Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005G528 + (Proposed Tech Specs Re Removal of Upper Head Injection Sys in ECCS)
- ML18065A491 + (Proposed Tech Specs Re Removal of cross-train Testing Requirements from LCO Action Statements)
- ML20046A240 + (Proposed Tech Specs Re Removal of cycle-specific Parameter Limits from Tech Specs)
- ML20062D285 + (Proposed Tech Specs Re Removal of cycle-specific Operating Limits)
- B13598, Proposed Tech Specs Re Removal of cycle-specific Parameter Limits + (Proposed Tech Specs Re Removal of cycle-specific Parameter Limits)
- ML20044A943 + (Proposed Tech Specs Re Renewal of License for 40-yr Period, W/Ge Test Reactor Facility in Safe Storage Decommissioning Mode)
- ML20077C570 + (Proposed Tech Specs Re Renewal of SG Tube Interim Plugging Criterim for Unit 1 Cycle 9)
- ML18150A139 + (Proposed Tech Specs Re Reorganization of QA Organization)
- ML20117L258 + (Proposed Tech Specs Re Replacement Page for Ltr)
- ML20236T514 + (Proposed Tech Specs Re Replacement SG Water Level Setpoint Differences)
- ML20077D307 + (Proposed Tech Specs Re Replacement TS Page 248a Concerning PORC Membership & Review Responsibilities)
- ML20043H074 + (Proposed Tech Specs Re Replacement of 1,300 Hydraulic Control Unit Isolation Boundaries W/Four Newly Installed Isolation Boundaries on Common CRD Headers)
- ML20073A689 + (Proposed Tech Specs Re Replacement of 125 Volt DC Vital Batteries Complying W/Tech Spec 4.8.2.1.2f Requirements)
- ML20206N313 + (Proposed Tech Specs Re Replacement of Nuclear Instrumentation Sys Source & Intermediate Range Channels & post-accident Neutron Flux Monitoring Sys)
- ML20247H681 + (Proposed Tech Specs Re Replacement of Organizational Charts W/More General Organizational Requirements to Provide Greater Flexibility to Implement Changes in Offsite & Onsite Organization Structure,Per Generic Ltr 88-06)
- ML20148H816 + (Proposed Tech Specs Re Replacement of Organization Charts in Tech Specs W/More General Organization Requirements)
- ML20101H610 + (Proposed Tech Specs Re Replacement of SGs)
- ML20095H472 + (Proposed Tech Specs Re Replacement of Selected Analog Leak Detection Sys Instruments W/Ge Numac Leak Detection Monitor)
- ML20113H622 + (Proposed Tech Specs Re Replacement of Std Fuel Assemblies W/Optimized Fuel Assemblies)
- ML20151M243 + (Proposed Tech Specs Re Replacement of a Limited Number of Fuel Rods W/Filler Rods)
- ML20086P656 + (Proposed Tech Specs Re Replacement of title-specific List of PORC Members W/More General Statement of Membership Requirements)
- ML20083R331 + (Proposed Tech Specs Re Reportable Events,Moderator Temp Coefficient,Fire Detection Instrumentation,Rcs,Eccs & Containment Vessel & Shield Bldg Structural Integrity)
- ML20073B538 + (Proposed Tech Specs Re Reporting Requirements for Radioactive Effluent Release Rept)
- ML20212C028 + (Proposed Tech Specs Re Reporting Requirements for Primary Coolant Sys Iodine Spikes)
- ML18095A214 + (Proposed Tech Specs Re Reporting Requirements for Reactor Trip Sys Response Time & Limiting Condition for Operation & Surveillance Requirements for RCS)
- ML20024G674 + (Proposed Tech Specs Re Reporting Requirements)
- ML20203B283 + (Proposed Tech Specs Re Reporting of Primary Coolant Iodine Spikes & Elimination of 800 H Per 12-month Period Cap for Exceeding Activity Limits)
- ML20107M057 + (Proposed Tech Specs Re Request for Enforcement Discretion)
- ML20084L454 + (Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors)
- ML20087J197 + (Proposed Tech Specs Re Required Operable Channels of Core Exit Thermocouples)
- ML20078G822 + (Proposed Tech Specs Re Required Vol of Trisodium Phosphate Dodecahydrate in Containment)
- ML20072C125 + (Proposed Tech Specs Re Requirement for Accelerated Testing of Div 1 DG)
- ML20063K757 + (Proposed Tech Specs Re Requirement to Perform Infrared Aerial Photography Every Other Yr)
- ML20154A428 + (Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys)
- ML18094B168 + (Proposed Tech Specs Re Requirements That Operations Manager Hold Senior Reactor Operator License)
- ML18005A761 + (Proposed Tech Specs Re Requirements for Manager of Operations to Hold Senior Reactor Operator License)
- ML20217B824 + (Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel)
- ML18064A761 + (Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests)
- ML20011E199 + (Proposed Tech Specs Re Requirements for Surveillance Intervals)
- ML18037A488 + (Proposed Tech Specs Re Requirements for Lab Sample Analysis of Charcoal Adsorbers to Reflect Latest ASTM Std)
- ML20134K377 + (Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions..)
- ML20150C428 + (Proposed Tech Specs Re Requirements for Radioactive Gaseous Effluent Monitoring Instrumentation)
- ML20207F355 + (Proposed Tech Specs Re Requirements for Analysis & Monitoring of Gaseous Radioactive Effluents)
- ML20063J844 + (Proposed Tech Specs Re Requirements in 10CFR20)
- ML20134M083 + (Proposed Tech Specs Re Requirements of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation)
- ML20134D304 + (Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging)
- ML20154C068 + (Proposed Tech Specs Re Resource Range Monitor Min Count Rate Requirements)
- ML17292A753 + (Proposed Tech Specs Re Response Time Testing Requirements)
- ML20065L260 + (Proposed Tech Specs Re Response Time for RTS & ESFAS Instrumentation)
- ML20108A972 + (Proposed Tech Specs Re Response to NRC Questions for Containment Airlock)
- ML20198G595 + (Proposed Tech Specs Re Response to NRC Reactor Sys Branch RAI Re AP600 TS)