of the' '
results of the radiological environmental surveillance activities for the report period, including a comparison with preoperational studies, operational. controls (as appropriate), and previous environmental surveillance reports and an assessment of the observed impacts of the plant operation on the environment. The reports shall also include the results of the land use censuses required by Specification 3.12.2. .If -
harmful effects of evidence of irreversible damage are detected by the ,
monitoring, the report shall provide an analysis of.the problem and a-planned course of action to alleviate the problem.
The Annual Radiological Environmental Monitoring Reports shall include.
summarized and tabulated results in the format of Table 6.9-1 of all ,
radiological environmental samples taken during the report period. In the event that some results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted as soon.as possible in a supplementary report. i i
The reports shall also include the following: a summary description of !
the Radiological Environmental Monitoring Program including sampling methods for each sample type, size and physical characteristics of each-sample type, sample preparation methods, analytical methods, and measuring equipment used; a map of all sampling locations keyed to a table giving distances and directions from one reactor; the result of land use censuses required by the Specification 3.12.2; and the results of licensee participation in the Interlaboratory Comparisons Program required by Specification 3.12.3.
SEMIANNUAL RADI0 ACTIVE EFFLUENT RELEASE REPORT I
6.9.1.5.3 Routine Radioactive Effluent Release Reports covering the operation of the unit during the previous 6 months of operation'shall be submitted within 60 days after January 1 and July 1 of each year.
l l
TROJAN-UNIT 1 6-15a Amendment No. 99, 778, 128 l l
_ -j
....q W e ,
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l
(
In the Matter of ) I
) l PORTLAND GENERAL ELECTRIC COMPANY, ) Docket 50-344 THE CITY OF EUGENE, OREGON, AND ) Operating License NPF-1 PACIFIC POWER & LIGHT COMPANY )
)
(TROJAN NUCLEAR PLANT) )
CERTIFICATE OF SERVICE I hereby certify that copies of License Change Application 156 to the Operating License for Trojan Nuclear Plant, dated April 29, 1987, have
, been served on the following by hand delivery or by deposit in the United States mail, first class, this 29th day of April 1986:
{
Mr. David Kish, Director l State of Oregon l Department of Energy 625 Marion St NE I Salem OR 97310 I Mr. Michael J. Sykes Chairman of County Commissioners
- Columbia County Courthouse I
St. Helens OR 97051
, u- - _ _
"GI Zimmerman, Manager Nuc ca'r Regulation Branch Nucl a Safety & Regulation l
]
Subscribed and sworn to before me this 29th day of April 1986.