Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19351A495 + (Proposed Tech Spec 4.0.2 Re Surveillance Requirements)
- B13528, Proposed Tech Spec 4.0.2,deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 Times Specific Surveillance Interval + (Proposed Tech Spec 4.0.2,deleting Requirement That Combined Time Interval for Any Three Consecutive Surveillance Intervals Not to Exceed 3.25 Times Specific Surveillance Interval)
- ML17305A591 + (Proposed Tech Spec 4.0.2,removing 3.25 Limit on Extending Surveillance Intervals in Accordance W/Generic Ltr 89-14)
- ML19327C212 + (Proposed Tech Spec 4.0.2,removing 3.25 Limit for Surveillances)
- ML17285A828 + (Proposed Tech Spec 4.0.2,removing 3.25 Time Interval Limit for Surveillance,Per Generic Ltr 89-14)
- ML20056B447 + (Proposed Tech Spec 4.0.3,permitting 24 H to Complete Inadequately Missed Surveillance)
- ML17328A180 + (Proposed Tech Spec 4.0.4,reflecting Exemptions to 18-month Measurement of Hot Leg/Cold Leg Delta T)
- ML19340A122 + (Proposed Tech Spec 4.1 Re Operational Safety Review Permitting More Conservative Recalibr of Nuclear Instrumentation)
- ML17334B288 + (Proposed Tech Spec 4.1.1.5,reducing Temp from 551 F to 545 F When Reactor Coolant Sys Average Temp Must Be Monitored Every 30 Minutes)
- ML18040A834 + (Proposed Tech Spec 4.1.3.1.4(a) Changing Requirements for Surveillance of Scram Discharge Vol Vent & Drain Valves)
- ML20151V107 + (Proposed Tech Spec 4.1.3.3,providing Alternate Surveillance Requirements for Determining Control Rod Scram Accumulator Operability)
- ML20210T154 + (Proposed Tech Spec 4.1.3.5.b.1.b,changing Low Pressure Alarm Setpoint on Control Rod Scram Accumulators to 940 Psig or Greater on Decreasing Pressure)
- ML20235X822 + (Proposed Tech Spec 4.1.5.b.2,Figure 3.1.5-1 & Bases 3/4.1.5, Maintaining Compliance w/10CFR50.62(c)(4))
- ML13317B031 + (Proposed Tech Spec 4.1.9 Re Auxiliary Feedwater Pumps & Valves.Sketch of Recommended Concept for Auxiliary Feedwater Sys & Description of Sys Used for Indication of Auxiliary Feedwater Flow Encl)
- ML19322B784 + (Proposed Tech Spec 4.11 Re Measurements & Control of Radioactive Liquid & Gaseous Effluents)
- ML20086Q422 + (Proposed Tech Spec 4.12.F.1.a Re Visual Insp Interval for Fire Barrier Penetration Seals)
- ML15007A223 + (Proposed Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp. Revised License Condition 3 Encl)
- ML18057A540 + (Proposed Tech Spec 4.14 Re Augmented Inservice Insp Program)
- ML17254A740 + (Proposed Tech Spec 4.15-4,clarifying Surveillance Requirement for Fire Suppression Sys)
- ML19329A428 + (Proposed Tech Spec 4.16 Re Nonradiological Environ Surveillance)
- ML19312B927 + (Proposed Tech Spec 4.17 Incorporating Program for Surveillance of Steam Generator Tubing)
- ML20079J666 + (Proposed Tech Spec 4.18 Re Steam Generator Tubing Surveillance)
- ML19312B841 + (Proposed Tech Spec 4.18.1 Re Extension of Surveillance Interval for Hydraulic Shock Suppressors)
- ML20085C999 + (Proposed Tech Spec 4.19 Re Auxiliary Bldg Crane Lifting Devices)
- ML19317D212 + (Proposed Tech Spec 4.2 Allowing re-insp of Reactor Coolant Outlet Nozzles at Future Refueling Outage)
- ML20107E660 + (Proposed Tech Spec 4.2 Re Primary Coolant Sys)
- ML20077R936 + (Proposed Tech Spec 4.2 Re Reactivity Control)
- ML20155D145 + (Proposed Tech Spec 4.2.1.F.1 Re Boric Acid Sys)
- ML19340A174 + (Proposed Tech Spec 4.2.10 for Reactor Vessel Surveillance Specimens & Tech Spec 4.2.11 for RCS)
- ML19326C418 + (Proposed Tech Spec 4.2.3 Re Structural Integrity of RCS Boundary)
- ML18010A481 + (Proposed Tech Spec 4.2.3.5 Re RCS Flow Measurement Instrumentation Calibr)
- ML20197C795 + (Proposed Tech Spec 4.2.6.1,revising Surveillance Frequency for Reactor Coolant Flow Rate)
- ML19312B993 + (Proposed Tech Spec 4.2.8 Modifying Reporting Requirements. Requires Forwarding of Rept of Test Results of Reactor Vessel Specimen Withdrawal to AEC)
- ML20070G891 + (Proposed Tech Spec 4.25 Bases Re Reactor Bldg Purge Filtration Sys)
- ML20065S345 + (Proposed Tech Spec 4.3.1 Re Number of Fuel Assemblies in Reactor Core)
- ML20155F124 + (Proposed Tech Spec 4.3.1.1,extending Monthly Surveillance Interval for Power Range Neutron Flux High Setpoint Addl 10 Days)
- ML20064N429 + (Proposed Tech Spec 4.3.1.e Re Reactivity Requirements & 6.1 Re Organization)
- ML20116D714 + (Proposed Tech Spec 4.3.2 Re ESFAS Instrumentation Surveillance Requirements)
- ML20095F892 + (Proposed Tech Spec 4.3.4.2.d Re Periodic Disassembly & Exam of Valves Associated W/Turbine Overspeed Protection Sys)
- B12550, Proposed Tech Spec 4.3.4.2a,increasing Main Turbine Control Valve Testing Interval from Weekly to Monthly + (Proposed Tech Spec 4.3.4.2a,increasing Main Turbine Control Valve Testing Interval from Weekly to Monthly)
- ML17285A876 + (Proposed Tech Spec 4.3.6-1, Source Range Monitor/Intermediate Range Monitor (Srm/Irm) Detector Not-Full-In Functional Test, Allowing Weekly Channel Test Surveillance for SRM & IRMs to Be Met as Stated)
- ML20081J251 + (Proposed Tech Spec 4.3.I to Require Inservice Insp Program for Piping to Be Performed as Identified in Generic Ltr 88-01 or Per Alternate Measures Approved by NRC)
- ML19308B015 + (Proposed Tech Spec 4.4 Re Limitations of Containment Integrated Leakage Rate & Containment Leakage Tests)
- ML20210E614 + (Proposed Tech Spec 4.4,demonstrating Operability of Electromatic Relief Valves at Sys Pressures Representative of Normal Parameters)
- ML20030D173 + (Proposed Tech Spec 4.4,lowering RCS Dissolved Hydrogen Level Limits)
- ML20003D672 + (Proposed Tech Spec 4.4.1.3.1 Re RCS Surveillance Requirements)
- ML17303A750 + (Proposed Tech Spec 4.4.10,allowing one-time Only Exception for RCS Vent Valve RCB-HV-105 to Be Tested During Mode 3)
- ML20205T541 + (Proposed Tech Spec 4.4.3,extending Specified Valve Local Leak Rate Tests Until First Refueling Outage Scheduled to Begin on 880201)
- ML17213B290 + (Proposed Tech Spec 4.4.3.3.b,permitting Pressurizer Heaters to Be Manually Connected to Emergency Power Source)
- ML17340A217 + (Proposed Tech Spec 4.4.5,changing RHR Sys Testing Frequency to 18 Months.Supporting Safety Evaluation Encl)
- ML19343A537 + (Proposed Tech Spec 4.4.5.2 for Main Coolant Sys Surveillance Requirements)