ML17286A690

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 4.8.2.1.d.2,requesting Battery Load Profiles of Surveillance Requirement Be Reloacted to FSAR
ML17286A690
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/04/1991
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17286A689 List:
References
NUDOCS 9104150144
Download: ML17286A690 (4)


Text

~ l.ONIQLLED COpY 0

ELECTRICAL POWER SYSTEMS

'~~~? SURVEILLANCE RE UIREMENTS Continued

d. At least once per 18 months, during shutdown, by verifying that either:
1. The battery capacity is adequate to supply and maintain in OPERABLE status all of the actual emergency loads for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for Divisions 1, 2 and 3 when the battery is subjected>tg a~

battery; service test, or ouA los<- o( - cooLo~f a.cccckr 0 (I OCA)

2. The battery capacity is adequate to upply a dummy load of the Z;P;o<c following profile (Minimum amperage) while maintaining the g,~<,l .JL:<

battery terminal voltage greater than or equal to 21 volts for <t. p;.~

the 124-volt battery, 105 volts for the 125-volt battery, and 210 volts for the 250-volt battery, and 105 volts for the 125-volt Div. 3 battery. rPo(

Q L.M k 4 Fsge.)

NN SEMND~C8ND~TNUTES~THUT~TN 0"6 6"15 15-60 1-2 2"60 60- 119-120 BO-lA/-1B (i24V/Div 1) 24 24 24 24 BO-2A/"2B (124V/Div 2) 24 4 24 24 24 24 Bl-1 (125V/DIV 1) 570 26 26 180 180 180 276 Bl"2 (125V/DIV 2) 400 230 185 185 185 241 B2-1 (250V/DIV 1) 1320 520 05 480 444 574 HPCS DUTY CYCLE CONDS SECONDS SECONDS 0"13 13-20 20-60

e. At least once per 60 months during shutdown by verifying that the battery capacity is at least 80X (83.4X for the 250 Volt battery) of the manufacturer's rating when subjected to a performance discharge test. At this once per 60-month interval, this performance discharge test may be performed in lieu of the battery service test.
f. At least once per 18 months during shutdown performance discharge tests of battery capacity shall be given to any battery that shows signs of degradation or has reached 85K of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10K of rated capacity from its average on previous performance tests, or is below 90K (93.4X for the 250 Volt battery) of the manufacturer's rating.

WASHINGTON NUCLEAR " UNIT 2 3/4 8-13 Amendment No.

9i04i50144 9i0404 05000397 PDR ADOCK PEiR

0 g

E l' w t <<l~

W ~ a ~ 1 ~ hy

~>

I l

TABLE 8.3-7 BATTERY LOAD PROFILES UTILIZED TO VERIFY OPERABILITY PER TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.8.2.1.d. 2 BATTERY (VOLTS/DIV) SECONDS SECONDS SECONDS MINUTES MINUTES MINUTES MINUTES 0-6 6-15 15-60 1-2 2-60 60-119 119-120 BO-lA/-1B (+24V/Div 1) 24 24 24 24 24 BO-2A/-2B (+24V/Div 2) 24 24 24 24 24 Bl-1 (125V/Div 1) 570 260 260 180 180 180 276 B1-2 (125V/Div 2) 400 230 230 185 185 185 241 B2-1 (250V/Div 1) 1320 1320 520 505 480 444 574 HPCS DUTY CYCLE SECONDS SECONDS SECONDS 0-13 13-20 20-60 Bl-HPCS (125V/Div 3) 70.3 75.6 15.6 15.6 15.6 16.0 16.0 8.3-82 Attachment 2

0 (t e

~ ~ J,