ML20116D714

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 4.3.2 Re ESFAS Instrumentation Surveillance Requirements
ML20116D714
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/30/1992
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20116D708 List:
References
NUDOCS 9211060131
Download: ML20116D714 (2)


Text

g iti.

- ~ - - - -

~ - - - - - - - - - - - - - - - -

  1. s,z Tg

+

Q

-7,

-Docket No.'50-423 H]4272

-_ -Q..k 1

0 y,

' Attachment 1 Millstone Nuclear Power Station,.Vnit No. 3

-Proposed Revision to Technical Specifications Engineered Safety Features Actuation System

= Instrumentation Surveillance Requirements a

D

-r' 4

.(

October 1992 f

-9211060131 921030 PDR-ADOCK-05000423 0.1

. P.-

PDR r

sv

9 TABLE 4.3-2 (Continued)

TABLE NOTAT10!1 (1)

Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(2) This surveillance may be performed continuously by the eniergency generator load sequencer auto test system as long as the ECLS auto test system is demonstrated operable by the performance of an ACTUATION LOGIC TEST at least once per 92 days, t

(3) On a monthly basis, a loss of voltage condition will be initiated at each undervoltage monitoring relay to verify individual rel ay operation.

Setpoint verification and actuation of the associated logic and alarm relays will be performed as part of the channel calibration required once per 18 months.

[

s MILLSTONE - UNIT 3 3/4 3-11 Amendment No, #

0102

- - _ _ _ _ _ _ - _. _ _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _