i ELECTRICAL p0HER SYSTEMS SHUTDOWN LIMITING CONDITION FOR OPERATLON 3.8.1.2 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
a.
One circuit between the offsite transmisFion network and the onsite Class IE distribution system, and b.
One diesel generator with:
1.
A day fuel tank containing a minimum volume of 375 gallons of fuel, 2.
A fuel storage system containing a minimum volume of 18,250 gallons of fuel, and 3.
A fuel transfer pump.
l APPLICABILITY: MODES 5 and 6.
ACTION:
a) With less than the above minimum required A.C. electrical power sources OpERABLEffer reasons other lharr the performance of Surveillance RepdrernenF 4.6.I.I.2.d.) c>n diesel generator No.12:
1Ar.
Immediately* suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy leads over irradiated fuel, and 2 #.
Immediately initiate corrective actions to restore the minimum A.C. electrical power sources to OPERABLE status, and 34.
Establish containment penetration closure as identified in cification 3.9.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
l SURVEILLANCE RE0VIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the S'Jrveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement 4.8.1.1.2a.5.
1 Performance of Action a. shall not preclude completion of actions to establish a safe conservative position.
CALVERT CLIFFS - UNIT 1 3/4 8-5 Amendnent No.155
l M.TRICAL P0BER SYSTEMS A.C. DISTRIBUTION - SHUTDOWN LIMITlHG CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE and energized from sources of power other than a diesel generator but aligned to an OPERABLE diesel generator:
1 - 4160 volt Emergency Bus 1-430 volt Emergency Bus 2-120 volt A.C. Vital Busses APPLICABillTY:
MODES 5 and 6 a
ACTION:
g) With less }for han the above complement of A.C. busses OPERABLE and energizedt reascns c'?he< lhan the pe rfcr m a " e of k'&!lawe fe p;ye me n 4
- 4. 6 Ll. 2-cl l e n cUc.sel ghnenfor N; ff.
Immediately* suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel, until the minimum required A.C. bustes ree restored to OPERABLE and energized status, and 25 Immediately initiate corrective actions to restore the minraum A.C. electrical busses to OPERABLE and energized status, and 37 Establish containment penetration closure as identified in Specification 3.9.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
CINMerAJ SURVElllANCE REOUTREMENTS 4.8.2.2 The specified A.C. busses shall be determined OPERABLE and energized from A.C. sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated power availability.
Performance of Action a. shall not preclude completion of actions to establish a safe conservative position.
CALVERT CLIFFS - UNIT 1 3/4 8-7 Amendment No. 155 e__-__-___________--_-_
4 I
4 3/4.8 ELECTRICAL POWER SYSTEMS BASES The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility. The minimum specified indepen-dent and redundant A.C. and D.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.
The ACTION requirements specified for the levels of degradation of the power sources provide restriction upon continued facility operation cont.ensurate with the level of degradation.
The OPERABILITY of the power sources are consistent with the initial conditien assumptions of the accident analyses and are based uoan maintaining at least one of each of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of the other onsite A.C. source.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that 1) the facility can be maintained in the shutdown or refueling condition for extended time periods and 2) sufficient instrumentation and control capability is available for monitoring and maintaining the facility status.
[ INSERT BJ p
1 CALVERT CLIFFS - UNIT 1 B 3/4 8-1
a INSERT A:
b)
With less than the above minimum required A.C. electrical power sources OPERABLE for the perforgance of Surveillance Requirement 4.8.1.1.2.d.1 on No.12 cmergency diesel generator:
1)
Verify either two 500 kV offsite power circuits or a 500 kV offsite power circuit and the 69 kV SMECO offsite power circuit are available and capable of being used. This availability shall be verified prior to removing the OPERABLE emergency diesel generators and once per shift thereafter, 2)
Suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated
- fuel,
.4 3)
IIave established containment penetration closure as identified in Specification 3.9.4, 4)
An emergency diesel generator shall be OPERABLE and aligned to provide power to the emercency busses within seven days.
5)
Within two weeks prior to the planned unavailability of an OPERABLE emergency diesel generator, a temporary diesel generator shall be demonstrated available.
6)
A temporary diesel generator shall be demonstrated available by starting it at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
7)
If ACTIONS b) I through b) 6 are not met, restore compliance with the ACTIONS within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or restore an OPERABLE emergency diesel generator within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
The provisions of Action b) are no longer applicable following the installation of two additional emergency diesel generators.
l
4 4
INSERT B:
The ACTION requirements for LCO 3.S.I.2 and 3.8.2.2 are associated with the performance of Surveillance 4.S 1.1.2.d.1 on No.12 EDG with Unit 1 shutdown and Unit 2 at power. This requires that No.11 EDG be aligned to Unit 2. The actions speciDed reduce the probability of a loss of offsite power by requiring the availability of two offsite power circuits. A temporary dicsci is available which has sutGeient capacity to carry all required shutdown loads. This ACI'lON only applies to the performance of Surveillance 4.8.1.1.2.d 1 on No.12 EDO.
Performance of Surveillance 4.8.1.1.2.d.1 an No.11 EDG would not violate the LCOs for 3.8.1.2 and 3.8.2.2 because the No.12 EDG may be aligned to either unit.
et
i f
i
.}
i ATTACHMENT (2)
!o i
l UNIT 2 REVISED
.i i
TECHNICAL SPECIFICATION PAGES i;
3/4 8-5
'3/4 8-7-.
l E
(
BASES 3/4 8-1 j
I h
5
- . 6 E-i h
t I
+
)
F b
t a
,y...
ELECTRICAL POWER' SYSTEMS f
}jUTDCA
.l LIMITING CONDIT10W FOR OPERATION-l t
3.8.1.2 As a minimum, the' following A.C,_ electrical power sources shall be OPERABLE:
i
.]
a.
One circuit between the offsite transmission network and the onsite Class IE distribution system, and b.
One diesel generator with:
1.
A day fuel tank containing a minimum volume of 375 gallons k
of fuel, 2.
A fuel storage system containing a minimum volume'of
~
a 18,250 gallons of fuel, and l
?
3.
A fuel transfer pump.
i
{
APPLICABILITY: MODES 5 and 6.
ACTION:
"a)With less than the above minimum r9 quired A.C. electrical power sources 1
OPERABLEJOcr rea.mns ciher ihn N Pe<kmwna et - keveilla na Require med 4. 6. l.l. 2. c. ! is cliue i 4e neMo. 12 :
1 l
14.
Immediately* suspend all operations involving CORE ALTERATIONS, i
positive reactivity changes, movement of irradiated fuel and
[
movement of heavy loads over irradiated fuel, and j
2A.
Immediately initiate corrective actions to restore the minimum l
A.C. electrical power sources to OPERABLE status, and j
t 34 Establish _ containment penetration closure as identified in ecification 3.9,4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
l:
LURVEILLANCE REOUIREMENTS J
4,8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the-performance of each of the Surveillance -
i E
Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for requirement L
4.8.1.1.2a.5.
I I
i i
t Performance of Action a. shall not preclude completion of actions to s2tablish a safe-conservative position.
}
l f
I h
CALVERT CLIFFS - UNIT 2 3/4 8-5 Amendment No. 135
-j i
ELECTRICAL POUER SYSTEMS 6.C. DISTRIBUTION - SHUTOOWN LIMITING CONDITION FOR OPERATION 3.8.2.2 As a minimum, the following A.C. electrical busses shall be OPERABLE and energized from sources of power other that a diesel generator but aligned to an OPERABLE diescl generator 1 - 4160 volt Emergency Bus I-480 volt Emergency Bus
[
2-120 volt A.C. Vital Busses f
APPLICABillTY: MODES 5 and 6 ACTION:
I a)With less that the above complement gf A.C. busses OPERABLE and energizedflor reaseas oihu &hu b1c perbemaxe d Saarrum
?
kwire med 4,E. I. I. 2. d. ) on d:eul geneo4ce /2 :
- J A.
Immediately* suspend all operations involving CORE ALTERATIONS, positive reactivity char.ges, movement of irradiated fuel and movement of heavy loads over irradiated fuel, until the minimum required A.C. busses are restored to OPERABLE and energized status, and 1
2#,
immediately initiate corrective actions to restore the minimum A.C. electrical busses to OPERABLE and energized status, and 7,c.
Establish containment penetration closure as identified in pecification 3.9.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
SURVEILL ANCE RE0V_LREMENTS 4.8.2.2 The specified A.C. busses shall be determined OPERABLE and energized from A.C. sources other than the diesel generators at least once per 7 days by verifying correct breaker alignment and indicated power availability.
t l
t Performance of Action a. shall not preclude completion of actions to establish a safe conservative position.
l l
l l
CALVERT CLIFFS - UNIT 2 3/4 8-7 Amendment No.
135 b
i
3/4.8 ELECTRICAL POWER SYSTUS 3ASES The OPERASILITY of the A.C. and 0.C. pcwer_ sources and asscciated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for 1) the safe shutdown of the facility and 2) the mitigation and control of accident conditions within the facility.
The minimum specified indepen-dent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Acpendix "A" to 10 CFR 50.
The ACTION requirements specified for the levels cf degradation of the pcwer sources provide restriction upon continued facility operation commensurate with the level of degradation.
The CPERABILITY of the ;cwer sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least one of each cf the onsite A.C. and D.C. pcwcr sources anc associated distributien systems i
OPERABLE during accident conditions coincident with an assumed loss of
)
offsite power and single failure of tne other onsite A.C. source.
The OPERABILITY of the minimum specified A.C. and 0.C. pcwer sources-and associated distribution systems during shutdown anc refueling ensures that 1) the facility can be maintained in the shutdown or refueling f
condition for extended time periods and 2) sufficient instrumentation l
and control capability is available for monitoring and maintaining the i
facility status.
L1~iMSERT 02 t
t l
5 I
i l
AUG 1 3 EM l
CaLVERT CLIFFS - UNIT 2 3 3/4 8-1 L
i L
i
.~.
INSERT C:
b)
' With less than the above minimum required A.C. electrical power sources OPERABLE for the perforgance of Surveillance Requirement 4.8.1.1.2.d.1 on No.12 emergency diesel generator:
1)
Verify either two 500 kV offsite power circuits or a 500 kV offsite power circuit and the 69 kV SMECO offsite power circuit are available and capable of being used. This availability shall be verified prior to removing the OPERABLE emergency diesel generators and once per shift thereafter, 2)
Suspend all operations invohing CORE ALTERATIONS, positive reactivity changes, movement ofirradiated fuel and movement of beasy loads over irradiated
- fuel,
.4 3)
Have established containment penetration closure as identified in Specification 3.9.4, 4)
An emergency diesel generator shall be OPERABLE and aligned to provide power
- to the emergency busses within seven days.
5)
Within _two weeks prior to the planned unavailability of an OPERABLE emergency diesel generator, a temporary diesel generator shall be demonstrated available.
6)
A temporary diesel generator shall be demonstrated available by starting it at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
7)
If ACTIONS b) I through b) 6 are not met, restore compliance with the ACTIONS within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or restore an OPERABLE emergency diesel generator within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
l l
The provisions of Action b) are no longer applicable following the installation of two additional emergency diesel generators.
j L
- INSERT D:
The ACTION requirements for LCO 3.8.1.2 and 3.8.2.2 are associated with the performance
- of Suneillance 4.8.1.1.2.d.1 on No.-12 EDG with Unit 2 shutdown and Unit 1.at power. This requires that No. 21 EDO be aligned to Unit 1. The actions specified reduce the probability of a loss of offsite power by requiring the availability of two offsite power circuits. - A temporary dicsci is available which has sumcient capacity to carry all required shutdown loads. This ACTION only applies to' the performance of Surveillance 4.8.1.1.2.d.1 on No.12 EDO.
Performance of Surveillance 4.8.1.1.2.d.1 on No. 21 EDO would not violate the LCOs for 3.8.1.2 and 3.8.2.2 because the No.12 EDG may be aligned to either unit.
1 l
i l
=
r 9
A1TACil51ENT (3)
EXCERI'T FROh! ENIERGENCY RI'f t'ONSE PIAN IN11"Eh1ENTING l'ROCEDURE 3.0 fi r
s 1
i t
v k
I 5
P i
I
~
t
_ _ _. - - _.... _,. -. _ _ ~ - _ _ _ _. -...
= _.
ERPIP 3.0 Rev. 15 1
EEATHER f
- ti911 -
I Assess severe weather relative to its effect on offsite power availability.
Civen-that severe weather increases the likelihood of loss of offsite power then both Units must be in hot standby two hours before conditions are sufficient to threaten offsite power availability, p
Veather conditions are relative to the site proper, SMECO AND the 500 KV tie line right of way (CCNPP to Vaugh Chapel).
l Site and SMECO conditions are based on site meteorological instruments (SPD
[
10 SPD 60). Tia line right of way conditions are based on reports from Electric System Operations (ES0) and/or National Vesther Service, BVI f
Airport.
(see ERPIP A.2 for phone number).
.4 l
Conditions presume steadily worsenin5 weather therefore initiate actions in k
numbered order.
Action completion is not a prerequisite to succeeding
)
act'ons.
l f
CONDITION ACTION 1.
Hurricane / Tornado Watch 1.1 CONTACT ESO every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for weather i
updates.
~
i 1.2 ENERGIZE 2313KV Service Bus per OI 27E.
i 1.3 SECURE plant tests not associated with
)
surveillance requirements.
i 1.4 KAXIMIZE CST inventories.
1.5 IF required by T.S. considering operating mode THEN EXPEDITE maintenance and/or L
surveillance testing to return the f
following to service:
- a. AFV systems
- b. Atmospheric dump valves c.
Station batteries
- d. Battery chargers e.
Diesel generators 1.6 RALT fuel handling operations and secure all fuel.
2.
Hurricane / Tornado Warning 2.1 INSPECT site for, and remove / secure 5
potential missile hatards, 2.2 SHUT intake watertight doors (IS-1, 15 2 &
IS 3) and hatches.
f 2.3 RECALL personnel, per Attachment 13.
f 2.4 REVIEW EOP-7, Station Blackout.
2.5 For Hurricane Warninr Oniv:
3 START, LOAD, then SHUIDDVN each diesel generator (one at a time) per 01 21 (Non-mergency Start).
3.
Sustained wind >35 mph 3.1 REDUCE power to 300 MUa on operating Units.
4 (15.9 mps) AND predicted 3.2 RECALL personnel via "Quickcall" automated-i notification system (event code 50) or
>70 mph (31.8 mps) radio pager (ID codes 3000 and 3100) in accordance with Attachment 2.
t 4 Sustained wind >45 mph 4
PLACE operatin OP-3 and OP-4.g Units in Hot Standby per-(20.5 mps) AND predicted
>75 mph (34.1 mps) 5.
Vind >75 mph (34.1 mps) 5.
C0 To page 14 and evaluate conditions against bergency Action Level (EAL) criteria.
12
)
}
i ATTACilMENT (4) c
- t I'LAN DRAWING REI'RESENTATIVE OF Tile INSTALLATION OF Tile TEMPORARY DIEFEL GENERATO3
?
I t
.4 r
t t
1 P
0 t
t f
I l
5 5
h l
D 1
~ ~
5 l
h i
n 4
1 f
r
g 2
a M
D N
~~
8 a 5 m.
u 1a s
o
- -- - g f*
y g
Y te Em2a TK Wg 00 ChW Za NAC l
umm m
c m l
9 Ey N*EDff o E
f
- r -* _ zK--.
o I
u cu tn D-
% p[d h
-[ '
a ',
e--
j i
e, y
r) sl d
ij[
l 1
,O. A c
u J
I 1
ft h
Q i- - - - j Dw I? r i
o z-
@l i.
,r x a
A aw a
L___J m
4 U
? 'd Y
2 a
ge
@ I.
239
- 82 i
8 olM hm M u-F P
L f
Q o
r-------
1 p
l' 38 i
i l-y.a l
a s
3 E
,NN 5
l I
l
,;, _a
_a i
e r
i i
Q, t r _;
I w
w i
i m
z a i
a e I
b b
i a
s eI sx I
m I
a -
g, s 'N N
- ~,
l a
Y
)
j am
.I
/
w ro s i
/
M va,l o w c,' L
\\
6 SE Ik 1
9
[
v o
x l
l 2
a a
d b
l 5
l N k
\\
a 2
o o
a I
m cu W
d
\\
M l
o b
I b
/
N
\\
z v
a
.