' CONTAINMENT SYSTEMS
{
SURVEILLANCE REQUIREMENTS (Continued) 1.
Confirms the accuracy of the test by verifying that the differ-ence between the supplemental data and the Type A test data is within 0.25 L,.
The formula to be used is:
i
[L, + L,, - 0.25 L,] 1 Lc I El
- L
+ 0.25 L,] where L
=
o as e
j supplemental test result; L, = superimposed leakage; L,, =
j measured Type A leakage.
2.
Has duration sufficient to establish accurately the change in leakage rate between the Type A test and the supplemental test.
j 3.
Requires the quantity of gas injected into the primary contain-ment or bled from the primary containment during the supple-mental test to be between 0.75 L,and 1.25 L,.
d.
Type B and C tests shall be conducted with gas at P, 11.31 psig*,
l at intervals no greater than 24 months except for tlsts involving:
i
(
1.
Air locks, j
2.
Main steam line isolation valves, j
3.
Valves pressurized with fluid from a seal system, f
4.
All containment isolation valves in hydrostatically tested lines-j.
per Table 3.6.4-1 which penetrate (the primary containment, and l
5.
Purge supply and exhaust isolation valves with resilient material seals.
e.
Air locks shall be tested and demonstrated OPERABLE per Surveillance l
Requirement 4.6.1.3.
L f.
Main steam line isolation valves shall be leak tested at least once per 18 months."
f g.
Leakage from isolation valves that are sealed with fluid from a seal
~
system may be excluded, subject to the provisions of Appendix J of 10 CFR 50 Section III.C.3, when determining the combined leakage rate provided the seal system and valves are pressurized to at least maintain,12.44psig,andtheseal'systemcapacityisadequateto 1.10 P i
system pressure for at least 30 days.
h.
All containment isolation valves in hydrostatically tested lines per Table 3.6.4-1 which penetrate the primary containment shall be leak i
{
tested at least once per 18 months.
1 i.
Purge supply and exhaust isolation valves with resilient material 1
seals shall be tested and demonstrated OPERA 8LE per Surveillance j.
Requirements 4.6.1.8.3. and 4.6.1.8.4.
l j.
The provisions of Specification 4.0.2 are not applicable to i
Specifications 4.6.1.2.a, 4.6.1.2.b, 4.6.1.2.c, and 4.6.1.2.d.
l l
"Unless a hydrostatic test is required per Table 3.6.4-1.
kk Euy',t 6',. valves teat-foazd M t eal-fo28H, who'e h ci,at// Le /cak l.
f**s t estfn'or k 5/y /2,/987 TAN en y h*e., y le e s o., T ly o e, s 927*
PERRY - UNIT 1 3/4 6-5 a