MONTHYEARML20195C3711985-10-0909 October 1985 Change 0 to B&W Spent Fuel Receipt,Storage & Shipping W/Nli Cask. Summary of TN-8L Cask Procedure Encl Project stage: Other ML20140F8021986-03-20020 March 1986 Application for Amend to Licenses NPF-9 & NPF-17,authorizing Use of TN-8 & TN-8L Casks for Receipt of Irradiated Fuel. Justification Encl.Fee Paid Project stage: Request ML20195C3861986-05-0909 May 1986 TN-8L Draft Unloading Procedure for McGuire Station Project stage: Draft Other ML20198H4311986-05-22022 May 1986 Notice of Consideration of Issuance of Amends to Licenses NPF-9 & NPF-17 Re Use of Transnuclear,Inc multi-element Spent Fuel Shipping Casks TN-8 or TN-8L to Receive Irradiated Fuel Project stage: Other ML20195C3521986-05-23023 May 1986 Responds to 860512 & 15 Requests for Addl Info Re 860320 Application for Amends to Licenses NPF-9 & NPF-17,permitting Use of multi-element Spent Fuel Casks.Summary of Procedure OP/O/A/6550/13 Encl.W/Two Oversize Drawings Project stage: Request ML20195E2821986-05-28028 May 1986 Proposed Tech Spec 3/4.6.2.3,deleting Drywell Air Lock Seal Pressure Instrumentation 31-day Channel Functional Test from Surveillance Requirement 4.6.2.3.d.1 Project stage: Other ML20202J7721986-07-10010 July 1986 Forwards Addl Info to Support 860320 Application for Amends to Licenses NPF-9 & NPF-17,authorizing Use of Multielement Spent Fuel Casks TN-8 & TN-81 for Receipt of Irradiated Oconee Fuel.Timely Approval Requested Project stage: Request ML20212D0061986-08-0505 August 1986 Suppls 860320 Application for Amends to Licenses NPF-9 & NPF-17,permitting Use of multi-element TN-8 & TN-8L Spent Fuel Casks for Receipt of Irradiated Fuel.Info Re Environ Impacts Per 10CFR51.52 Encl Project stage: Request ML20212N0061986-08-22022 August 1986 Environ Assessment & Finding of No Significant Impact Supporting 860320 Application for Amends to Licenses NPF-9 & NPF-17,authorizing Use of Transnuclear,Inc Models TN-8 & TN-8L Shipping Casks for Receipt of Irradiated Fuel Project stage: Other ML20213G7591986-11-11011 November 1986 Application for Amend to License NPF-29,correcting Reactor Pressure Vessel pressure-temp Graph (Figure 3.4.6.1-1), Clarifying Drywell Airlock & Changing Portion of Surveillance Requirement 4.6.2.3 Re Airlock Seal Sys Project stage: Request AECM-86-0351, Forwards Application for Amend to License NPF-29,correcting Reactor Pressure Vessel pressure-temp Graph,Figure 3.4.6.1-1,clarifying Drywell Airlock & Changing Portion of Surveillance Requirement 4.6.2.3.Fee Paid1986-11-11011 November 1986 Forwards Application for Amend to License NPF-29,correcting Reactor Pressure Vessel pressure-temp Graph,Figure 3.4.6.1-1,clarifying Drywell Airlock & Changing Portion of Surveillance Requirement 4.6.2.3.Fee Paid Project stage: Request ML20213G7631986-11-11011 November 1986 Proposed Changes to Tech Spec Figure 3.4.6.1-1 Re Min Reactor Pressure Vessel Metal Temp Vs Reactor Vessel Pressure & Spec 3.6.2.3 Re Drywell Airlocks Project stage: Request ML20212J3471987-01-20020 January 1987 Proposed Tech Spec 3/4 4.6 Re Reactor Pressure Vessel pressure-temp Curve,Deleting Ref to NEDO-21778-A Project stage: Other ML20212J3341987-01-20020 January 1987 Supplemental Application for Amend to License NPF-29, Revising Tech Spec 3/4 4.6 Re Reactor Pressure Vessel pressure-temp Curve to Delete Ref to NEDO-21778-A Project stage: Supplement ML20211D6221987-02-13013 February 1987 Proposed Tech Spec 4.6.2.3 Re Surveillance Requirements for Containment Sys Concerning Drywell Air Lock Project stage: Other AECM-87-0037, Revises 861111 Application for Amend to License NPF-29, Changing Tech Spec 4.6.2.3.d.1 Re Drywell Airlock Seal Pressure Instrumentation Channel Functional Test Submitted on 860528,per Discussion W/Nrc.Proposed Tech Spec Page Encl1987-02-13013 February 1987 Revises 861111 Application for Amend to License NPF-29, Changing Tech Spec 4.6.2.3.d.1 Re Drywell Airlock Seal Pressure Instrumentation Channel Functional Test Submitted on 860528,per Discussion W/Nrc.Proposed Tech Spec Page Encl Project stage: Request ML20205R7731987-03-31031 March 1987 Safety Evaluation Supporting Amend 32 to License NPF-29 Project stage: Approval ML20205R7501987-03-31031 March 1987 Amend 32 to License NPF-29,changing Tech Specs & Associated Bases for Reactor Pressure Vessel Pressure & Temp Limits to Be Consistent W/Limits Provided by GE for NSSS Project stage: Other ML20205Q6081987-03-31031 March 1987 Safety Evaluation Supporting Amend 31 to License NPF-29 Project stage: Approval ML20205Q6041987-03-31031 March 1987 Amend 31 to License NPF-29,revising Tech Specs by Changing Wording to Indicate Only One Drywell Airlock & Rearranging Action Statement a to Clarify That All Actions in Statement Parts of Same Action Project stage: Approval ML20206B6631987-04-0303 April 1987 Errata to Amend 32 to License NPF-32,correcting Tech Spec Page B 3/4 4-3 Project stage: Other 1986-05-09
[Table View] |
Text
W CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS l
TAe 4.6.2.3 -E-eeh-drywell air lock shall be demonstrated OPERABLE:
Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> # af ter each closing, except when the air lock is being a.
used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> #, by verifying seal leakage rate less than or equal to 2 scf per hour when the gap between the door seals is pressurized to P,,11.5 psig.
b.
By conducting an overall air lock leakage test at P,11.5 psig a
and verifying that the overall air lock leakage rate is within its
- .ch. coro sguYoosN' Q** f'S
"' $ S PW**3 S **
1.
At Ica;t...ce per C,;,;rtL,
2.
Prior to establishing DRYWELL INTEGRITY when maintenance has been performed on the air lock that could affect the air lock sealing capability.
c.
At least once per months by verifying that only one door in l
air lock can be opened at a time.
By verifying each airlock door inflatable seal sy' stem OPERABLE by:
d.
1.
Demonstrating each of the two inflatable seal pressure instrumentation channels per airlock door OPERABLE by performance of a:
18 menTLs a)
CHANNEL FUNCTIONAL TEST at least once per 21 d y;, and l
b)
CHANNEL CALIBRATION at least once per 18 months, with a low pressure setpoint of > 60 psig.
2.
At least once per 7 days verifying seal air flask pressure to be greater than or equal to 90 psig.
3.
At least once per 18 months, conducting a seal pneumatic system leak test and verifying that system pressure does not decay more than 2 psig from 90 psig within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
- The provisions of Specification 4.0.2 are not applicable.