Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236Y377 + (Proposed Tech Spec 4.6.1.2c.3,Section 3/4.6.1.2 Re Containment Sys & Containment Leakage)
- ML20004F377 + (Proposed Tech Spec 4.6.1.5 for Air Temp)
- ML20065K583 + (Proposed Tech Spec 4.6.1.6.1,changing Wording Re Containment Structural Integrity Surveillance)
- ML20106F947 + (Proposed Tech Spec 4.6.1.6.1,extending Period for Completion of Containment Vessel Tendon Surveillance by 6 Months)
- ML17219A386 + (Proposed Tech Spec 4.6.1.7.4 Requiring That Continuous Containment Purge Supply & Exhaust Isolation Valves Be Determined Operable Every 92 Days)
- ML18051B363 + (Proposed Tech Spec 4.6.1.d,providing Verification That at Least One Shutdown Cooling Pump & One HX in Operation at Least Once Per 12 H During Refueling)
- ML20215J630 + (Proposed Tech Spec 4.6.2.1.f,extending Testing Interval of MSIVs in Steam Line a Until 870712,on one-time-only Basis)
- ML20086A488 + (Proposed Tech Spec 4.6.2.1b Re Containment Spray Sys Performance Criteria)
- ML20211B870 + (Proposed Tech Spec 4.6.2.2.d,changing Containment Spray Sys Spray Additive Tank Flow Rate Surveillance Test Requirements)
- ML20101S518 + (Proposed Tech Spec 4.6.2.2.e,ensuring Adequate Piping Capacity to Deliver Required Sodium Hydroxide to Containment Spray Line)
- ML20211D622 + (Proposed Tech Spec 4.6.2.3 Re Surveillance Requirements for Containment Sys Concerning Drywell Air Lock)
- ML18038A624 + (Proposed Tech Spec 4.6.2a Re Instrumentation Initiating Scram)
- ML19312B998 + (Proposed Tech Spec 4.6.3 Re Annual Performance of Simulated Emergency Transfer of 4160 Volt Main Feeder Buses to Startup Transformer & to 4160 Volt Standby Buses)
- ML20080L794 + (Proposed Tech Spec 4.6.4.1.b & Table 3.3-9 Re Hydrogen Analyzer Calibr & Remote Shutdown Panel Instrumentation, Respectively)
- ML20079B003 + (Proposed Tech Spec 4.6.4.2.b.4 Re Hydrogen Recombiners)
- ML17289A405 + (Proposed Tech Spec 4.6.6.1.b.3 Re Primary Containment Atmosphere Control)
- B11984, Proposed Tech Spec 4.6.E.5,clarifying Functional Testing Requirements for Safety/Relief Valve Position Indication Sys + (Proposed Tech Spec 4.6.E.5,clarifying Functional Testing Requirements for Safety/Relief Valve Position Indication Sys)
- ML18047A381 + (Proposed Tech Spec 4.7 Re Emergency Power Sys Periodic Tests)
- ML20038B004 + (Proposed Tech Spec 4.7 Revision Re Primary Containment Airlock Test Requirements.Safety Evaluation Encl)
- ML20052A592 + (Proposed Tech Spec 4.7,plant Sys)
- ML18051B494 + (Proposed Tech Spec 4.7.1(c),revising Surveillance Frequency for Diesel Generators to Once Per Refueling Cycle)
- ML20063L694 + (Proposed Tech Spec 4.7.1.2.1.a,requiring Turbine & Motor Driven Pumps Be Tested Quarterly on Staggered Test Basis)
- ML20095D578 + (Proposed Tech Spec 4.7.1.2.2.b.1,deleting Words During Shutdown)
- ML20045C344 + (Proposed Tech Spec 4.7.1.2.a.2 Supporting Request to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig)
- ML18095A733 + (Proposed Tech Spec 4.7.1.5 & Table 2.2-5 Allowing Continued Use of 8 MSIV Stroke Time During 10th Fuel Cycle)
- ML20096A353 + (Proposed Tech Spec 4.7.10.b Re Snubber Visual Insp)
- ML18051B394 + (Proposed Tech Spec 4.7.2 Change,Revising Frequency of Periodic Station Battery Svc & Discharge Tests from 18- & 60-month Intervals,Respectively,Per SEP Topic VIII-3.A, Station Battery Capacity Test Requirements)
- ML17348A967 + (Proposed Tech Spec 4.7.2 Re Component Cooling Water Sys Surveillance Requirements)
- ML20062K424 + (Proposed Tech Spec 4.7.3.c.2 & Bases 3/4.7.3,revising 18-month Surveillance Requirements to Account for Flow Differences Between Test Flow Path & Normal Flow Path)
- ML20091N907 + (Proposed Tech Spec 4.7.5-1 Re Snubber Visual Insp Interval)
- ML20245J696 + (Proposed Tech Spec 4.7.5.b,revising Surveillance Requirements on One Time Basis by Establishing Next Visual Insp Interval for Hydraulic Snubbers as 18 Months +/-25%)
- ML20234D759 + (Proposed Tech Spec 4.7.6 Changing Control Room Area Ventilation Sys Surveillance Requirements to Extend Carbon Adsorber Sampling Frequency from 720 H to 1,440 H)
- ML20043G256 + (Proposed Tech Spec 4.7.6 Re Control Room Area Ventilation Sys)
- ML20077Q505 + (Proposed Tech Spec 4.7.6 Re Min Allowed Flow Through Cravs Filter Unit)
- B12820, Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage + (Proposed Tech Spec 4.7.6.1.e.3 Re Test Method for Control Room Air in-leakage)
- ML20034B858 + (Proposed Tech Spec 4.7.7,requiring That Lab Test of Carbon Samples from Auxiliary Bldg Filtered Exhaust Sys Be Tested at 95% Relative Humidity & 30 C,For Methyl Iodide Penetration of 0.71%)
- ML18094A410 + (Proposed Tech Spec 4.7.9.e.1,deleting Requirement That Measured Drag Force of Mechanical Snubber Should Not Increase by More than 50% from Previous Test Result)
- JPN-93-044, Proposed Tech Spec 4.7.A.2.f Re Containment Leak Rate Testing + (Proposed Tech Spec 4.7.A.2.f Re Containment Leak Rate Testing)
- ML20029C025 + (Proposed Tech Spec 4.8.1.1.2 Reflecting Extension of Diesel Generator Surveillance Interval Until 911031)
- ML20198B938 + (Proposed Tech Spec 4.8.1.1.2.D.1 Re one-time Extension of Surveillance Interval for Diesel Generators)
- ST-HL-AE-2362, Proposed Tech Spec 4.8.1.1.2.a.2 Correcting Min Rpm Speed Requirement for Diesel Generator & Changing Frequency Requirements to Be Consistent W/Min Rpm Requirement + (Proposed Tech Spec 4.8.1.1.2.a.2 Correcting Min Rpm Speed Requirement for Diesel Generator & Changing Frequency Requirements to Be Consistent W/Min Rpm Requirement)
- ML20082R696 + (Proposed Tech Spec 4.8.1.1.2.d.1,allowing Removal of Dedicated Class 1E Emergency Power Source from Shutdown Unit for Seven Days)
- ML20096A401 + (Proposed Tech Spec 4.8.1.1.2.e Re DG 18-month Surveillance Mode Restrictions)
- ML20086A625 + (Proposed Tech Spec 4.8.1.1.2d.1(b) Re Diesel Fuel Oil Kinematic Viscosity Test Temp)
- ML20196C905 + (Proposed Tech Spec 4.8.1.1.3, Repts, Revising Wording to Allow Reporting to Be on Per Diesel Generator Basis & Table 4.8.1.1.2-1, Diesel Generator Test Schedule, Clarifying Test Frequency & Determination of Number of Failures)
- ML20199B290 + (Proposed Tech Spec 4.8.1A,incorporating Proposed Amend 148, Permitting Sys Testing of Auxiliary Feedwater Pump Under Conditions of Power Operation or Plant Shutdown)
- ML17286A690 + (Proposed Tech Spec 4.8.2.1.d.2,requesting Battery Load Profiles of Surveillance Requirement Be Reloacted to FSAR)
- ML20206U599 + (Proposed Tech Spec 4.8.4.3,revising Tests for Operability of motor-operated Valves Thermal Overload Protection)
- ML20082T470 + (Proposed Tech Spec 4.8.4.3a,amending Electrical Power Sys, Reactor Protection Sys Electrical Power Monitoring, Surveillance Requirements)
- ML20083D356 + (Proposed Tech Spec 4.8.H.2.b(2) Re Differential Temp Criteria for Control Room Emergency Filtration Sys Header)
- ML20034B848 + (Proposed Tech Spec 4.9.4.2,requiring That Lab Test of Carbon Samples from Containment Purge Sys Be Tested,Per ASTM D3803-86,Test Method a W/Exception That Test Will Be Performed at 70% Instead of 95% Relative Humidity)