Attachment 3 to AEP:NRC:1143 Proposed Revised Technical Specification Pages
(
9205050155 920501 PDR ADOCK 05000315 P
k
~ <<ill 4 'tw
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREMENTS SECTION 3 4 PLANT SYSTEMS (Continued) 3/4.7.9 FIRE SUPPRESSION SYSTEMS Fire Suppression Water System.
Spray and/or Sprinkler Systems.
Low Pressure CO Systems..
Halon System Fire Hose Stations.
3/4.7.10 FIRE RATED ASSEMBLIES....,
PAGE 3/4 7-33 3/4 7-36 3/4 7-40 3/4 7-42 3/4 7-43 3/4 7-45 3 4 8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C.
SOURCES Operating.
Shutdown.
3/4 8-1 3/4 8-9 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. Distribution - Operating............
A.C. Distribution - Shutdown.
D.C. Distribution - Operating.
D.C. Distribution - Shutdown.
D.C. Distribution - Operating
- Train N Battery System.
3/4 8.3 ALTERNATIVE A.C.
POWER SOURCES..
3/4 8-10 3/4 8-11 3/4 8-12 3/4 8-16 3/4 8-17 3/4 8-20 3 4.8.9 REFUELING OPERATIONS 3/4.9.1 3/4.9.2 3/4.9.3 3/4.9.4 3/4.9.5 BORON CONCENTRATION..............,
INSTRUMENTATION.
DECAY TIME..
CONTAINMENT BUILDING PENETRATIONS COMMUNICATIONS 3/4 9-1 3/4 9-2 3/4 9-3 3/4 9-4 3/4 9-5 COOK NUCLEAR PLANT - UNIT 1 AMENDMENT NO. 23, 420,
k CX
~a,
~4l
~ ~ $
PLANT SYSTEMS 3 4 7 8
SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.8.1 All safety-related snubbers shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3'and'4.
(MODES 5 and 6 for'snubbers located:on systems required OPERABLE in those MODES).
ACTION With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.8.1.c on the supported component or declare the supported system inoperable and follow the appropriate ACTION statement for that system.
SURVEILLANCE RE UIREMENTS 4.7.8.1 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4.0.5.
a.
Visual Ins ections Snubbers are categorized as inaccessible or accessible during reactor operation.
Each of these categories (inaccessible and accessible) may be inspected independently according to the schedule determined by Table 3.7-4.
The visual inspection interval for each type of snubber shall be determined based upon the criteria provided in Table 3.7-4 and the first inspection interval determined using this criteria shall be based upon the previous inspection interval as established by the requirements in effect before Amendment No.
b.
Visual Ins ection Acce tance Criteria Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) attachments to the foundation or supporting structure are secure, and (3) in those locations where snubber movement can be manually induced without disconnecting the snubber, that the snubber has freedom of movement and is not frozen up
~
Snubbers which appear inoperable as a result of visual inspections shall be classified as unacceptable and may be reclassified as acceptable for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is COOK NUCLEAR PLANT - UNIT 1 3/4 7-28 AMENDMENT NO. 404, 444, ~, 440
C II 4v t,
kj
~I,
+t C>>
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued functionally tested in the as found condition and determined OPERABLE per Specification 4.7.8.1.d.
All snubbers found connected to an inoperable common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval.
A review and evaluation shall be performed and documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, the snubber shall be declared inoperable and the ACTION requirements shall be met.
c ~
Functional Tests At least once per 24 months during shutdown, a representative sample (14%) of the total of each type of snubber in use in the plant shall be functionally tested either in place or in a bench test.
For each snubber that does not meet the functional test acceptance criteria of Specification 4.7.8.1.d an additional 10%
of that type of Snubber shall be functionally tested.
The representative sample selected for functional testing shall include the various configurations, operating environments and the range of size and capacity of snubbers.
At least 25% of the snubbers in the representative sample shall include snubbers from the following three categories:
1.
The first snubber away from each reactor vessel nozzle 2.
Snubbers within 5 feet of heavy equipment (valve,
- pump, turbine, motor, etc.)
3.
Snubbers within 10 feet of the discharge from a safety relief valve Snubbers that are identified as "Especially Difficult to Remove" or in "High Radiation Zones During Shutdown" shall also be included in the representative sample.*
In addition to the regular sample, snubbers which failed the previous functional test shall be retested during the next test period. If a spare snubber has been installed in place of a failed snubber, then both the failed snubber (if it is repaired and installed in another position) and the spare snubber shall be retested.
Test results of these snubbers may not be included for the re-sampling.
""Permanent or other exemptions from functional testing for individual snubbers in these categories may be granted by the Commission only if a justifiable basis for exemption is presented and/or snubber life destructive testing was performed to qualify snubber operability for all design conditions at either the completion of their fabrication or at a subsequent date.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-29 AMENDMENT NO. 404, 444
J t
1,
~
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued If any snubber selected for functional testing either fails to lockup or fails to move, i.e., frozen in place, the cause will be evaluated and if caused by manufacturer or design deficiency all snubbers of the same design subject to the same defect shall be functionally tested.
This testing requirement shall be independent of the requirements stated above the snubbers not meeting the functional test acceptance criteria.
For the snubber(s) 'found inoperable, an engineering evaluation shall be performed on the components which are supported by the snubber(s).
The purpose of this engineering evaluation-shall be to determine if the components
-supported by the snubber(s) were adversely affected by the inoperability of the snubber(s) in order to ensure that the supported component remains capable of meeting the designed service.
d.
H draulic Snubbers Functional Test Acce tance Criteria The hydraulic snubber functional test shall verify that:
l.
Activation (restraining action) is achieved within the specified range of velocity or acceleration in both tension and compression.
2.
Snubber bleed, or release
- rate, where required, is within the specified range in compression or tension.
For snubbers specifically required to not displace under continuous
- load, the ability of the snubber to withstand load without displacement shall be verified.
e.
"Snubbe Service Life Monitorin A record of the service life of each snubber, the date at which the designated service life commences and the installation and maintenance records on which the designated service life is based shall be maintained as required by Specification 6.10.2.
Concurrent with the first inservice visual inspection and at least once per 18 months thereafter, the installation and maintenance records for all safety-related snubbers shall be reviewed to verify that the indicated service life has not been exceeded or will not be exceeded prior to the next scheduled snubber service life review. If the indicated service life will be exceeded prior to the next scheduled snubber service life review, the snubber service life shall be reevaluated or the snubber shall be replaced or reconditioned so as to extend its service life beyond the date of the next scheduled service life review.
This reevaluation, replacement or reconditioning shall be indicated, in the records.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-30 AMENDMENT NO. 404
I I'CI
~I Hl III
<l P
'k V
TABLE 3.7-4 SNUBBER VISUAL INSPECTION INTERVAL NUMBER OF UNACCEPTABLE SNUBBERS Population or Category Notes 1 and 2
Column A Column B
Column C
Extend Interval Repeat Interval Reduce Interval 80 100 150 200 13 300 12 25 400 18 36 500 12 24 48 750 20 40 78 1000 or greater 29 109 Note 1:
The next visual inspection interval for a snubber population or category size shall be determined based upon the previous inspection interval and the number of unacceptable snubbers found during that interval.
Snubbers may be categorized, based upon their accessibility during power operation, as accessible or inaccessible.
These categories may be examined separately or jointly.
- However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category.
Note 2:
Interpolation between population or category sizes and the number of unacceptable snubbers is permissible.
Use next lower integer for the value of the limit for Columns A, B,. or C if that integer includes a
fractional value of unacceptable snubbers as determined by interpolation.
, COOK,NUCLEAR PLANT - UNIT 1 3/4 7-31 AMENDMENT NO.
~t si H
TABLE 3.7-4 (Continued)
Note 3:
If the number of unacceptable snubbers is equal to or less than the number in Column A, the next inspection interval may be twice the previous interval but not greater than 48 months.
Note 4:
If the number of unacceptable snubbers is equal to or less than the number in Column B but greater than the number in Column A, the next inspection interval shall be the same as the previous interval.
Note 5:
If the number of unacceptable snubbers is equal -to or greater than the number in Column C, the next inspection interval shall be two-thirds of the previous interval.
However, if the number of unacceptable snubbers is less than the number in Column C but greater than the number in Column B, the next interval shall be reduced.
proportionally-by -interpolation, that is, the. previous interval shall be reduced by a factor that is one-third of the ratio of the difference between the number of unacceptable snubbers found during the previous interval and the number in Column B to the difference in the numbers in Columns B and C.
Note 6:
The provisions of Specifications 4.0.2 are applicable for all inspection intervals up to and including 48 months.
COOK NUCLEAR PLANT UNIT 1 3/4 7-32 AMENDMENT NO.
I tl" "J
'W
>>1,j Iftl4
)
PLANT SYSTEMS 3 4 7 9 FIRE SUPPRESSION SYSTEMS FIRE SUPPRESS ON W TER SYSTEM LIMITING CONDI ON FOR OPERATION 3.7.9.1 The fire suppression water system shall be OPERABLE with:
a.
Two* high demand 2000 GPM pumps, one of which shall be a diesel driven pump, with their discharge aligned to the fire suppression header.
b.
An OPERABLE open flow path capable of taking suction from Lake Michigan and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves and up to the hose station valve(s) or water suppression system controlling valve(s) required to be OPERABLE per Specifications 3.7.9.5 and 3.7.9.2, respectively.
APPLICABILITY: At all times, ACTION:
a.
With only one pump OPERABLE, restore an inoperable pump (diesel, if required),
and equipment to OPERABLE, status within 7 days or establish a backup fire suppression water system within the next 7
days.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
b.
With the fire suppression water system otherwise inoperable:
Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or 2.
Establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Four High Demand Fire Pumps (two per Unit) are shared between Units 1 and 2.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-33 AMENDMENT NO. M, 430
r.
'V
<<k Hey t
4 P
w A
0 1
PLANT SYSTEMS SURVEILLANCE RE UI EMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.
b.
At least once per 31 days by verifying that each valve (manual, power
- operated, or automatic) in flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
c ~
At least once per 6 months by'performance of a system flush of above ground internal distribution headers and fire hydrants.
d.
At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
e.
At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating
- sequence, and:
1 ~
Verifying that each automatic valve in the flow path actuates to its correct position, 2.
Verifying that each pump develops a flow of at least 2000 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated, and peak) on the pump's performance curve.
3.
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full
- travel, and 4.
Verifying that each high pressure pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than or equal to 100 psig I
At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to'e clear of obstructions by a full flow test.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-34 AMENDMENT NO. M, 430
Il
'lt
'kaC ~
~
0'8 g
g
~a a
s,. 4~~/
l
- ~
PLANT SYSTEMS S
VEILLANCE RE U EHE S
Co ti ued 4.7.9.1.2 The fire pump diesel engine shall be demonstrated OPERABLE:
a 0 At least once per 31 days by verifying:
The fuel storage tank contains at least 160 gallons of fuel, and 2.
The diesel starts from ambient conditions and operates for at least 30 minutes.
b.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
C.
At least once per 18 months by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.
4:7.9.1.3 The'ire pump diesel starting battery bank and charger shall be demonstrated OPERABLE:
At least once per 7 days by verifying that:
1.
The electrolyte level of each battery is above the plates, and 2.
The output battery voltage of each bank is greater than 24 volts.
b.
At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
c ~
At least once per 18 months by verifying that:
The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and 2.
The battery-to'-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-35 AMENDMENT NO. W, 430
J
%1 t,
"pQ f f
o4 yf
- wI
~
4 m
~A~+~
I
~
I 4
l'\\'V
PLANT S S
EMS SPRAY D OR SPRINKLER SYSTEMS LIMITING CO ITION FOR OPERATION 3.7.9.2 The spray and/or sprinkler systems located in the areas shown in Tables 3.7-5A and 3.7-5B shall be OPERABLE:
" '"' " /'
required to be OPERABLE.
ACTION a.
With one or more of the water spray systems as listed in Table 3.7-5A inoperable, within 1 hour:
- 1) verify that the detection system for
, the affected filtration unit is OPERABLE per Specification 4.3.3.7, or 2) establish a continuous fire watch patrol.*
b.
With one or more of the sprinkler systems as listed in Table 3.7-5B inoperable, within 1 hour:
- 1) verify that at least one of the detection systems, where provided (electric per Specification 4.3.3.7 or pneumatic per Table 3.7-5B), for the affected area is OPERABLE and establish an hourly fire watch patrol, or 2) establish a continuous fire watch patrol.*
C.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
- For high radiation areas, periodic monitoring (and hourly logging) of the closed circuit television coverage is an acceptable substitute for a continuous fire watch.
For high radiation areas where closed circuit television coverage does not exist, an hourly fire watch patrol will be instituted.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-36 AMENDMENT NO.
lM
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE:
a
~
At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4.7.9.1.1.d.
b.
At least once per 18 months:
By performing a system functional test which includes simulated automatic actuation of the system, and:
a)
Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and b)
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
2.
By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air) to verify their integrity.
3.
By visual inspection of each open head deluge nozzle to verify that there is no blockage.
At least once per 3 years by performing an air flow test through the piping of each open head-deluge system and verifying each open head deluge nozzle is unobstructed.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-37 AMENDMENT NO. 400, 430,
~ e l~
j >
TABLE 3
-5 OPEN HEAD DELUGE WATER S RAY S STEMS LOCATION 1-HV-AES-1 Charcoal Filters 1-HV-AES-2 Charcoal Filters
.1-HV-ACRF-1 Charcoal Filters 1-HV-CPR-1 Charcoal Filters 12-HV-AFX Charcoal Filters*
1-HV-CIPX Charcoal Filters A~OTUAT ON Manual - Electric - Heat Manual - Electric - Heat Manual - Electric - Heat Manual - Electric - Heat Manual - Electric - Heat Manual - Electric - Heat
- Shared system with Unit 2.
. COOK NUCLEAR'LANT - UNIT 1 3/4 7-38 AMENDMENT NO.
4 C
~El
TABLE 3 7-5 B
CLOSED EAD PRINKLER SYSTEMS LOCAT ON E SYST ACTUATION Auxiliary building El. 587 ft.+/***(Normally accessible
- areas, charging and Safety Injection Pump
- Rooms, stairways to El.
573 and 609)
Preaction Sprinkler Dry Pilot**
Auxiliary building El. 609 ft.*/~ (Normally accessible
- areas, CCW Pump area, stairways to El.
633 and 620 above Chem.
Lab)
Preaction Sprinkler Dry Pilot~
Auxiliary building El. 633 ft.*/***(Normally accessible
- areas, excluding HVAC'Ve'stibule'Areas and stairways to El. 650)
Preaction Sprinkler Dry Pilot~
Auxiliary Feedwater Pump Corridor*/***
Wet Pipe Automatic Turbine Building El. 591 Generator End (Extended to Diesel Generator Corridor~)
Wet Pipe Automatic Auxiliary Building Cask Handling Area (El. 609)+/*~
Auxiliary Building Drumming Room (El. 587)*/***
Preaction Sprinkler Dry Pilot**
h Preaction Sprinkler Dry Pilot~
Reactor Coolant Pumps (4)*~
Preaction Sprinkler Manual Contractors Access Control Building (El. 612)
Wet Pipe Automatic
- System protects area common to both Units 1 and 2.
- DryPilot Actuation is considered to be a heat actuated pneumatic type detection system.
~Located in areas which also have an automatic detection system.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-39 AMENDMENT NO. 48,
A sl r
I
>I
~
PLANT SYSTEMS LOW PRESSURE CO SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.9.3 The low pressure C02 systems located in the areas shown in Table 3.7-6 shall be OPERABLE.
APPLICABILITY: Whenever equipment in the low pressure CO protected areas-is required to be OPERABLE.
ACTION a
~
With one or more -of the above required low pressure CO systems isolated from automatic operation for personnel protection, verify that at least one zone of fire detection for the affected area is OPERABLE per Specification 4.3.3.7 in order to permit entry for routine tours, maintenance, construction, or surveillance testing, b.
With one or more of the required CO systems shown in Table 3.7-6 inoperable, within 1 hour:
- 1) verify at least one zone of fire detection for the affected area is OPERABLE per Specification 4.3.3.7, and establish a fire watch patrol to inspect the affected fire area once per hour, or 2) Establish a continuous fire watch to patrol'the affected area.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.3 Each of the above required low pressure CO systems shall be demonstrated OPERABLE:
a 0
At least once per 7 days by verifying the -C02 storage tank level to be greater than or equal to 50% and pressure to be greater than or equal to 285 psig, and b.
At least once per 31 days by verifying that each manual valve in the flow path is in the correct position.
c At least once per 18 months by verifying:
The system valves, associated ventilation dampers and fans, and self-closing fire doors operate automatically upon receipt of a simulated actuation signal, and 2.
System actuation methods (automatic from detection system, manual pushbutton station, manual pneumatic release) are tested to verify proper actuation of the syst: em.
3.
Flow from each nozzle during performance of an airflow or CO "Puff Test".
2 COOK NUCLEAR PLANT - UNIT 1 3/4 7-40 AMENDMENT NO. M, 430
J h
W 4
ABL 3
-6 LOW PRESSURE CARBON DIOXIDE SYSTEMS LOCATION Diesel Generator 1AB Room Diesel Generator 1CD Room Diesel Generator Fuel Oil Pump Room 4 KV Switchgear Rooms Control Rod Drive, Transf.
Switchgear Rooms Engineered Safety Switchgear Room Switchgear Room Cable Vault Auxiliary Cable Vault Control Room Cable Vault (Backup)*
Penetration Cable Tunnel Quadrant 1
Penetration Cable Tunnel Quadrant 2
Penetration Cable Tunnel Quadrant 3N Penetration Cable Tunnel Quadrant 3M Penetration Cable Tunnel Quadrant 3S Penetration Cable Tunnel Quadrant 4
CTUA IO PER OD Cross-zoned Heat Cross-zoned Heat Heat Manual Manual Manual Cross-zoned Ionization and Infrared Ionization Manual Manual Manual Manual Manual Manual Manual
- Control Room Cable Vault C02 System i's only required to be operable when the Cable Vault Halon System is, operable.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-41 AMENDMENT NO.
g U
e P
~
t
~ Pfp II I
LON SYSTEMS LIMITI G CONDITION 0
0 ERATION 3.7.9.4 The Halon system located in the Control Room Cable Vault shall be OPERABLE.
to be OPERABLE.
~CTION:
a ~
With the Halon System isolated from automatic operation for personnel protection, verify that at least one zone of fire detection for the affected area is OPERABLE in order to permit entry into the cable vault.
b.
With the above required Halon system inoperable, within 1 hour:
- 1) verify that at least one zone of the fire detection system and the backup CO fire suppression system for the affected area are OPERABLE per 3pecifications 4.3.3.7 and 4.7.9.3
respectively, or 2) establish a continuous fire watch patrol.
C.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.4 The above required Halon system shall be demonstrated OPERABLE:
a.
At least once per 6 months by verifying each Halon storage tank to be greater than or equal to 95% of full charge weight or appropriate liquid level, and to be greater than or equal to 90%
of full charge pressure corrected for ambient temperature.
b.
At least once per 18 months by:
Verifying the system (including associated ventilation dampers and fans, and doors) is tested for proper operation by a simulated actuation signal.
2; System actuation methods (automatic from detection system, manual pushbutton station, and manual cylinder actuator) are to be tested to verify proper actuation of the system.
3.
Performance of an air flow test or C02 puff test through headers and nozzles to assure that there is no blockage.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-42 AMENDMENT NO. W, 430
e'f fe p
!4~
I 1'4
~
'I ih 1 I',
<<A
PLANT SYSTEMS IRE HOSE STATIONS IMI NG CONDITION FO 0
E ON 3.7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE:
APPLICABILITY: Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.
~CTION:
a.
With one or more of the fire hose stations shown in Table 3.7-7 inoperable:
- 1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems are provided or areas where the fixed systems are inoperable), within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, route an additional equivalent capacity fire hose to the affected area(s),
from an OPERABLE hose station(s) per Specification 4.7.9.5, or 2) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.5 Each of the fire hose stations shown in Table 3,7-7 shall be demonstrated OPERABLE:
a ~
At least once per 31 days by a visual inspection of the fire hose stations to assure all required equipment is at the station.
b.
c ~
At least once per 18 months by:
l.
Removing the hose for visual inspection and re-racking, and 2.
Replacement of all degraded gaskets in couplings.
At least once per 3 years by:
Partially opening each hose station valve to verify OPERABILITY and no flow blockage.
2.
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-43 AMENDMENT NO. M, 1-30
hg
TABLE 3.7-7 FIRE HOSE STATIONS Auxiliary Building+*
Access to Diesel Generator Rooms Access to Switchgear Rooms Minimum 12*
Hose Station No.
32 Hose Station No.
58 or No.
211 Access to Control Room Hose Station No.
82 or No.
81 Access to Pressurizer Heater Transformer Room Hose Station No.
31 Access to ESW Pump Rooms, MCC Room, and ESW Basement Area Hose Station No.
23 Access to Auxiliary Feed Pump Rooms Hose Station No.
35
- Shared with Unit 2
- +Within the Controlled Area COOK NUCLEAR PLANT - UNIT 1 3/4 7-44 AMENDMENT NO.
II 0
PLANT SYSTEMS 3 4 10 FIRE RATED ASSEMBLIES LIMITING CONDITION FOR OPERATION 3.7.10 Fire rated assemblies shall be OPERABLE as follows:
All fire rated assemblies (walls, floor/ceilings, and cable tray and conduit enclosures),
separating safe shutdown fire areas or separating portions of redundant systems important to safe shutdown within a fire area shall be OPERABLE.
b.
" All penetration sealing 'devices (fire door assemblies, fire
- dampers, and penetration seals for cable, around conduit, cable tray, piping and ventilation duct work) in the above fire rated assemblies shall be OPERABLE.
APPLICABILITY: At all times.
ACTION:
a ~
With any of the above fire rated assemblies and/or sealing devices inoperable, within 1 hour:
- 1) verify that the fire detectors and/or fire suppression system on at least one side of the inoperable assembly are OPERABLE and establish an hourly fire watch patrol, or 2) establish a continuous fire watch patrol on one side of the penetration, or 3) secure the inoperable sealing device* in the closed position, and establish an hourly fire watch patrol, or 4) for fire dampers and normally locked fire doors, secure the inoperable sealing device in the closed position.***
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.10.1 At least once per 18 months the above required fire rated assemblies and penetration sealing devices shall be verified OPERABLE by:
a
~
b.
C.
Performing a visual inspection of all accessible
- surfaces, of each fire rated assembly, for open penetrations.
Performing a visual inspection of each fire damper and its associated hardware.
Performing a Functional Test, requiring closure testing on 10%
of the fire dampers
~**
Except fire doors on Turbine Driven Auxiliary Feedwater Pump and Hallway enclosures which must remain open due to HELB considerations.
This testing is in addition to the testing required by Specifications 4.7.9.3.c.l and 4.7.9.4.b.l.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-45 AMENDMENT NO.
4I' II II
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Con't d.
Performing a visual inspection of at least 10 percent of each type of penetration seal (cable, around conduit, cable tray,
- piping, and ventilation duct work penetration seals; and cable tray and conduit enclosures required for Appendix R compliance).
If apparent changes in appearance or abnormal degradations are found that could indicate a plant wide trend, a visual inspection of an additional 10 percent of each type of penetration seal shall be made.
This inspection process shall continue until a 10 percent sample with no apparent changes in appearance or abnormal degradation is found.
4.7.10.2 Each of the required fire doors shall be verified OPERABLE by:
a.
Inspecting the hold-open,
- release, and closing mechanism and latches at least once per 6 months.
b.
Verifying the position of each closed fire door at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c ~
Verifying that doors with hold-open and release mechanisms are-free of obstructions at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
Verifying the position of each locked closed fire door at least once per 7 days.
4.7.10.3 Following repairs or maintenance on an above required fire.rated assembly or sealing device, the fire rated assembly or sealing device shall be verified to be operable before exiting the applicable action statement.
COOK NUCLEAR PLANT - UNIT 1 3/4 7-46 AMENDMENT NO.
t I~
t 1A
~
f t++
BASES Continued The visual inspection frequency is based upon maintaining a constant level of snubber protection to systems.
The method for determining the next "interval for the visual inspection of snubbers is provided based upon the number of unacceptable snubbers found during the previous inspection, the category size for each snubber
- type, and the previous inspection interval per NRC Generic Letter 90-09.
A snubber is considered unacceptable if it fails to satisfy the acceptance criteria of the visual inspection.
Any inspection whose results required a shorter -inspection interval will override the previous schedule.
When the cause of the rejection of a snubber is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible, and verified by inservice functional testing, that snubber may be exempted from being counted as inoperable.
Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber by visual inspection, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration.
When a snubber is found inoperable, an engineering evaluation is performed, in addition to the determination of the snubber mode of failure, in order to determine if any safety-related component or system has been adversely affected by the inoperability of the snubber.
The engineering evaluation shall determine whether or not the snubber mode of failure has imparted a significant effect or degradation on the supported component or system.
To provide assurance of snubber functional reliability, a representative sample of the installed snubbers will be functionally tested during plant shutdowns at 24 month intervals.
Observed failures of these sample snubbers shall require functional testing of additional units.
The service life of a snubber is evaluated via manufacturer's input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high radiation area, in high temperature area, etc...).
The requirement to monitor the snubber service life is included to ensure that the snubbers periodically undergo a performance-evaluation in view of their age and operating conditions.
These records will-provide statistical bases for future consideration of snubber service life.
The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.
The number of snubbers to be functionally tested during each surveillance is based on calculations performed to allow extension of the surveillance interval from 18 months to 24 months, and therefore, the number of snubbers functionally tested deviates from the number required by the Westinghouse Standard Technical Specifications (NUREG-0452, Revision 4).
A list of individual snubbers with detailed information of snubber location and size and of system affected shall be available at the plant in accordance with Section 50.71(c) of 10 CFR Part 50.
The accessibility of
,each snubber shall be determined and approved by the Plant Nuclear Safety Review Committee.
The determination shall be based upon the existing COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-6 AMENDMENT NO. 404,
~ I I
I J
I i I+l 4 4 II
~
I."
E
BASES Continued radiation levels and the expected time to perform a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g.,
temperature, atmosphere, location, etc.),
and recommendations of Regulatory Guides 8 '
and 8.10.
The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.
3 4.
9 FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located.
The fire suppression system consists of the water system, spray and/or sprinklers, C02, Halon and fire hose stations.
The collective capability of the fire suppression systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility fire protection program.
In the event that one or more C02 Suppression System requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be OPERABLE by Specification 3.3.3.7 shall be verified to be OPERABLE.
Isolation of an automatic CO suppression system temporarily puts this system in a manual actuation mole.
Reliance on the fire detection
- system, in conjunction with the ability to manually discharge the CO> suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.
In the event that portions of the fire suppression systems are inoperable, alternate backup fire fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service.
When the inoperable fire fighting equipment is intended for use as a backup means of fire suppression, a longer period of time is allowed to provide an alternate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.
Backup fire protection equipment will normally take the form of permanently mounted fire extinguishers and/or fire hose stations in or near the area, or fire hoses routed to the affected area.
However, it is not our intent to rely on backup systems or other
=compensatory measures for an extended period of time and action will be taken to restore the inoperable portions of the fire suppression system to."
OPERABLE status within a reasonable period.
The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met.
An allowance is made for ensuring a sufficient volume of Halon and CO> in the storage tanks by verifying either the weight, level, or pressure of the tanks.
COOK NUCLEAR PLANT - UNIT 1 B 3/4 7-7 AMENDMENT NO.
I~
tt I
~Lt
='ttt
DMINIS TIVE CONTROL 6.10.2 The following records shall be retained for the duration of the Facility Operating License:
a ~
Records and drawing changes reflecting unit design modifications made to systems and equipment described in the Final Safety Analysis Report.
b.
Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
C.
Records of radiation exposure for all individuals entering radiation control areas.
d.
Records of gaseous and liquid radioactive material released to the environs.
Records of transient or operational cycles for those facility components identified in Table 5.9-1.
Records of reactor tests and experiments.
g.
Records of training and qualification for current members of the Plant Staff.
h.
Records of in-service inspections performed pursuant to these Technical Specifications.
i.
Records of Quality Assurance activities required by the QA Manual.
Records of reviews performed for changes made to procedures or equipment or review of tests and experiments pursuant to 10 CFR 50.59.
k.
Records of meetings of the PNSRC and the NSDRC.
1.
Records of radioactive shipments.
m.
Records of the service lives of hydraulic snubbers including the date at which service life commences and associated installation and maintenance records.
6 11 RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
6 12 GH D
ON AREA 6.12.1 In lieu" of the "control, device" or "alarm signal" required by paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area in which the intensity of radiation is 1000 mrem/hr or less shall be barricaded and
'OOK NUCLEAR PLANT - UNIT 1 6-20 AMENDMENT NO. M, 454
5
~'
INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS D.C. Distribution - Operating
- Train N Battery 3/4.8.3 ALTERNATIVE A.C.
POWER SOURCES 3 4 9 REFUELING OPERATIONS System.
SECTION 3 4 PLANT SYSTEMS (Continued) 3/4.7.9 FIRE SUPPRESSION SYSTEMS Fire Suppression Water System..
Spray and/or Sprinkler Systems.
Low Pressure C02 Systems Halon System....,..
Fire Hose Stations..
3.4.7.10 FIRE RATED ASSEMBLIES 3 4 8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C.
SOURCES Operating.
Shutdown.
3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS A.C. Distribution -.Operating..............,...........
A.C. Distribution - Shutdown.
D.C. Distribution - Operating..
~.......................
D.C. Distribution - Shutdown.
PAGE 3/4 7-27 3/4 7-30 3/4 7-34 3/4 7-36 3/4 7-37 3/4 7-39 3/4 8-1 3/4 8-9 3/4 8-10 3/4 8-11 3/4 8-12 3/4 8-16 3/4 8-17 3/4 8-20 3/4.9.1 3/4.9.2 3/4.9.3 3/4.9.4 3/4.9.5 BORON CONCENTRATION INSTRUMENTATION DECAY TIME CONTAINMENT BUILDING PENETRATIONS COMMUNICATIONS 3/4 9-1 3/4 9-2 3/4 9-3 3/4 9-4 3/4 9-5 COOK NUCLEAR PLANT - UNIT 2 IX AMENDMENT NO.
~ +et~
f 4
4 C',a;a s 'I L
PLANT SYSTEMS 3 4 SNUBBERS LIMITING CONDITION FOR OPERATION 3.7.7.1 All safety-related snubbers shall be OPERABLE.
I:"...M systems required OPERABLE in those MODES).
ACTION'ith one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber(s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.7.l.c on the supported component or declare the supported system inoperable and follow the appropriate ACTION statement for that system.
'URVEILLANCE RE UIREMENTS 4.7.7.1 Each snubber shall be demonstrated OPERABLE by performance of the, following augmented inservice inspection program and the requirements of Specification 4.0.5.
a.
Visual Ins ectio Snubbers are categorized as inaccessible or accessible during reactor operation.
Each of these categories (inaccessible and accessible) may be inspected independently according to the schedule determined by Table 3.7-9.
The visual inspection interval for each type of snubber shall be determined based upon the criteria provided in Table 3.7-9 and the first inspection interval determined using this criteria shall be based upon the previous inspection interval as established by the requirements in effect before Amendment No.
b.
Visual Ins ection Acce tance Criteria Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) attachments to.
the foundation or supporting structure are secure, and (3) in those locations where snubber movement can be manually induced without.
disconnecting the snubber, that the snubber has freedom of movement and is not frozen up.
Snubbers which appear inoperable as a result of visual inspections shall be classified as unacceptable and may be reclassified as acceptable for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that COOK NUCLEAR PLANT - UNIT 2 3/4 7-20 AMENDMENT NO.
S7., 408,
+
goal
'LANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued particular snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested in the as-found condition and determined OPERABLE per Specifications 4.7.7.l.d.
All snubbers found connected to an inoperable common hydraulic fluid reservoir shall be counted as unacceptable for determining the next inspection interval.
A review and evaluation shall be performed and documented to justify continued operation with an unacceptable snubber.
If continued operation cannot be justified, the snubber shall be declared inoperable and the ACTION requirements shall be met.
c.
Functional Tests At least once per 24 months during shutdown, a representative sample (14%) of the total of each type of snubber in use in the plant shall be functionally tested either in place or in a bench test.
For each snubber that does not meet the functional test acceptance criteria of Specification 4.7.7.l.d an additional 10% of that type of snubber shall be functionally tested.
The representative sample selected for functional testing shall include the various configurations, operating environments and the range of size and capacity of snubbers.
At least 25% of the snubbers in the representative sample shall include snubbers from the following three categories:
1.
The first snubber away from each reactor vessel nozzle 2.
Snubbers within 5 feet of heavy equipment (valve,
- pump, turbine, motor, etc.)
3.
Snubbers within 10 feet of the discharge from a safety relief valve Snubbers that are identified as "Especially Difficult to Remove" or in "High Radiation Zones During Shutdown" shall also be included in the representative sample.
In addition to the regular sample, snubbers which failed the previous functional test shall be retested during the next test period. If a spare snubber has been installed in place of a failed
- Permanent or other exemptions from functional testing for individual snubbers in these categories may be granted by the Commission only if a justifiable.basis for exemption is presented and/or snubber life destructive testing was performed to qualify snubber operability for all design conditions at either the completion of their fabrication or at a subsequent date.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-21 AMENDMENT NO.
QQ,
rQ i) lR g>
0 %
) i.p 4m~
'l C
44 J, f
.Qll' f
L Lt
~
~l
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued installed in another position) and the spare snubber shall be retested.
Test results of these snubbers may not be included for the re-sampling.
If any snubber selected for functional testing either fails to lockup or fails to move, i.e., frozen in place, the cause will be evaluated and if caused by manufacturer or design deficiency all snubbers of the same design subject to the same defect shall be functionally tested.
This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.
For the snubber(s) found inoperable, an engineering evaluation shall be performed on the components which are supported by the snubber(s).
The purpose of this engineering evaluation shall be to determine if the components supported by the snubber(s) were adversely affected by the inoperability of the snubber(s) in order to ensure that the supported component remains capable of meeting "the designed service.
d.
H draulic Snubbers Functional Test Acce tance Criteria The hydraulic snubber functional test shall verify that:
1.
Activation (restraining action) is achieved within the specified range of velocity or acceleration in both tension and compression.
2.
Snubber bleed, or release
- rate, where required, is within the specified range in compression or tension.
For snubbers specifically required to not displace under continuous
- load, the ability of the snubber to withstand load without displacement shall be verified.
e.
Snubber Service Life Monitorin A record of the service life of each snubber, the date at which the designated service life commences and the installation and mainten-ance records on which the designated service life is based shall be maintained as required by Specification 6.10.2.
Concurrent with the first inservice visual inspection and at least once per 18 months thereafter, the installation and maintenance records for all safety-related snubbers shall be reviewed to verify that the indicated service life has not been exceeded or will not be exceeded prior to the next scheduled snubber service life review. If the indicated service life will be exceeded prior to the next scheduled snubber service life review, the snubber service life shall be reevaluated or the snubber shall be replaced or reconditioned so as to extend its service life'beyond the date of the next scheduled service life review...This reevaluation, replacement or reconditioning shall be indicated in the records.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-22 AMENDMENT NO. 53
+! g HAPP I
I Pf P
I
~ gge 4"
A~P
~,
If If
TABLE 3.7-9 SNUBBER VISUAL INSPECTION INTERVAL NUMBER OF UNACCEPTABLE SNUBBERS Population or Category Notes 1 and 2
Column A Extend Interval Notes 3 and 6
Column B Repeat Interval Notes 4 and 6
Column C
Reduce Interval Notes 5 and 6
80 100 150 200 13 300 12 25 400 18 36 500 12 24 48 750 20 40 78 1000 or greater 29 56 109 Note 1'he next visual inspection interval for a snubber population or category size shall be determined based upon the previous inspection interval and the number of unacceptable snubbers found during that interval.
Snubbers may be categorized, based upon their accessibility during power operation, as accessible or inaccessible.
These categories may be examined separately or jointly.
- However, the licensee must make and document that decision before any inspection and shall use that decision as the basis upon which to determine the next inspection interval for that category.
Note 2:
Interpolation between population or category sizes and the number of unacceptable snubbers is permissible.
Use next lower integer for the value of the limit for Columns A, B, or C if that integer includes a fractional,value of unacceptable snubbers as determined by interpolation.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-23 AMENDMENT NO.
il p
Table 3.7-9 (Continued)
Note 3:
If the number of unacceptable snubbers is equal to or less than the number in Column A, the next inspection interval may be twice the previous interval but not greater than 48 months.
Note 4:
If the number of unacceptable snubbers is equal to or less than the number in Column B but greater than the number in Column A, the next inspection interval shall be the same as the previous interval.
Note 5:
If the number of unacceptable snubbers is equal to or greater than the number in Column C, the next inspection shall be two-thirds of the previous interval.
However, if the number of unacceptable snubbers is less than the number in Column C but greater than the-number in Column B, the next interval shall be reduced proportionally by interpolation, that is, the previous interval shall be reduced by a factor that is one-third of the ratio of the difference between the number of unacceptable snubbers found during the previous interval and the number in Column B to the difference in the numbers in Columns B and C.
Note 6:
The provisions of Specification 4.0.2 are applicable for all inspection intervals up to and including 48 months.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-24 AMENDMENT NO.
~ i
~
I il 1
PLANT SYSTEMS 3 4.
8 SEALED SOURCE CONTAMINATION LIMITING CONDITION FOR OPERATION 3.7.8.1 Each sealed source containing radioactive-material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material, shall -be free of h 0.005 microcuries of removable
'ontamination.
APPLICABILITY: At all times.
ACTION:
a
~
Each sealed source with removable contamination in excess of the above limits shall be immediately withdrawn from use and:
b.
l.
Either decontaminated and repaired, or 2.
Disposed of in accordance with Commission Regulations.
The provisions of Specification 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.8.1.1 Test Re uirements
- Each sealed source shall be tested for leakage and/or contamination by:
a.
The licensee, or b.
Other persons specifically authorized by the Commission or an Agreement State.
The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.
4.7.8.1.2 Test Fre uencies
- Each category of sealed sources shall be.tested at the frequency described below.
a.
Sources in use excludin startu sources and fission detectors reviousl sub ected to core flux
- At least once per six months for all sealed sources containing radioactive materials.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-25 AMENDMENT NO. 4k,
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 1.
With a half-life greater than 30 days (excluding Hydrogen 3),
and 2.
In any form other than gas.
b.
Stored sources not in use
- Each sealed source and fission detector shall be tested prior to use or transfer to another licensee unless tested within the previous six months.
Sealed sources and fission detectors transferred without a certificate indicating the last test date shall be tested prior to being placed into use.
C.
Startu sources and fission detectors
- Each sealed startup source and fission detector =shall be tested within 31 days prior to being subjected to core flux or installed in the core and following repair or maintenance to the sources 4.7.8.1.3
~Re orts
- A report shall be prepared aud submitted to the Commission on an annual basis if sealed source or fission detector leakage tests reveal the presence of h 0.005 microcuries of removable contamination.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-26 AMENDMENT NO.
p
~r 4)
A QA' I
I 4
I
PLANT SYSTEMS 3
4 9 FIRE SUPPRESSION SYSTEMS
'FIRE SUPPRESSION WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.9.1 The fire suppression water system shall be OPERABLE with:
a.
Two* high demand 2000 GPM pumps, one of which shall be a diesel driven pump, with their discharge aligned to the fire-suppression header.
b.
An OPERABLE open flow path capable of taking suction from Lake Michigan and transferring the water through distribution piping (with OPERABLE sectionalizing valves) up to the yard hydrant curb control valves and up to the hose station valve(s) or water s'uppression system controlling valve(s) required to be OPERABLE per Specifications 3.7.9.5 and 3.7.9.2, respectively.
APPLICABILITY: At all times.
ACTION a.
With only one pump operable, restore an inoperable pump (diesel, if required),
and equipment to OPERABLE status within 7 days or establish a backup fire suppression water system within the next 7 days.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
b.
With the fire suppression water system otherwise inoperable:
1.
Restore the fire suppression water distribution system to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or 2.
Establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- Four High Demand Fire Pumps (two per unit) are shared between Units 1 and 2.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-27 AMENDMENT NO.
h V
~g<
"C~
t l
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.9.1.1 The fire suppression water system shall be demonstrated OPERABLE:
At least once per 31 days on a STAGGERED TEST BASIS by starting each pump and operating it for at least 15 minutes on recirculation flow.
At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in flow path that is not locked,
- sealed, or otherwise secured in position, is in its correct position.
c ~
At least once per 6 months by performance of a system flush of above ground internal distribution headers and fire hydrants.
At least once per 12 months by cycling each testable valve in the flow,path through at least one complete cycle of full travel.
e.
At least once per 18 months by performing a system functional test which includes simulated automatic actuation of the system throughout its operating
- sequence, and:
1.
Verifying that each automatic valve in the flow path actuates to its correct position, 2.
Verifying that each pump develops a flow of at least 2000 gpm at a system head of at least 300 feet of water by observing three points (minimum, rated and peak) on the pump's performance curve.
3.
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and 4.
Verifying that each high pressure pump starts in its preplanned sequence to maintain the fire suppression water system pressure greater than 100 psig.
At least once per 3 years by performing a series of flow tests so that every fire main segment (excluding individual system supplies) has been verified to be clear of obstructions by a full flow test.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-28 AMENDMENT NO. 4k, 4k&
4 aV
~
lg
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.1.2 The fire pump diesel engine shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying:
1.
The fuel storage tank contains at least 160 gallons of fuel, and 2.
The diesel starts from ambient conditions and operates for at least 30 minutes.
b.
At least once per 92 days by verifying that a sample of diesel -fuel from the fuel storage tank obtained in accordance with ASTM-D4057-81 is within the acceptable limits specified in Table 1 of ASTM-D975-81 when checked for viscosity, water and sediment.
C.
At least once per 18 months by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.
4.7.9.1.3 The fire pump diesel starting battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1.
The electrolyte level of each battery is above the plates, and 2.
The output battery voltage of each bank is greater than 24 volts.
b.
At least once per 92 days by verifying that the specific gravity is appropriate for continued service of each battery.
c ~
At least once per 18 months by verifying that:
1.
The batteries, cell plates and battery packs show no visual indication of physical damage or abnormal deterioration, and 2.
The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anti-corrosion material.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-29 AMENDMENT NO. 44, 4k&
CW $
1
PLANT SYSTEMS SPRAY AND OR SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.9.2 The spray and/or sprinkler systems located in the areas shown in Table 3.7-5A and 3.7-5B shall be OPERABLE:
APPLICABILITY: Whenever equipment in-the spray/sprinkler-protected area is required to be OPERABLE:
ACTION:
a.
With one or more of the water spray systems as listed in Table 3.7-5A inoperable, within 1 hour:
- 1) verify that the detection system for the affected filtration unit is OPERABLE per Specification 4.3.3.8, or 2) establish a continuous fire watch patrol.
b.
With one or more of the sprinkler systems as listed in Table 3.7-5B inoperable, within 1 hour: 1) verify that at least one of the detection systems, where provided (electric per Specification 4.3.3.8 or pneumatic per Table 3.7-5B), for the affected area is OPERABLE and establish an hourly fire watch patrol, or 2) establish a continuous fire watch patrol.*
C.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
- For high radiation areas, periodic monitoring (and hourly logging) of the closed circuit television coverage is an acceptable substitute for a continuous fire watch.
For high radiation areas where closed circuit.
-television coverage does not exist,. an hourly -fire watch patrol will be instituted.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-30 AMENDMENT NO. 4k,
I
~
4 I
'I Q I ~
hh
~
I I
I Ih I
4
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.9.2 Each of the above required water spray and/or sprinkler systems shall be demonstrated to be OPERABLE:
a.
At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel as provided by Technical Specification 4.7 '.1.l.d.
b.
At least once per 18 months:
1.
By performing,a system functional test which includes simulated automatic actuation of the system, and:
a) Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and b) Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
2.
By visual inspection of deluge and preaction system piping (this is not required for systems supervised by air) to verify their integrity.
3.
By visual inspection of each open head deluge nozzle to verify that there is no blockage.
C.
At least once per 3 years by performing an air flow test through the, piping of each open head deluge system and verifying each open head deluge nozzle is unobstructed.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-31 AMENDMENT NO. Mf kloof
e 4
't
OPEN HEAD DELUGE WATER SPRAY SYSTEMS LOCATION ACTUATION 2-HV-AES-1 Charcoal Filters 2-HV-AES-2 Charcoal Filters 2-HV-ACRF-1 Charcoal Filters 2-HV-CPR-1 Charcoal Filters 2-HV-CIPX Charcoal Filters 12-HV-AFX Charcoal Filters*
Manual
- Electric - Heat Manual - Electric - Heat Manual - Electric - Heat Manual
-.Electric
- Heat Manual - Electric
- Heat Manual - Electric
- Heat
- Shared system with Unit l.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-32 AMENDMENT NO. 84,
g f I
~l x
~t 1,
4
TABLE 3
-5 B
CLOSED HEAD SPRINKLER SYSTEMS LOCATION Auxiliary building El.
587 ft.*/***(Normally accessible
- areas, charging and Safety Injection Pump
- Rooms, stairways to El.
573 and 609)
TYPE SYSTEM Preaction Sprinkler ACTUATION Dry Pilot**
Auxiliary building El.
609 ft.*/***(Normally accessible
- areas, CCW Pump area, stairways to El. 633)
Preaction Sprinkler Dry Pilot**
Auxiliary building El.
633 ft.*/***(Normally accessible
- areas, excluding HVAC Vestibule Areas and stairways to El. 650)
Preaction Sprinkler Dry Pilot**
Auxiliary Turbine Driven Feedwater Pump and Pump Corridor*/*~
Turbine Building 591 ft.
El. Generator End (Extended to Diesel Generator Corridor***)
Wet Pipe Wet Pipe Automatic Automatic Auxiliary,Building Cask Handling Area (El. 609)
%/***
Preaction Sprinkler Dry Pilot**
Auxiliary Building Drumming Area (El. 587)+/+**
Preaction Sprinkler Dry Pilot**
Reactor -Coolant Pumps (4)***
Preaction Sprinkler Manual
- System protects area common to both Units 1 and 2.
- DryPilot Actuation is considered to be a heat actuated pneumatic type detection system.
- Located in areas which also have an automatic detection system.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-33 AMENDMENT NO.
a ka ~'
4,i
~ Q
~
4 I ~
III
~
7 k 0
PLANT SYSTEMS LOW PRESSURE CO SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.9.3 The low pressure C02 systems located in the areas shown in Table 3.7-6 shall be OPERABLE.
APPLICABILITY: Whenever equipment in the low pressure CO protected areas is required to be OPERABLE.
ACTION:
a.
With one or more of the required low pressure C02 systems isolated from automatic operation for personnel protection, verify that at least one zone of fire detection for the affected area is OPERABLE per Specification 4.3.3.8 in order to permit entry for routine
- tours, maintenance, construction, or surveillance testing.
b.
With one or more of the required C02 systems shown in Table 3.7-6 inoperable, within 1 hour: 1) verify at least one zone of fire detection for the affected area is OPERABLE per Specification 4.3.3.8, and establish a fire watch patrol to inspect the affected fire area once per hour, or 2) Establish a continuous fire watch to patrol the affected area.
c.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.3 Each of the above required low pressure C02 systems shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying the C02 storage tank level to be greater than or equal to 50% and pressure to be greater than or equal to 285 psig, and b.
At least once per 31 days by verifying that each manual valve in the flow path is in the correct position.
b.
At least once per 18 months by verifying:
The systems valves, associated ventilation dampers and fans, and self-closing fire doors operate automatically upon receipt of a simulated actuat'.ion signal, and 2.
System actuation methods (automatic.from detection system, manual pushbutton station, manual pneumatic release) are tested to verify proper actuation of the system.
3.
Flow from each nozzle during performance of an air flow or C02 "Puff Test".
COOK NUCLEAR PLANT - UNIT 2 3/4 7-34 AMENDMENT NO. 50,
l
<r 4 ~
~=(
~
'~r~,>>
~
TABLE 3
-6 LOW PRESSURE CARBON DIOXIDE SYSTEMS LOCATION ACTUATION PERIOD Diesel Generator 2AB Room Diesel Generator 2CD Room Diesel Generator Fuel Oil.Pump Room 4KV Switchgear Rooms Control Rod Drive, Transf.
Switchgear Rooms Engineered Safety Switchgear Room Switchgear Room Cable Vault Cross-Zoned Heat Cross-Zoned Heat Heat Manual Manual Manual Cross-Zoned Ionization and Infrared Auxiliary Cable Vault Control Room Cable Vault (Backup)*
Penetration Cable Tunnel Quadrant 1
Penetration Cable Tunnel Quadrant 2
Penetration Cable Tunnel Quadrant 3N Penetration Cable Tunnel Quadrant 3M Penetration Cable Tunnel Quadrant 3S Penetration Cable Tunnel Quadrant 4
Ionization Manual Manual Manual Manual Manual Manual Manual
- Control Room Cable Vault C02 System is only required to be operable when the
-,Cable.Vault Halon System is inoperable..
COOK NUCLEAR PLANT - UNIT 2 3/4 7-35 AMENDMENT NO. 4k,
E It4 I
~
t 0
J4 kN w'l),p 1
<<IL
P SYSTEMS HALON SYST LIMITING CONDITION FOR OPERATION 3.7.9.4 The Halon system located in the Control Room Cable Vault shall be OPERABLE.
aH be OPERABLE.
ACTION a.
With the Halon System isolated from automatic operation for personnel protection, verify that at least one zone of fire detection for the affected area is OPERABLE in order to permit entry into the cable vault.
b.
With the above required Halon system inoperable, within 1 hour:
- 1) verify that at least one zone of the fire detection system and the backup CO fire suppression system for the affected area are OPERABLE per Specifications 4.3.3.8 and 4.7.9.3 respectively, or 2) establish a continuous fire watch patrol.
c.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.4 The above required Halon syst'm shall be demonstrated OPERABLE:
a.
At least once per 6 months by verifying each Halon storage tank to be greater than or equal to 95% of full charge weight or appropriate liquid level, and to be greater than or equal to 90% of full charge pressure corrected for ambient temperature.
b.
At least once per 18 months by:
1.
Verifying the system (including associated ventilation dampers and fans, and doors) is tested for proper operation by a simulated actuation signal.
2.
System actuation methods (automatic from detection
- system, manual pushbutton station, and manual cylinder actuator) are to be tested to verify proper actuation of the system.
3.
Performance of an,air flow test or C02 puff test through headers and nozzles to assure that there is no blockage.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-36 AMENDMENT NO. 4k,
PLANT SYSTEMS FIRE HOSE STATIONS LIMITING CONDITION FOR OPERATION 3.7.9.5 The fire hose stations shown in Table 3.7-7 shall be OPERABLE:
APPLICABILITY:
Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.
~CTION:
a.
With one or more of the fire hose stations shown in Table 3.7-7 inoperable:
- 1) For those areas where the inoperable fire hose station is the primary means of fire suppression (areas where no fixed systems are provided or areas where the fixed systems are inoperable), within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, route an additional equivalent capacity fire hose to the affected area(s) from an OPERABLE hose station(s)
"per Specification 4.7.9.5, or 2) within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, verify that the fixed fire suppression system(s) that also protects the affected area(s) serviced by the fire hose station(s) is OPERABLE.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.9.5 Each of the fire hose stations shown in Table 3.7-7 shall be demonstrated OPERABLE:
a.
At least once.per 31 days by a visual inspection of the fire hose stations to assure all required equipment is at the station.
b.
c ~
At least once per 18 months by:
1.
Removing the hose for visual inspection and re-racking, and 2.
Replacement of all degraded gaskets in couplings.
At least once per 3 years by:
1.
Partially opening each hose station valve to verify OPERABILITY and no flow blockage.
2.
Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psi greater than the maximum pressure available at that hose station, whichever is greater.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-37 AMENDMENT NO. 4k,
,'4[
't ll l
gr
FIRE HOSE STATIONS Auxiliary Building+*
Access to Diesel Generator Rooms Access to Switchgear Rooms Access to Control Room Access to Pressurizer Heater Transformer Room Minimum 12*
Hose Station No.
7 Hose Station No. 45 or No.
212 Hose Station No.
65 or No.
81 Hose Station No.
12 Access to ESW Pump Rooms, MCC Room, and ESW Basement Area Hose Station No.
20 Access 'to'Auxiliary Feed Pump Rooms
--Hose Station No.
9
- Shared with Unit 1
- Withinthe Controlled Area COOK NUCLEAR PLANT - UNIT 2 3/4 7-38 AMENDMENT NO.
riel JW E t
0
~
~
I ii%4 ltd 4 4
k,
PLANT SYSTEMS 3 4 10 FIRE RATED ASSEMBLIES LIMITING CONDITION FOR OPERATION 3.7.10 Fire rated assemblies shall, be OPERABLE as follows:
a.
All fire rated assemblies (walls, floor/ceilings, and cable tray and conduit enclosures),
separating safe shutdown fire areas or separating portions of redundant systems important to safe shutdown within a fire area shall be OPERABLE.
b.
All penetration sealing devices (fire door assemblies, fire
- dampers, and penetration seals for cable, around conduit, cable tray, piping and ventilation duct work) in the above fire rated assemblies shall be OPERABLE.
APPLICABILITY: At all times.
ACTION:
a.
With any of the above fire rated assemblies and/or sealing devices inoperable, within 1 hour:
- 1) verify that the fire detectors and/or fire suppression system on at least one side of the inoperable assembly are OPERABLE and establish an hourly fire watch patrol, or 2) establish a continuous fire watch patrol on one side of the penetration, or 3) secure the inoperable sealing device* in the closed position, and establish an hourly fire watch patrol, or (4) for fire dampers and normally locked fire doors, secure the inoperable sealing device in the closed position.***
b.
The provisions of Specification,3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE RE UIREMENTS 4.7.10.1 At least once per 18 months the above required fire rated assemblies and penetration sealing devices shall be verified OPERABLE by:
a.
Performing a visual inspection of all accessible
- surfaces, of each fire rated assembly, for open penetrations.
b.
Performing a visual inspection of each fire damper and its associated hardware.
c.
Performing a Functional Test, requiring closure testing on 10$ of the fire dampers.**
I
,*Except fire doors on Turbine Driven Auxiliary Feedwater Pump and Hallway enclosures which must remain open due to HELB considerations.
, **This testing is in addition to the testing required by Specifications 4.7.9.3.c.l and 4.7.9.4.b.l.
COOK NUCLEAR PLANT - UNIT 2 3/4 7-39 AMENDMENT NO. 4k,
~
~
PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Con't d.
Performing a visual inspection of at least 10 percent of each type of penetration seal (cable, around conduit, cable tray, piping, and ventilation duct work penetration seals; and cable tray and conduit enclosures required for Appendix R compliance).
If apparent changes in appearance or abnormal degradations are found that could
-indicate a plant wide trend, a visual inspection of"an additional 10 percent of each type of penetration seal shall be made.
This inspection process shall continue until a 10 percent sample with no apparent changes in appearance or abnormal degradation is found.-
4.7.10.2 Each of the required fire doors shall be verified OPERABLE by:
a.
Inspecting the hold-open,
- release, and closing mechanism and latches at least once per 6 months.
b.
'.Verifying the position of each closed fire door at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
-c.
Verifying that doors with hold-open and release mechanisms are free of obstructions at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
d.
Verifying the position of each locked closed fire door at least once per 7 days.
4.7.10.3 Following repairs or maintenance on an above required fire rated assembly or sealing device, the fire rated assembly or sealing device shall be verified to be operable before exiting the applicable action statement.-
COOK NUCLEAR PLANT - UNIT 2 3/4 7-40 AMENDMENT NO ~
~ l I
I r
~ '2 d~"
~~
(
II
PLANT SYSTEMS BASES 3 4 6 ESF VENTILATION SYSTEM The OPERABILITY of the ESF ventilation system ensures that adequate cooling is provided for ECCS equipment and that radioactive materials leaking from the ECCS equipment within the pump rooms following a LOCA are filtered prior.to reaching the environment.
The operation of this system and the resultant effect on offsite dosage calculations were assumed in the accident analyses.
The 1980 version of ANSI N510 is used as a testing guide.
This
- standard, however, is intended to be rigorously applied only to systems which, unlike the ESF ventilation system, are designed to ANSI N509 standards.
For the specific case of the air-aerosol mixing uniformity test required by ANSI N510 as a prerequisite to in-place leak testing of charcoal and HEPA filters, the air-aerosol uniform mixing test acceptance criteria were not rigorously met.
For this reason, a statistical correction factor will be applied to applicable surveillance test results where required.
3 4
'HYDRAULIC SNUBBERS All snubbers are required OPERABLE to ensure that the structural integrity of the reactor coolant system and all other safety related systems is maintained during and following a seismic or other event initiating dynamic loads.
Snubbers excluded from this inspection program are those installed on non-safety related systems and then only if their failure or failure of the system on which they are installed, would have no adverse effect on any safety-related system.
The visual inspection frequency is based upon maintaining a constant level of snubber protection to systems.
The method for determining the next interval for the visual inspection of snubbers is provided based upon the-number of unacceptable snubbers found during the previous inspection, the category size for each snubber
- type, and the previous inspection interval per NRC Generic Letter 90-09.
A snubber is considered unacceptable if it fails to satisfy,:theacceptance criteria of the visual inspection.
Any inspection whose results required a shorter inspection interval will override the previous schedule, When the cause of the rejection of a snubber is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible, and verified by inservice functional testing, that snubber may be exempted from being counted as inoperable.
Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber by visual inspection, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration.
The service life of a snubber is evaluated via manufacture's input and information through consideration of the snubber service conditions and associated installation and maintenance records (newly installed snubber, seal replaced, spring replaced, in high.,radiation area, in high temperature area, etc...).
The requirement to monitor the snubber service life is COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-5 AMENDMENT NO.
~ gk t$P
>K
~t<
$4 y 4
i*., ~
444,gj, f
ll
PLANT SYSTEMS BASES included to ensure that the snubbers periodically undergo a performance evaluation in view of their age and operating conditions.
These records will provide statistical bases for future consideration of snubber service life.
The requirements for the maintenance of records and the snubber service life review are not intended to affect plant operation.
The number of snubbers to be functionally tested during each surveillance is based on calculations performed to allow extension of the surveillance interval from 18 months to 24 months, and therefore, the number of snubbers functionally tested deviates from the number required by the Westinghouse Standard Technical Specifications (NUREG-0452, Revision 4).
A list of individual snubbers with detailed information of snubber location and size and of system affected shall be available at the plant in accordance with Section 50.71(c) of 10 CFR Part 50.
The accessibility of each snubber shall be determined and approved by the Plant Nuclear Safety Review Committee.
The determination shall be based upon the existing radiation levels and 'the expected time to perform a visual inspection in each snubber location as well as other factors associated with accessibility during plant operations (e.g.,
temperature, atmosphere, location, etc.),
and the recommendations of Regulatory Guides 8.8 and 8.10.
The addition or deletion of any snubber shall be made in accordance with Section 50.59 of 10 CFR Part 50.
3 4 8 SEALED SOURCE CONTAMINATION The limitations on removable contamination for sources requiring leak
- testing, including alpha emitters, is based on 10 CFR 70.39(c) limits for plutonium. This limitation will ensure that leakage from byproduct, source and special nuclear material sources will not exceed allowable intake values.
3 4 9
FIRE SUPPRESSION SYSTEMS The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located.
The fire suppression system consists of the water system, spray and/or sprinklers, C02, Halon and fire hose stations, The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the event that one or more C02 Suppression System requiring automatic actuation must be isolated for personal protection to permit entry for routine tours, maintenance, construction, or surveillance testing in the protected area, the fire detection system(s) required to be operable by Specification 3.3.3.7 shall be verified to be operable.
Isolation of an automatic C02 suppression system temporarily puts this system in a manual actuation mode.
Reliance on the fire detection system, in conjunction with the ability to manually'discharge the C02 suppression system will provide adequate fire protection for periods when personnel are required to work in these areas.
COOK NUCLEAR PLANT - UNIT 2 B 3/4 7-6 AMENDMENT NO. M, 408,
- s
~ I ~
d4i4 E~J
ADMINISTRATIVE CONTROLS 6.10.2 The following records shall be retained for the duration of the Facility Operating License:
Records and drawing changes reflecting unit design modifications made to systems and equipment described in the Final Safety Analysis Report.
b.
Records of new and irradiated fuel inventory, fuel transfers and assembly burnup histories.
C.
Records of radiation exposure for all individuals entering radiation control areas.
d.
Records of gaseous and liquid radioactive material released to the environs.
e.
Records of transient or operational cycles for those facility components identified in Table 5.7-1.
f.
Records of reactor tests and experiments.
g.
Records of training and qualification for current members of the Plant Staff.
h.
Records of in-service inspections performed pursuant to these Technical Specifications.
i.
Records of Quality Assurance activities required by the QA Manual, Records of reviews performed for changes made to procedures or equipment or review of tests and experiments pursuant to 10 CFR 50.59.
k.
Records of meetings of the PNSRC and the NSDRC.
1.
Records of radioactive shipments.
m.
Records of the service lives of hydraulic snubbers including the date at which service life commences and associated installation and maintenance records.
6 ll RADIATION PROTECTION PROGRAM Procedures for personnel radiation protection shall be prepared consistent with the requirements of 10 CFR Part 20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
6 12 HIGH RADIATION AREA 6.12.1 In lieu of the "control device" or "alarm signal" required by paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area in which the intensity of radiation is 1000 mrem/hr or less shall be barricaded and COOK NUCLEAR PLANT - UNIT 2 6-20 AMENDMENT NO.
.9312010008 ATTACHMENT 1 TO AEP:NRC:1137B 10 CFR 50.92 ANALYSIS FOR CHANGES TO THE DONALD C.
COOK NUCLEAR PLANT UNITS 1 AND 2 TECHNICAL SPECIFICATIONS
Attachment 1 to AEP:NRC:1137B Page 1
DESCRIPTION OF CHANGES AND REASONS FOR CHANGES This amendment request proposes various changes to the technical specifications (T/S) that are administrative or editorial in nature.
The changes are intended to correct various oversights or errors in the present
- document, or to update the document to reflect current plant conditions.
The changes are discussed individually below.
Erroneous Descri tion of 0 erator Action for Rollu Doors Unit:
1 and 2
T/S; Bases 3/4.9.12 (Units 1 and 2)
Page:
B 3/4 9-3 (Units 1 and 2)
In Amendments 124 (Unit 1) and ill (Unit 2) a clarification was added to the Bases for the storage pool ventilation system T/S to indicate that the crane bay rollup door and the drumming room rollup doors could be opened under administrative control during movement of fuel within the storage pool or during crane operation with loads over the pool.
The clarification added to the bases contains an example of an acceptable administrative control, i.e., stationing of an individual at the door during these operations that would be in communication with personnel in the storage pool area and could close the door in the event of a fuel handling emergency.
- However, the example was inadvertently worded such that the individual stationed at the door is described as having to open the door in the event of an emergency, rather than close it.
Since the purpose of stationing the individual at the door would be to close the door to prevent radioactive gases from escaping through the
- door, the present description is clearly erroneous.
Ve are proposing to change the wording to indicate that the individual is to close the door in the event of an emergency.
2.
Incorrect Unit Numbers for Fire Detection S stems and Incorrect Room Unit: 1 and 2
T/S:
3.3.3.8, Table 3.3-10 (Unit 1), 3.3.3.8, Table 3.3-11 (Unit 2)
Page:
3/4 3-53a (Unit 1), 3/4 3-52 (Unit 2)
Unit 1 Table 3,3-10 (Unit 1
and Common Fire Detection Systems) incorrectly identifies some Unit 1
charcoal filter ventilation units.
The prefix given in Table 3,3-10 identifies these ventilation units as being in Unit 2, when they actually are in Unit 1.
The current listing of the incorrect units is as follows:
I C
Attachment 1 to AEP:NRC:1137B Page 2
Ul Charcoal Filter Ventilation Units a) 2-HV-AES-1 b) 2-HV-AES-2 c) 2-HV-ACRF d) 2-HV-CIPX e) 2-HV-CPR The listing of these units is corrected by changing the first digit from a "2" to a "l." Unit 2 has analogous ventilation units, which are correctly listed in Unit 2 Table 3.3-11.
One editorial change is proposed to Unit 2 Table 3.3-11 on page 3/4 3-52.
The table listing that currently reads "U2 Diesel Fuel Oil XFMR. Rm" is being changed to U2 Diesel Fuel Oil Transfer Pump Rm."
The room contains the fuel oil transfer
- pumps, not transformers.
The analogous Unit 1 room is appropriately described in Unit 1 Table 3.3-10.
This change corrects the error in the Unit 2 table and makes the listings consistent between the units.
Correction of Fi ure Reference Unit: 1 and 2
T/S:
3.11.2.4 (Units 1 and 2)
Page:
3/4 11-12 (Units 1 and 2)
In the first sentence of the limiting condition for operation, reference is made to "Figure 5.1
~ 3."
The actual figure reference is "Figure 5.1-3."
II Reference to Correct Version of FSAR Unit: 1 and 2
T/S:
6.2.1.a (Units 1 and 2)
Page:
6-1 (Units 1 and 2)
T/S 6.2.1.a currently states that organizational charts will be documented in the FSAR.
In practice, the organizational charts are documented in the Updated FSAR (UFSAR).
Therefore, we are proposing to change the reference from "FSAR" to "UFSAR."
Attachment 1 to AEP:NRC:1137B Page 3
5.
eference to 10 CFR 55 Unit: 1 and 2
T/S:
6.4 (Units 1 and 2)
Page:
6-4 (Units 1 and 2)
T/S 6.4 (Training) references Appendix A to 10 CFR 55.
10 CFR 55 has been rewritten, and the material formerly included in Appendix A has been incorporated into the body of 10 CFR 55.
Therefore, we are proposing to change the reference to 10 CFR 55.
6.
Descri tion of P-8 Interlock Unit:
1 and 2
T/S:
3.3.1.1, Table 3.3-1 (Units 1 and 2)
Page:
3/4 3-9 (Unit 1), 3/4 3-8 (Unit 2)
As currently written, the description of the P-8 interlock is as follows:
P-8 prevents or defeats the automatic block of reactor trip caused by either a low coolant flow condition in a single loop or a reactor coolant pump breaker trip on a single loop.
(emphasis added)
In T/S amendment 140 (Unit 1) and 127 (Unit 2),
the NRC approved deletion of the aspect of the P-8 interlock function involving reactor trip on reactor coolant pump breaker trip in a single loop.
Prior to Amendment 140/127, the reactor coolant pump breaker position provided an anticipatory reactor trip for low flow in one loop in a one out of four trip logic above the P-8 interlock.
Via amendment 140/127, this was modified such that it is a two out of four logic for all power levels above the P-7 permissive.
This change was made to avoid, a spurious reactor trip on a false signal from a single reactor coolant pump breaker auxiliary contact.
The change to the reactor trip logic was appropriately reflected in changes to Functional Unit 20 of T/S Table 3.3-1.
- However, the change was not captured in the description of the P-8 interlock included at the end of that table.
In order to correct this oversight, we are proposing to reword the P-8 interlock description to delete reference to the reactor trip on reactor coolant pump breaker trip on a single loop.
The revised description is as follows:
Attachment 1 to AEP:NRC:1137B Page 4
P-8 prevents or defeats the automatic block of reactor trip caused by a
low coolant flow condition in a single loop.
One minor editorial change is proposed in con]unction with this change.
We are proposing to delete the word "POWER" in the description of the P-8 interlock in Unit 1 so that the Unit 1 and Unit 2 descriptions are identical.
7 ~
Correction of Meteorolo ical Tower Location Unit: 1 and 2
T/Ss 5.8.1 (Unit 1), 5.5.1 (Unit 2), Figure 5.1-1 (Units 1 and 2)
Page:
5-9 and 5-2 (Unit 1), 5-5 and 5-2 (Unit 2)
T/S 5.8.1 (Unit 1) and 5.5.1 (Unit 2), entitled "Meteorological Tower Location," states that the meteorological tower location is depicted in Figure 5.1-1.
Figure 5.1-1 shows a meteorological tower located between the plant and Interstate 94.
This was the correct location for the old meteorological tower.
- However, a
new meteorological tower has been installed, as approved by the NRC via Amendment 127 (Unit 1) and 113 (Unit 2).
The location of the new tower is correctly shown on Figure 5.1-3.
In order to correct this error, we are proposing to change the figure reference for T/S 5.8.1 (Unit 1) and 5.5.1 (Unit 2) from Figure 5.1-1 to Figure 5.1-3, and to remove the meteorological tower depiction from Figure 5.1-1.
8.
Removal of Outdated Footnotes for Post-Accident Instrumentation Unit: 1 and 2
T/S:
3/4.3.3.8, Tables 3.3-11 and 4.3<<7, and Bases 3/4.3.3.8 (Unit 1) 3/4.3.3.6, Tables 3.3-10 and 4.3-10 Page:
3/4 3-55 and 56, B 3/4 3-6 (Unit 1) 3/4 3-46 and 47 (Unit 2)
We are proposing to remove the footnotes for the containment sump level and containment water level instruments which state that the recpxirements for these instruments will become effective after the level transmitters are modified or replaced and become operational.
The instruments have been in service for several
- years, and therefore the footnote is no longer needed.
We are also modifying the Unit 1
Bases section to remove discussion related to these footnotes.
Attachment 1 to AEP:NRC:11378 Page 5
We are also proposing to delete the quintuple footnote for Table 3.3-11 (Unit 1) and Table 3.3-10 (Unit 2) associated with the safety valve position indicator acoustic monitor.
These footnotes were added in Amendment 161 (Unit 1) and 145 (Unit 2),
and provided exemptions from the T/S requirements associated with these monitors for the previous fuel cycles.
An identical change was proposed in our letter AEP:NRC:1170D, dated August 12,
- 1992, but is repeated here for consistency.
Additionally, we are proposing to delete footnote 4 for Unit 2, Table 4.3-10.
This footnote indicated that surveillances associated with functional Unit 15 (Core Exit Thermocouples) were not required until after the 1988 refueling outage.
This footnote is no longer
- needed, and therefore is proposed for deletion.
9.
Correction of Error in Storage Pool Ventilation System Flow Rate Unit:
2 T/8$
4.9.12.b 4
Pages 3/4 9-13 We are proposing to correct a typographical error in the storage pool ventilation system flow rate in T/S 4.9.12.b.4.
The flow rate is listed as "30,0000 cfm."
This value contains an extra "0."
The correct flow rate is 30,000
- cfm, as indicated elsewhere in T/S 4.9.12 and in the Unit 1 T/s.
10.
Correction of Crane Travel Surveillance Requirements Unit: 1 and 2
T/S:
4.9.7.1 (Units 1 and 2)
Page:
3/4 9-8 (Unit 1), 3/4 9-7 (Unit 2)
T/S 4.9.7.1 requires demonstration of operability of the auxiliary building crane interlocks and physical stops which prevent crane travel wi'th loads in excess of 2,500 pounds over fuel assemblies.
Although there are physical stops on the crane trolley and bridge rails, these stops are not in locations that prevent crane travel over fuel assemblies.
The protection required by the T/S is accomplished through the crane interlocks.
Therefore, we are proposing to delete reference to the physical stops so that the T/S accurately reflects the'crane design.
Attachment 1 to AEP:NRC:1137B Page 6
11.
Removal of Unnecessary Bases Material on APDMS Units 2
T/S:
Bases 3/4.3.3.7 Pages B 3/4 3-3 Unit 2 Bases section 3/4.3.3.7 contains explanatory material for the Axial Power Distribution Monitoring System (APDMS).
- However, T/S Amendment 82 eliminated T/S 3/4.3.3.7, and the equipment was subsequently removed.
The Bases section should have been removed at that time, but was not due to an oversight.
Therefore, we are proposing to delete the Bases text.
12.
Correction of Control Room Cable Vault Fire Protection Requirements Unit: 1 T/S:
3.7.9.3, Table 3.7-6 Page:
3/4 7-41 We are proposing to modify the footnote associated with the control room cable vault (backup)
C02 system.
Currently, the footnote states that the COp system is only required to be operable when the cable vault halon system is operable.
Since the CO~ system is a
backup to the halon system, the footnote should state that the COp system is required when the cable vault halon system is inoperable.
The wording is correct in the corresponding Unit 2 page.
13.
Correction of Automatic Trip Logic Action Units 2
T/S:
3.3.1.1, Table 3.3-1 Page:
3/4 3-4 Functional Unit 22 (Automatic Trip Logic) of Table 3.3-1 (Reactor Trip System Instrumentation) needs clarification in the "Applicable Modes" and "Action" columns.
Specifically, we are proposing to revise these columns for Functional Unit 22 such that it is clear that Action 1 applies in Modes 1 and 2, and Action 14 in Modes 3, 4, and 5.
The "Applicable Modes" versus "Action" listing is correctly shown in the Unit 1 T/S.
The Unit 2 T/S was corrected in Amendment 107.
However, the error was accidently reintroduced in Amendment 127 due to an overlap of submittals.
W l
~
~
fi ~
Attachment 1 to AEP:NRC:1137B Page 7
B.
10 CFR 50 92 Criteria Per 10 CFR 50.92, a proposed amendment does not involve a significant hazards consideration if the change does not:
Involve a significant increase in the probability or consequences of an accident previously evaluated, 2.
Create the possibility of a new or different kind of accident from any accident previously evaluated, or 3.
Involve a significant reduction in a margin of safety.
Criterion 1 The proposed changes are administrative or editorial in nature.
The purpose is to correct errors in the T/S, or to make the T/S more consistent with plant design or operation.
No changes in physical design of the plant or changes in the manner in which the plant is operated willresult from these changes.
Therefore, the changes do not involve a
significant increase in the probability or consequences of an accident previously evaluated.
Criterio 2
The proposed changes are administrative or editorial in nature.
The purpose is to correct errors in the T/S, or to make the T/S more consistent with plant design or operation.
No changes in physical design of the plant or changes in the manner in which the plant is operated will result from these changes.
Therefore, the changes do not create the possibility of a new or different kind of accident from any previously analyzed.
Criterion 3 The proposed changes are administrative or editorial in nature.
The purpose is to correct errors in the T/S, or to make the T/S more consistent with plant design or operation.
No changes in physical design of the plant or changes in the manner in which the plant is operated willresult from these changes.
Therefore, the changes do not involve a significant reduction in a margin of safety.
'It s
p p
~
y 1
Attachment 1 to AEP:NRC:1137B Page 8
- Lastly, we note that the NRC has provided guidance concerning the determination of significant hazards consideration by providing examples (48 FR 14870) of amendments considered not likely to involve significant hazards consideration.
The first of these examples refers to changes that are administrative in nature:
for example, changes to achieve consistency throughout the T/S, correction of an error, or a change in nomenclature.
As discussed
- above, these changes all fitwithin this description.
- Thus, we conclude that the example cited is applicable and that the changes should not involve significant hazards consideration.
ATTACHMENT 2 TO AEP:NRC:1137B EXISTING TECHNICAL SPECIFICATION PAGES MARKED TO REFLECT PROPOSED CHANGES