ML20197C795
| ML20197C795 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/24/1986 |
| From: | NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20197C777 | List: |
| References | |
| NUDOCS 8611070041 | |
| Download: ML20197C795 (1) | |
Text
-..
P d
)
i POWER DISTRIBtTIION LIMITS DNB MARGIN LIMITING CONDITION FOR OPERATION 3.2.6
@e DNB margin shall be preserved by maintaining the cold leg temperature, pressurizer pressure, reactor coolant flow rate, and AXIAL SHAPE INDEX within the limits specified in Table 3.2-1 and Figure 3.2-4.
APPLICABILITY:
MODE 1.
ACTION:
1 With any of the above parameters exceeding its specified limits, restore the parameter to within its above specified limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce 'DIERMAL POWER to 5% of RATED 'DIERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
l 1
I SURVEILLANCE REQUIREMINIS
- 4. 2. 6.1 The cold leg temperature, pressurizer pressure, and AXIAL l
SHAPE INDEX shall be determined to be within the limits of Table 3.2-1 and Figure 3.2-4 at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. We reactor coolant flow rate shall be determined to be within the limit of Table 3.2-1 at least once per 31 days.
4.2.6.2 Te provisions of Specification 4.0.4 are not applicable.
l 8611070041 861024 PDR ADOCK 05000336 P
PDR MILLS'IONE - UNIT 2 3/4 2-13
..