Proposed Tech Spec 4.0.2,removing 3.25 Time Interval Limit for Surveillance,Per Generic Ltr 89-14
ML17285A828
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/27/1989
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17285A827 List:
References
GL-89-14, NUDOCS 8911090137
Download: ML17285A828 (6)


Text

BASES CHANGE The following Bases change is submitted as recommended by Generic Letter 89-14 and is super imposed on the bases change submitted by the Supply System in accordance with guidance provided by the Staff in Generic Letter 87-09 (Supply System letter G02-89-016). Should this request be approved by the Staff prior to approval, of the 87-09 submittal the Supply System considers that the attached Bases change is still appropriate even though the 87-09 submittal might still be in review by the Staff.

g4 fl

5. S $g Q 4

3 4.0 APPLICABILITY BASES Con't Mhen a shutdown is required to comply with ACTION requirements, the provisions of Spec'ification 3.0.4 do not apply because they would delay placing the facility in a. lower CONDITIOH of operation.

S ecifications'4.0.1 throu h '4.0.5 establish the general requirements app ica e to urve ance equ rements. These requirements are based on the Surveillance Requirements stated'in the Code of Federal Regulations, i0 CFR 50.36(c)(3):

"Surveillance requirements are requirements relatina to test, calibration, or inspection to ensure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions of operation will be met."

Specification 4.0.1 establishes the requirement that surveillances must be per ormed uring t e OPERATIONAL CONDITIONS or other conditions for which the requirements of the Limiting Conditions for Operation apply unless otherwise stated in an individual Surveillance Requirement. The purpose of this specification is to ensure that surveillances are performed to verify the operational status of systems and components and that parameters are within specified lim'.ts to ensure safe operation of the facility when the plant is in an OPERATIONAL CONDITION or other specified condition for which the individual Limiting Conditions for Operation are applicable. Surveillance Requirements do not have to be"performed,when the facility is in an OPERATIONAL. CONDITION for which the requirements of the, associated Limiting Condition for Opera'tion do not apply unless otherwise specified. The Surveillance Reavirements associated with a Special Test Exception are only applicable when the Special bl<<h <<h ~4 Test Exception is used as an allowable exception to the requirements of a specification.

t<<h d

~.

nterva or urve 1'lance Reauirements may be extendedPMea~. permits an allowable extension of the normal surveillance interval to facilitate surveillance scheduling and consideration of plant operatina conditions that d-e~~

may not be suitable for conducting the surveillance; e.g., transient conditions or other onaoing surveillance or maintenance activities. -Bwm-b-.

-14nMM*e-use-of Qe-pi-ov-i-s-ions-of-$ 4e of Specification 4.0.2 ~

o4-used-based on engineering judgment and the recognition that the most probable result of any particular surveillance being Th performed is the verification of .conformance with the Surveillance Requirements~! '~These provisions -are;sufficient to ensure that the reliability ensured .through surveillance activities is not sianificantly degraded beyond that obtained from'he specified'urveillance interval.

I S ecification 4.0.3 establishes the failure to perform a Surveillance equirement w t n the allowed surveillance interval, defined by the provisions of Specification 4.0.2, as a condition that constitutes a failure pr Jet Acx I:l'4 a/ <~4 f>P~(

8

<<<>~4 3/4.9-4 f$

~g a fg~ ~g ~

/ $g Q g ( /

par ~rm g ~

.p g ss4euei JLsvc.~ zv l4Ma.l. 2 i~ wnA Ia l~Jcj gQg g-> . ~ /

woe@,

fc p MSAllf 4c cL cyaJ pghl> g~ gI-s~ry erl/ +~dies gM are ~s ~rC~eg d~ ri uy w~ su I'aJ y r'(ly>c~ ~y o~z u Sr(

glut'f ~ ~i ~<cP

0 il

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall b'e met during the OPERATIONAL CONDITIONS or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

4.0.2 Each Surveillance Requirement shall be performed within the specified Nur interval wit~~ ~45. C

~

maximum allowable extension not to exceed 2SX of the~surveillance

~

~

opinterval, -bob shal-1-not-exceed-3A?5-44mes-the-spe~d-surveys-'Aance-later vn+.

4.0.3 Failure to perform a Surveillance Requ'irement within the specified time interval shall constitute a failure to meet the OPERABILITY requirements for a Limiting Condition for Operation. .Exceptions to these requirements are stated in the individual Specificatons. Surveillance requirements do not have to be performed on inoperable equipment.

4.0.4 Entry into an, OPERATIONAL CONDITION or ot specified applicable condition shall not be made unless the Surveill Requirement(s) associated with the Limiting Condition for Operation-have n performed within the applicable surveillance interval or as othe i specific'd.

4.0.5 Surveillance Requirements for inse~ i inspection and testing of ASME Code Class 1, 2; s 8 3 components shall b~@Ticable as follows:

a. Inservice inspection of ASM/ e Class 1, 2, and 3 components and inservice testing of ASME C Class 1, 2, and 3 pumps and valves shall be performed in ac ance with Section XI of the ASME Boiler and Pressure Vessel Co applicable Addenda as required by 10 CFR 50, Section 50.55'( , except where specific written relief has been granted by the C ission pursuant to 10 CFR 50, Section 50.55a(g)

(6) (i)

b. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice inspection and testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these Technical Specifications:

Boiler and Pressure Vessel e'SME Required frequencies Code and applicable Addenda for performing inservice terminology for inservice inspection and testing inspection and testin activities activities Weekly At least once per 7 days Monthly At least once per 31 days quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually A least once per 366 days WASHINGTON NUCLEAR - UNIT 2 3/4 0-2