Proposed Tech Spec 4.0.2,removing 3.25 Limit on Extending Surveillance Intervals in Accordance W/Generic Ltr 89-14
ML17305A591
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/08/1990
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A590 List:
References
GL-89-14, NUDOCS 9003220294
Download: ML17305A591 (8)


Text

PNTROLLED BY USFR ~

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

Ense~+ ~

4. 0.3 Failure to perform a Surveillance Requirement within the specified time interval shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Exceptions to these requirements are stated in the individual specifications. Surveillance Requirements do not have to be performed on inoperable equipment.

4.0.4

~ ~ Entry into an OPERATIONAL MODE or other specified condition shall not the Surveillance Requirement(s) associated with the Limiting

~

be made unless for have been performed within the'tated surveillance

~

" Condition ~

Operation

'=-=-."',='-= interval or as otherwise specified.

" ..~ " '-'--'. 0. 5 'urveillance Requirements for inservice inspection and testing of

= ASME Code Class 1, 2, and 3 components shall be applicable as follows:

a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50. 55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50. 55a(g)(6)(i).
b. Surveillance 'intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

9003~20294 900308 PDR ADOCK 0500052S P PDC PALO VERDE - UNIT 1 ~ 3/4 0-2

QOiXTROLLED BY USi=R BASES 4.0.1 This specification provides that surveillance activities necessary to ensure the Limiting Conditions for Operation are met and will be performed during the OPERATIONAL MODES or other conditions-for which the Limiting Condi-.

tions for Operation are applicable. Provisions for additional surveillance activities to be performed w'ithout regard to the applicable OPERATIONAL MODES or other conditions are provided in the individual surveillance requirements.

Surveillance requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception to an esca + '2, e

individual specification.

'for perfo 0.2 The provisions of this specification provide allowable surveillance activities beyond those specified '

to, nces nominal surveillance inte These tolerances are necessary ovide operational f'lexibility because of s uling and performanc siderations. The phrase "at least" associated with a s . llance uency does'ot negate this allowable tolerance value and permi erformance of more frequent surveillance activities.

The tolerance es, taken either individually or secutively over'three test intervals re sufficiently restrictive to ensure that liability associa sth the surveillance activity is not significantly degra yond th obtained from the nominal specified interval.

~ ~ h 4.0.3 The provisions of this specification set forth the criteria for determination of compliance with the OPERABILITY requirements of the Limiting Conditions for Operation. Under these criteria, equipment, systems, or if

'.~-..'., components are assumed to be OPERABLE the associated surveillance activ-

-:"'ties have been satisfactorily performed within the specified time interval. '=~'--'l Nothing in this provision is to be construed as defining equipment, systems, or components OPERABLE, when such items are found or known to be inoperable although still meeting the surveillance requirements.

i ',WW +Ah kt I

= ~ ~

=~

2 PALO VERDE - UNXT 1 B 3/4 0-2

CONTROLLED BY USERS APPLICABILITY SURVEILLANCE RE UIREHENTS l

-.";--',-.';=;
'-.4.0.1;;'Surveillance Requirements shall be applicable during the OPERATIONAL "

=~'..'~~:-:".- -" NODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

V

+45,tv+

e corn ine im

-"=, ":- ~;~:... 4.'0.3'ailure to perform a Surveillance Requirement within the specified time interval shall constitute a failure to eeet %he OPERABILITY requirements for a

~:.~,*.:'.:.":-":;"Limiting Condition'or Operation. Exceptions Co these requirements are stated in the individual specifications - Surveillance Requirements do not have to be

<-;"P'~'," ".', performed on inoperable equipment..

'4.0.4 Entry into an, OPERATIONAL MODE or other specified condition shall not

.;-:;:,.;::'-":=be made unless the Surveillance Requirement(s) associated with the Limiting

~"-'.>;;-'~':.,':.:. Conditionfor Operation have been performed within the stated surveillance;-":

,"~."'-'=-,'--:"'"..'interval or as'therwise specified. "

~

Surveillance Requirements for inservice inspection and testing of

'.0.5 ASHE

.Code Class 1, 2, and 3 components shall be applicable as follows:

a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section, XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted 4y the Commission pursuant to 10 CFR 50, Section 50.55a(g)(6)(i)..
b. Surveillance 'intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice 5 inspection and testing activities required by the ASME Boiler and .,

.'-. - . .--::;: Pressure Vessel Code and applicable Addenda shall be applicable as

...."... -'-:.-.": .follows 'in these Technical Specifications: . *

. I

=:-': ".:.:."'- =. -"'.- ',:;: ::.::.:: ':. '.

I

'i*

C PAID VERDE - UNIT 2 3/4 0-2

CONTROLLED BY USFR ~

BASES This specification provides that surveillance activities necessary

~ ~ ~ ~

~

('.0.1

~

.to ensure the Limiting Conditions for Operation are met and will be performed

~ ~ ~

during the OPERATIONAL MODES or other conditions-for which the Limiting Condi-.

'-'.-'ions

=-"-"

for Operation are applicable. Provisions for additional surveillance

,..activities to be performed without regard to the applicable OPERATIONAL MODES '

-~"~ or'ther conditions are provided in the individual surveillance requirements.

"-" p Surveillance requirements for Special Test Exceptions need only be performed when the Special Test Exception is being utilized as an exception to an

. -.,, ', individual specification. -.-

.0.2 . he provisions of this specification provide allowable tolera for per surveillance flexibility because

",-...".',",'.,-"at ng surveillance z

least" associated wit activities beyond those specified in the val. These tolerances are necessary to provid cheduling and performance consider surveillance frequency

'.. anal erational The phrase not negate this ce'f more frequent='.=-"

tolerance value and its the perfo '~':,a1lowable

'urveillance activities.

, ~e I~

-The tolerance values, ta esther'indiv lly or consecutively over'three

test, intervals, are suf 'qntly restrictive to ~ns that the reliability.--.-;"-
-

1&A ~ associated with urveillance activity is not signific degraded beyond

..t.hat from %he nominal s ecifi . al.

4.0.3 The provisions of this specification set forth the criteria for

-(

~

determination of compliance with the OPERABILITY requirements of the Limiting

~

kK

-.---,;; Conditions for Operation. Under these criteria, equipment, systems, or

<<..";-.-'<.-',. components are assumed to be OPERABLE if the associated surveillance activ- - ~

ities have been satisfactorily performed within the specified time interval.

~

Nothing in this provision is to be construed as defining equipment, systems, or OPERABLE, when such items are found or known to be inoperable 'omponents although -still meeting the surveillance requirements.

P AV'5

~ ~

S ~ p.. fl t ~ JAI 9 ~ ~ C

.~ ~

PALO VERDE - UNIT 2 9 3/4 0-2

CONTROLLED BY USER APP LICAB I LITY SURVEILLANCE RE UIREHENTS 4.0.Z Surveillance Requirements shall be applicable during the OPERATIONAL NODES or other'onditions specified for individual Limiting Conditions for

'peration unless otherwise stated in an individual Surveillance Requirement.

4.'0.3 Failure to perform a Surveillance Requirement within the specified time interval shall constitute a Vailure to meet the OPERABILITY requirements for a Limiting Condition for Operation. Exceptions to these requirements are stated in the individual specifications.. Surveillance Requirements do not have to be performed on inoperable equipment.

4.0.4 Entry into an OPERATIONAL MODE or other specified condition shall not

~

~ ~

be made unless the Surveillance Requirement(s) associated with the Limiting

~

,. Condition for Operation have been performed within the stated surveillance

~ ~

':-"'." . " '- interval or as otherwise specified.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:

Vp

a. Inservice inspection of ASME Code Class 1, 2, and 3 components and inservice testing ASME Code 'Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50, Section 50. 55a(g)(6)(i).
b. Surveillance 'intervals specified in Section XI of the ASHE Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

PALO VERDE - UNIT 3 3/4 0-2

r CONTROLLED BY VSER

~ ~

~

BASES 4.0.1 This specification provides that surveillance activities necessary to ensure the Limiting Conditions for Operation are met and will be performed during the OPERATIONAL HOOFS or other zonditions-for which the Limiting Condi-'

tions for Operation, are applicable. Provisions for additional .surveillance

".".,=; -., activities to be performed without regard to the applicable OPERATIONAL NODES ' '-" -;

",-.;-.: -..-.- -oi...other'.conditions are provided in the individual surveillance requirements.

Surveillance requirements for Special Test Exceptions need only be performed

"." -'"'." '=: when the Special Test Exception is being utilized as an exception to .an..

individual specification...-,:v .,-."

II r The.provisions:of,, thos specification provide allowable tole nces;-:. '"'~"--<'""--'-

..~:.'-",=".:=;-~";.";..-.-.=.'4.0..2

'"':;:.'..:;- surveil lane or orming survei.llance activities beyond those" specified in terval. 'These tolerances are'ece'ssary to pr t operational ominal lexibility becaus

!at least" associated ws scheduling and performance co urveillqnce fr

'tions.. The phrase cy does 'not .negate this-.=;::..., "

llowable'tolerance value 'and,pe 'erformance of more,;frequent~~-.;'~:

activities; .~'-=-'='-'urveillance

""."":.'"':.=.-;-'

The tolera a ues, taken wither individually or cutively'ver'.three test.'.int s, are sufficiqntly r'estrictive to ensure that the ability.'.~.;.:,,

ass ated with the surveillance activity is not significantly'egrade beyond ':

at obtained from the nominal specified interval..." '.--:-- "='-':r"-,-- -- .

-":- - .-" -'":-," 4.0.3. The provisions of this specification set forth the criteria for-determination of compliance with the OPERABILITY requirements of the Limiting Conditions for Operation. 'Under these criteria, equipment, systems, or-":..'-:-"..

.components are assumed to be .OPERABLE if the'associated surveillance activ-.",';.'-",".".'..=:,'.:

ities have been satisfactorily performed. within the specified time interval..;

Nothing in this provision is to be construed as defining equipment, systems, or components OPERABLE, when such items are found or known to be inoperable although still -meeting the surveillance requirements.

~ ~ I ra>yI> P'V'r>

P

'V

'r"-" 1 I ~ ~

PALO VERDE - UNIT 3 B 3(4 0-2

Ca