Text

. _ _

j

' CONTAINMENT SYSTEMS

{

SURVEILLANCE REQUIREMENTS (Continued) 1.

Confirms the accuracy of the test by verifying that the differ-ence between the supplemental data and the Type A test data is within 0.25 L,.

The formula to be used is:

i

[L, + L,, - 0.25 L,] 1 Lc I El

  • L

+ 0.25 L,] where L

=

o as e

j supplemental test result; L, = superimposed leakage; L,, =

j measured Type A leakage.

2.

Has duration sufficient to establish accurately the change in leakage rate between the Type A test and the supplemental test.

j 3.

Requires the quantity of gas injected into the primary contain-ment or bled from the primary containment during the supple-mental test to be between 0.75 L,and 1.25 L,.

d.

Type B and C tests shall be conducted with gas at P, 11.31 psig*,

l at intervals no greater than 24 months except for tlsts involving:

i

(

1.

Air locks, j

2.

Main steam line isolation valves, j

3.

Valves pressurized with fluid from a seal system, f

4.

All containment isolation valves in hydrostatically tested lines-j.

per Table 3.6.4-1 which penetrate (the primary containment, and l

5.

Purge supply and exhaust isolation valves with resilient material seals.

e.

Air locks shall be tested and demonstrated OPERABLE per Surveillance l

Requirement 4.6.1.3.

L f.

Main steam line isolation valves shall be leak tested at least once per 18 months."

f g.

Leakage from isolation valves that are sealed with fluid from a seal

~

system may be excluded, subject to the provisions of Appendix J of 10 CFR 50 Section III.C.3, when determining the combined leakage rate provided the seal system and valves are pressurized to at least maintain,12.44psig,andtheseal'systemcapacityisadequateto 1.10 P i

system pressure for at least 30 days.

h.

All containment isolation valves in hydrostatically tested lines per Table 3.6.4-1 which penetrate the primary containment shall be leak i

{

tested at least once per 18 months.

1 i.

Purge supply and exhaust isolation valves with resilient material 1

seals shall be tested and demonstrated OPERA 8LE per Surveillance j.

Requirements 4.6.1.8.3. and 4.6.1.8.4.

l j.

The provisions of Specification 4.0.2 are not applicable to i

Specifications 4.6.1.2.a, 4.6.1.2.b, 4.6.1.2.c, and 4.6.1.2.d.

l l

"Unless a hydrostatic test is required per Table 3.6.4-1.

kk Euy',t 6',. valves teat-foazd M t eal-fo28H, who'e h ci,at// Le /cak l.

f**s t estfn'or k 5/y /2,/987 TAN en y h*e., y le e s o., T ly o e, s 927*

PERRY - UNIT 1 3/4 6-5 a

j-8705080173 870504

~

j DR ADOCK 05000440 j

PDR E__.-~,