Proposed Tech Spec 4.8.1.1.2.D.1 Re one-time Extension of Surveillance Interval for Diesel Generators
ML20198B938
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/17/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20198B934 List:
References
NUDOCS 9106270136
Download: ML20198B938 (2)


Text

,,,

I a

ENCLOSURF j i

BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 j

NRC DOCKET NO. 50 324 OPERATING LICENSE NO, DPR-62 REQUEST FOR LICENSE AMENDMENT ONE T7.ME EXTENSION OF DIESEL GENERATOR SURVEILLANCE INTERVAL j

TECilNICAL SPECIFICATION 4.8.1.1.2.D.1 TECHNTCAL SPECIFICATION PAGES - UNIT 2 4

I i

j i

i i

i j

(

i i

i 9106270136 910617 PDR ADOCK O'50003.24 l

P PDR 1.-,,...

- -. - -. - -. ~.,. ~.

_._____._m 2LECTRICAL p0WER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STACCERED TEST BASIS by:

1.

  • Verifying the fuel level in the engine mounted fuel tank, 2.

Verifying the fuel level in the day fuel tank, 3.

Verifying the fuel transfer pump can be started and transfers fuel from the day tank to the engine mounted tank, 4.

Verifying the diesel atarts and accelerates to at least 514 rpm ir. lesa than or equal to 10 seconds,*

5.

Verifying the generator is synchronized, loaded to greater than i

i or equal to 1750 kw, and operates for greater than or equal to 15 minutes, and 6.

Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.

b.

At least once per 31 days by verifying the fuel level in the plant fuel storage tank.

c.

At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTH-D270-65, is within the acceptable limits specified in Table 1 of ASTH-D975-74 when checked for viscosit y, water and sediment, d.

At least once per 18 months during shutdown by:

1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufaggurer's recommendations for this class of standby service, l

2.

Verifying the generator capability to reject a load equal to one core spray pump without tripping, The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days-in these surveillance tests. All other engine starts for the purpose of this surveillance testing may be preceded by a manually initiated engine prelube period and/or other warmup procedures recommended by the nanufacturer so that mechar.ical stress and wear on the diesel engine is minimized.

For Cycle 9 only, the surveillance interval for Technical Specification 4.8.1.1.2.d.1 may be extended until November 21, 1991.

BRUNSWICK - UNIT 2 3/4 8-4 Amendment No.