Proposed Tech Spec 4.4.1.3.1 Re RCS Surveillance Requirements
ML20003D672
Person / Time
Site: Beaver Valley
Issue date: 03/24/1981
From:
DUQUESNE LIGHT CO.
To:
Shared Package
ML20003D670 List:
References
NUDOCS 8103300289
Download: ML20003D672 (1)


Text

-

- ( ])

REACTOR COOLANT SYSTEM SURVEILLANCE RE0VIREMENTS l

4.4.1.3.1 The required residual heat removal loop (s) shall be determined OPERABLE per Scecification 4.0.5, and by verifying that each residual heat removal pump develops a differential pressure of 3,112 psi on recirculation flow.

4.4.1.3.2 The required reactor coolant pump (s), if not in operation, shall be determined to be OPERABLE once per 7 days by verifying correct breaker r

alignments and indicated power availability.

l 4. 4.1. 3. 3 The required steam generator'(s) shall be determined OPERABLE by verifying secondary side level equivalent to 12% narrow range at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

\\

4.4.1.3.4 At least one coolant loop snall be verified to be in operation and circulating reactor cociant at least once per 12 nours.

l l

BEAVER VALLEY UNIT.1 3/4 4-2d DESIRED WORC'NG L810380 0$T

.