Proposed Tech Spec 3/4.2.3 Re Min Critical Power Ratio
ML20054J721
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 06/24/1982
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20054J716 List:
References
NUDOCS 8206290490
Download: ML20054J721 (3)


Text

_ _ _

POWER DISTRIBUTION LIMITS 3/4.2.3 MINIMUM CRITICAL POWER RATIO LIMITING CONDITION FOR OPERATION 3.2.3.1 The MINIMUM CRITICAL POWER RATIO (MCPR), as a function of core flow, shall be equal to or greater than the MCPR limit times the Kf shown in Figure 3.2.3-1, provided that the end-of-cycle recirculation pump trip system is OPERABLE per specification 3.3.6.2, with:

a.

If ODYN OPTION A analyses are in effect, the MCPR limits are listed below:

1.

MCPR for 7x7 fuel

= 1.21*

2.

MCPR'for 8x8 fuel

= 1.29 3.

MCPR for 8x8R fuel = 1.2 5 and l

4 MCPR for P8x8R fuel = 1.27 b.

If ODYN OPTION B analyses are in effect (refer to specification 3.2.3.2), the MCPR limits are listed below:

1.

MCPR for 7x7 fuel

= 1.20*

2.

MCPR for 8x8 fuel

= 1.29 3.

MCPR for 8x8R fuel = 1.21 and 4

MCPR for P8x8R fuel = 1.22 APPLICABILITY: CONDITION 1 when THERMAL POWER 1 25% RATED THERMAL POWER ACTION:

i With the end-of-cycle recirculation trip system INOPERABLE per a.

Specification 3.3.6.2, operation may continue and the provisions of Specification 3.0.4 are not applicable with the following MCPR limit adjustments:

1.

Beginning-of-cycle (BOC) to end-of-cycle (EOC) minus 2000 MRD/t, within one hour determine that MCPR, as a function of core flow, is equal to or greater than the MCPR limit times the Kg shown in Figure 3.2.3-1 with:

If ODYN OPTION A analyses are in effect, the MCPR limits are a.

listed below:

1.

MCPR for 7x7 fuel

= 1.20*

2.

MCPR for 8x8 fuel

.= 1.29, 3.

MCPR for 8x8R fuel - 1.2 4 and,

l 4

MCPR for P8x8R fuel = 1.26 b.

If ODYN OPTION B analyses are in effect (refer to specification 3.2.3.2), the MCPR limits are listed below:

1.

MCPR for 7x7 fuel

= 1.20

  • 2.

MCPR for 8x8 fuel

= 1,29 3.

MCPR for 8x8R fuel = 1.22 and 4

MCPR for P8x8R fuel = 1.25 BRUNSWICK - UNIT 2 3/4 2-11 Amendment No.

8206290490 820624 PDR ADOCK 05000324 P

PDR

i 2.

EOC minus 2000 MWD /t to EOC, within one hour determine that MCPR, as a function of core flow, is equal to or greater than the MCPR limit times the Kg shown in Figure 3.2.3-1 with:

J f 'dDYN OPTION A analyses'a' eln iffict,- the MCPR limits are I

-~

~ 7

-a. -

r listed below:

1.

MCPR for 7x7 fuel

= 1.28*

2.

MCPR for 8x8 fuel

= ~ 1.3 5 3.

MCPR for 8x8R fuel = 1.36 and 4.

MCPR for P8x8R fuel = 1.39 b.

If ODYN OPTION B analyses are in effect (refer to specification 3.2.3.2), the MCPR limits are listed below:

1.

MCPR for 7x7 fuel

= 1.20*

2.

MCPR for 8x8 fuel

= 1.29, 3.

MCPR for 8x8R fuel = 1.24 and, 4.

MCPR for P8x8R fuel = 1.27 b.

With MCPR, as a function of core flow, less than the applicable limit determined from Figure 3.2.3-1 initiate corrective action within 15 minutes and restore MCPR to within the applicable limit within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIPIMENTS 4.2.3.1 MCPR, as a function of core flow, shall be determined to be equal to or greater than the applicable limit determined from Figure 3.2.3-1:

A.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, B.

Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> af ter completion of a THERMAL POWER increase of at least 15% of RATED THERMAL POWER, and C.

Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating in a LIMITING CONTROL ROD PATTERN for MCPR.

  • For 7x7 fuel assemblies, the K factor is based on the 112% flow curve of g

Figure 3.2.3-1 rather than the actual setpoint of 102.5%.

BRUNSWICK - UNIT 2 3/4 2-11A Amendment No.

TABLE 3.2.3.2-1 TRANSIENT OPERATINC LIMIT MCPR VALUES s

N TRANSIENT FUEL TYPE 7x7 8x8 8x8R P8x8R U

N NONPRESSURIZATION TRANSIENTS 1

With RPT operable (op.)

1.20 1.29 1.21 1.22 With RPT inoperable (inop.)

1.20 1.29 1.22 1.25

I TURBINE TRIP / LOAD REJECT WITH0lTr BYPASS E

MCPR MCPR HCPR MCPR HCPR MCPR MCPR MCPR A

B A

B g

B A

B e

G RPT (op.)

1.21 1.13 1.25 1.17 1.25 1.17 1 27 1.19 m

7 RPT (inop.) BOC + EOC - 2000 1.18 1.08 1.23 1.08 1.24 1.08 1526 1.08 RPT (inop.) EOC - 2000 + EOC 1.28 1.18 1.35 1.23 1.36 1.24 1 39 1.27 FEEDWATER CONTROL FAILURE

?j MCPR MCPR MCPR MCPR HCPR HCPR PR EPR A

B A

B A

B A

B RPT (op.)

1.16 1.13 1.17 1.14 1.17 1.14 l'17 1.14 RPT (inop.) BOC + EOC - 2000 1.16 1.10 1.16 1.10 1.17 1.11 1.17 1.11 E

RPT (inop.) EOC - 2000 + EOC 1.15 1.09 1.16 1.10 1.16 1.10' l.17 1.11

-