ML20091L307

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs SR 4.2.5.2,reflecting Deletion of Requirement to Calibr RCS Flowrate Measurement Instrumentation within 7 Days Prior to Performance of Flow Measurement
ML20091L307
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/17/1995
From:
DUKE POWER CO.
To:
Shared Package
ML20091L301 List:
References
NUDOCS 9508290124
Download: ML20091L307 (2)


Text

'y 1i y 9

e O

ATTACHMENT 4 i

l PROPOSED TECHNICAL SPECIMCATION AMENDMENTS FOR CATAWBA l

l l

i l ..

9508290124 950817

, PDR ADOCK 05000413 l- .P. PDR

- - - - -- _- - - _ . _ _ _ _ _ _ _ _ _m .m_ ____mm.________ _ _ _ _ _ . _ _ _ _ _ _ _ _ , _ _ _ _ _ __ _ _ _ _ _ __

. =4 .

POWER DISTRIBUTION LIMITS 3/4.2.5 DNS PARAMETERS g LIMITING CONDITION FOR OPERATION

2. Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of initially being within the region of pro-hibited operation specified on Figure 3.2-1, verify that the combination of THERMAL POWER and Reactor Coolant System total flow rate are restcred to within the regions of restricted or permissible operation, or reduce THERMAL POWER to less than 5%

of RATED THERMAL POWER within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.5.1 Each of the parameters of Table 3.2-1 shall be verified to be within their limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.2.5.2 The Reactor Coolant System total flow rate indicators shall be sub-t jected to a CHANNEL CALIBRATION at least once per 18 months. Th; nnarsat ir.;trs:.r.t; tier. ;h;.li b; ;;libr;t;d ithir. 7 daye i,rier te U. prfer ;r.;e ef th: f1;; zuura;r.t. f, 4.2.5.3 The Reactor Coolant S,$;ctem total flow rate shall be determined by measurement at least once per 18 months. fl, I /

l l

L t

1 l

( ) [< ,

l <

l ( ,

I l

. CATAWBA - UNITS 1 & 2 3/4 2-14 Amendment No.1 (Unit 1)

Amendment No.1 (Unit 2) t

- _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -