Proposed Tech Spec 4.8.1.1.2 Reflecting Extension of Diesel Generator Surveillance Interval Until 911031
ML20029C025
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/18/1991
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20029C023 List:
References
NUDOCS 9103250103
Download: ML20029C025 (2)


Text

__-_ _ _ _ _ _ _ - - _ _ - _ _ - _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - . _ _ _ _ - _ - _ - _ - _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ - _ - _ _ _ _ _ - _ _ _ - _ _ _

. 1 .

l' .

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2 NRC DOCKET 50-324 OPERATING LICENSE DPR-62 REQUEST FOR LICENSE AMENDMENT ONE-TIME EXTENSION OF DIESEL GENERATOR SURVEILLANCE INTERVAL TECH.1ICAL SPECIFICATION PAGES - UNIT 2 9103250103 910318 PDR ADOCK0500g5 P

1

,..: q

a. .~

ELECTRICAL = POWER SYSTEMS (SURVEILLANCE REQUIREMENTS (Continued) 14.8.1.1.2 Each diesel generato. shall be demonstrated OPERABLE:

a. At least once per 31 days cn a STACCERED TEST BASIS by:
1. ' Verifying the fuel level in the engine-mounted fuel tank,
2. Verifying the fuel level in the day fuel tank, c 3. Verifying the fuel transfer pump can be started and trensfers fuel-from the day tank to the engine mounted tank,
4. Verifying the diesel starts and accelerates to at le.ast 514 rpm in less than or equal to 10 seconds,*
5. Verifying the generator is synchronized, loaded to greater than or-equal to 1750 ku, and operates for greater than or equal to 15 minutes, and
6. Verifying the diesel generator is aligned to provide standby power to the associated emergency buses.
b. At least once per 31 days by verifying the fuel level in the plant fuel ~ storage tank. ,.

c.- -At:least once.per 92 days by verifying that a sample of diesel fuel-from the fuel storage tank, obtained-in accordance with ASTM-D270-65, is within the acceptable limits specified-in Table 1 of ASTM-D975-74

-- when checked for visect.ity, water and sediment,

d. .At least once per 18 months during' shutdown by! "

Subjecting the diesel to an inspection in accordance with

~

1.

procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service,

2. Verifying the generator capability to reject a load equal to one core spray' pump without tripping, 1

Fec QktTonJg /bt evtyei1[aw.c.e x;barya./1Cr 76e.Inle.a./hiIcadohs se.t.I.a.4. H Lreog k y,fr. I.l.a.d. 7 na3La ex6 ended cadii u ocfcher 3y /W/.

  • The diesel generator start (10 seconds) from ambient conditions shall be performed at least once per 184 days in'these surveillance tests. - All_-

I other engine starts for the purpose of this surveillance testing may be preceded by a manually initieted engine prelube period and/or other warmup l

ptocedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.

N BRUNSWICK - UNIT 2 3/4 8-4 Amendment No. 134