Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078E861 + (Proposed Tech Spec 3.9.4,permitting Containment Personnel Airlock Doors to Be Open While Moving Fuel During Refueling Operations)
- ML19340A121 + (Proposed Tech Spec 3.9.7 Re Measures to Assure Conformance W/Liquid Waste Effluent Release Limits)
- ML17334B036 + (Proposed Tech Spec 3.9.7 Re Refueling Operations Crane Travel in Spent Fuel Storage Pool Bldg)
- ML20023C001 + (Proposed Tech Spec 3/4 1-1 Re Reactor Protection Sys Power Monitoring)
- ML18092A687 + (Proposed Tech Spec 3/4 3-21,correcting Amend 60 by Incorporating Actions 17 & 18,inadvertently Deleted)
- ML20024H265 + (Proposed Tech Spec 3/4 4-20 Re Removal & Exam of Reactor Vessel Matl Specimens)
- ML20076D899 + (Proposed Tech Spec 3/4 4-27a Re Overpressure Protection Sys & PORV Operability)
- ML20151M325 + (Proposed Tech Spec 3/4 4.5, Steam Generators, Allowing Alternative to Tube Plugging or Sleeving in Steam Generators for Indications in Tubesheet Area)
- ML20212J347 + (Proposed Tech Spec 3/4 4.6 Re Reactor Pressure Vessel pressure-temp Curve,Deleting Ref to NEDO-21778-A)
- ML18086B494 + (Proposed Tech Spec 3/4 5-5 Re Surveillance Requirements of ECCS)
- ML20042A618 + (Proposed Tech Spec 3/4 6-17 Re Containment Sys)
- ML20023D876 + (Proposed Tech Spec 3/4 6-19 Re Operability of Containment Isolation Valves)
- ML20209E255 + (Proposed Tech Spec 3/4 6.1.7,changing Drywell Average Air Temp Limit from 135 F to 145 F)
- ML17219A491 + (Proposed Tech Spec 3/4 7.10, Snubbers, Deleting Listings within Tech Specs)
- ML17219A486 + (Proposed Tech Spec 3/4 7.10, Snubbers, Deleting Snubber Listing)
- ML20077F624 + (Proposed Tech Spec 3/4 8-10,Page 3/4 8-2 Re Surveillance Requirements for Electrical Power Sys & Ac & Dc Sources & Onsite Power Distribution Sys)
- ML20100G224 + (Proposed Tech Spec 3/4 8-4 Re Electrical Power Sys Surveillance Requirements)
- ML19310A589 + (Proposed Tech Spec 3/4.0 Re Limiting Conditions for Operation for License DPR-77)
- ML20070S430 + (Proposed Tech Spec 3/4.1.1.3 Re Moderator Temp Coefficient)
- ML20113D507 + (Proposed Tech Spec 3/4.1.3, Moveable Control Assemblies, Revising Time to Determine Source of Control Rod Inoperability)
- ML20140E712 + (Proposed Tech Spec 3/4.1.3, Moveable Control Assemblies, Re Control Rod Operability)
- ML17291A478 + (Proposed Tech Spec 3/4.1.3.1, Reactivity Control Sys)
- ML20063A387 + (Proposed Tech Spec 3/4.1.3.3 Re Reactivity Control Sys, Position Indication Sys Shutdown,Limiting Condition for Operation & Surveillance Requirements)
- ML20247N134 + (Proposed Tech Spec 3/4.1.3.4 Revising Control Element Assembly Drop Time Limits,Introducing Use of Arithmetic Average Drop Time & Addition of Table 3.1-1)
- ML20108D687 + (Proposed Tech Spec 3/4.1.3.9 Re Restriction on Axial Power Shaping Rod Position)
- ML20065M900 + (Proposed Tech Spec 3/4.1.5 Re Standby Liquid Control Sys)
- ML20211C853 + (Proposed Tech Spec 3/4.10, Special Test Exceptions - Shutdown Margin, Eliminating Requirement to Perform Reactor Trip During Low Power Physics Testing)
- ML20210A406 + (Proposed Tech Spec 3/4.10.5,allowing Suspension of Tech Specs 3.6.6.2 & 3.3.7.5 During Performance of Startup Test Program Until 100% of Rated Thermal Power Trip Tests Completed or Reactor Operated for 120 EFPD)
- ML20079D392 + (Proposed Tech Spec 3/4.2.1 Re Linear Heat Rate)
- ML20034A978 + (Proposed Tech Spec 3/4.2.1, Average Linear Heat Generation Rate)
- ML17223B166 + (Proposed Tech Spec 3/4.2.2,deleting Total Planar Radial Peaking Factor Ftxy)
- ML20054J721 + (Proposed Tech Spec 3/4.2.3 Re Min Critical Power Ratio)
- ML17345A796 + (Proposed Tech Spec 3/4.2.5 Re Power Distribution Limits,Dnb Parameters)
- ML20154H691 + (Proposed Tech Spec 3/4.3-54,modifying Chlorine Detection Sys to Provide for Control Room Alarm & Isolation in Event of High Chlorine Concentration at Control Room Air Intake & Tank Car Siding)
- ML20247R624 + (Proposed Tech Spec 3/4.3-8, Turbine Overspeed Protection Sys)
- ML20210F676 + (Proposed Tech Spec 3/4.3.1, Reactor Trip Sys Instrumentation, Modifying Surveillance Frequencies & out-of-service & Test Times for Selected Functional Units)
- ML20207B852 + (Proposed Tech Spec 3/4.3.10, App R Alternative Shutdown Instrumentation & Controls, Incorporating More Restrictive Action Statement in Event of Combustion Turbine Generator Inoperability)
- ML20082A181 + (Proposed Tech Spec 3/4.3.2 Re Containment & Reactor Vessel Isolation Control Sys)
- ML20154M381 + (Proposed Tech Spec 3/4.3.2 Re Reactor Water Level Setpoint for Isolation of Group 1 Primary Containment Isolation Valves from Low Level 2 to Low Level 3)
- ML20005F684 + (Proposed Tech Spec 3/4.3.2, ESFAS Instrumentation, Reflecting Increase to Surveillance Test Interval to 24 Months.Instrument Drift Study Encl)
- ML20154J541 + (Proposed Tech Spec 3/4.3.2,deleting All Refs to Excessive Cooldown Protection & Associated Items.Proposed FSAR Revs Encl)
- ML20065S514 + (Proposed Tech Spec 3/4.3.2.2 Re Instrumentation,Steam & Feedwater Rupture Control Sys Instrumentation)
- ML20065M876 + (Proposed Tech Spec 3/4.3.2.2, Steam & Feedwater Rupture Control Sys Instrumentation)
- ML20079M719 + (Proposed Tech Spec 3/4.3.3 Deleting Fire Detection Instrumentation & 3/4.7.9 Deleting Fire Suppression Sys, Spray &/Or Sprinkler Sys & Fire Hose Stations)
- ML20248B415 + (Proposed Tech Spec 3/4.3.3 Re Monitoring Instrumentation)
- ML20055E003 + (Proposed Tech Spec 3/4.3.3.3,correcting Ref for Reg Guide 1.12, Instrumentation for Earthquakes)
- ML17214A163 + (Proposed Tech Spec 3/4.3.4 Re Turbine Overspeed Protection)
- ML20214H317 + (Proposed Tech Spec 3/4.3.4, Turbine Overspeed Protection, Increasing Test Frequency to 120 Days)
- ML20065G862 + (Proposed Tech Spec 3/4.3.4,eliminating Monthly Testing of Low Pressure Turbine Reheat Stop & Intercept Valves)
- U-601766, Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation + (Proposed Tech Spec 3/4.3.4.1, ATWS Recirculation Pump Trip Sys Instrumentation)
- ML20128K388 + (Proposed Tech Spec 3/4.3.4.2, EOC Recirculation Pump Trip Sys Instrumentation, Reflecting Revised Frequency for Measuring Breaker Arc Suppression Time from Once Every 18 Months to Once Every 60 Months)