Docket Nu ber 50-346 ,

Licenco Nu ber NPF-3 Serial Number 1875 Attachment Pega 7 of 11 INr0RMA"0N ON.Y INSTRUMENTATION ,

STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION LIMITING CONDITION Foi OPERATION 3.3.2.2 The Steam and Feeowater Rupture Control System ($FRCS) instrumen-tation channels shown in Table 3.3-11 shall be OPERABLE with their trip setpoints set consistent *:N the values shown in the Trip Setpoint column of Table 3.312 and with RESPONSE TIMES as shown in Table 3.3-13.

APPLICABILITY: MODES 1. 2 and 3.

ACTION:

a. With a SFRCS instrumentation channel trip setpoint less con-servative than the value shown in the Allowable Values column of Table 3.3-12. declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-11, until the channel is restored to OPERABLE status with the trip setpoint adjusted consister.t with the Trip Setpoint value.
b. With a SFRCS instrumentation channel inoperable, take the action shown in Table 3.3-11.

SURVE!LLANCE REOUIREMENTS 4.3.2.2.1 Each SFRCS instrumentation channel shall be demonstrated i OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBPATION anc CHANNEL FUNCTIONAL TEST during the N00ES and at the frecuencies shown in Table 4.3-11, 4.3.2.2.2 The logic for the bypasses shall be demonstrated OPEPABLE i

during the at power CHANNEL FUNCTIONAL TEST of charne;s affected by i

bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL rJ.LIBRATION testing of each channel affected by bypass operation.

4.3.2.2.3 The STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM RESPONSE TIME of each SFRCS function shall be demonstrated to be within the limit at -

least once per 18 months. Each test shall include at least one channel-per function such that all channels are tested at least once every N

! times 18 nenths where N is the total number of redundant channels in a l specific SFRCS function as shown in the " Total No. of Channels" Column of Table 3.3-11.

DAVIS-BESSE, UNIT 1 3/4 3 23 FOkkObbk00bbf6 - _ .

r? D E C 8 U E U. 2 E-'

. Pr E. 2 2  ;

oSz*z i 35EE T"Y n=,

TABLE 3.3-11 g7g g 540 m

4, STEAM AND FEEDUATER RUPTURE CtMfTROI. SYSTEM INSTRUMENTATION Lg i U '

1 N

- MINIMM TOTAL NO. CBANNELS CSANNELS l FINICTIONAL W4g 0F CSAf8 EELS TO TRIF DPERABLE ACTION

.i

1. Main Ster, tressure Low InsttJoent Channels
  • 2 1 2 16I l
a. PS 36895 Steam Line 1 Channel I I
b. FS 3689D Steam Line 2 Channel I
c. FS 3689F Steen Line 1 Channel 1 .

M s-

-l

'y d. FS 36895 Steam Line 2 Chancel I y.

i.

s. FS 3687A Steam Line 2 Channel 2 c
0 S -

j f. FS 3687C Steam Line 1 Channel 2 y

--4 jg O g Z

g- g. FS 36875 Steam Line 2 Channel 2 O

l$

,- 2

!g h. FS 3687G Steam Line 1 Channel 2 Q

^un ta

<n

I! N E C S .

il 5 " 3 P AL5 2 o

E!Ez!

@. 5 "y TABLE 3.3-II (Continued} ~

"AEA STEAM AND FEEDUATER RIIFTilRE CONTROI. STSTEM INSTRUMENTATION - "w E .*e ?

  • ?Y MINIMilM TOTAL No. CEAfGOEt.S CSAf4NEl.S FINICTIONAL INIIT OF CEANNEI.S TO TRTF OPERABLE ACTinti 2.

Feedvater/ Steam Generator Differential Pressere - Bigh Instrument Channels -

2 1 2 161

a. FDS 26854 Feedvater/ Steam Generator 2 Channel 2 FDS 26858 Feedwater/Steen Generator 2 Channel 2 '
b. FDS 2685C Feedvater/ Steam Generator 2 Channel I FDS 26858 Feedwater/Stees Generater 2 Channel I
c. FDS 2686A Feedwater/Steae Generator I Channel I ['

FDS 26868 Feedester/5tese Generator 1 Channei I

d. FDS 2686C Feedvater/ Steam Generator 1 Channel 2 FDS 26860 Feedveter/Stees Generator 1 Channel 2
3. Steen Generator f.eeel - Low Instrument Channels 2 1 2 161l
a. LSLL SF958 Steam Generator 1 Channel 1 1.5LI. SF989 5 teen Generator 1 Channel 1
b. LSLL SP9A6 Steam Generator 2 Channel 1 2" LSLL SFSA7 Steam Generator 2 Channel 1 3 23
c. LSLL SP9AS Steam Generator 2 Channel 2 E LSLL SFSA9 Steen Generator 2 Channel 2 E, 2

C"")

2 k

r?NECS  ;

O g ;12 4 1

j

- a t. 5* 2  ;

?: 2 =- l

o E8E8 j h
  • X&?

TABLE 3.3-11 (Continneil} "Q" 7 5xE 4

g STEAN AND FEEDUATER RIIFTilRE C0tGROL SYSTEM INSTRIMENTATION yqL ,

4 g; La

MINIMtm g, TOTAL MO. CEAIGIELS CRANNEl.S 4 FIBICTIONAL IMIT OF CBANNELS TO TRIP GFERABl.E ACTint
3. Steam Generator Level - Lew Instrument Channels (cos;tinued)
d. LSLL SF986 Steae Generator 1 Channel 2 LSLL 5F987 Stese Generator 1 Channel 2  :

u 4. 14ss of SCF Channels 2 1 2 163 5

w

3. Manual Initiation (rush buttons) 93
  • a. Initiate AFFT II I I I II
b. Initiate AFFT 82 1 I I 17
c. Initiate AFFT B1 sad Isolate SG II I I I 17
d. Initiate AFFT 82 and Isolate SG II I I I 17 f

e, T ,

O l z

=

N

- iiit:

5

--A O

^

~ o I us E r-

Dockot Nunbar 50-346 Licensa Nurbar NPF-3 Serial Numbar 1875

Attnehment rage 11 of 11 TABLE 3.3-11 (Continued) '

TABLE NOTATION May be bypassed when steam pressure is below-f00 psige Bypass shall. ben autoestically removed when. the steam pressure exceeds gig.

00 t The provisions of Specification 3.0.4 are not applicab ACTION STATDSNTS" 1

ACTION 16 -

Vith the number of 0FDLA51X. Channels one less than the- l Total. Number of Channels, STARTUF and/or"POVEL:0FDLATION: l may proceed until performance:of the next required CHAttest FUNCTIONAL. TEST provided the inoperable section of the a channel is placed in-the tripped condition within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 17 -

Vith the number of 0FERA312 Channels one lass than the : 1 Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be'in at least 507-STANDET vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD =SBUTDOVN vithin the fallowing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

1 DAVIS-BESSE, UNIT 1 3/4 3-27 Amendment No. A7 AW,135 r

, - , - - - . , - -