Proposed Tech Spec 3/4.3.2.2 Re Instrumentation,Steam & Feedwater Rupture Control Sys Instrumentation
ML20065S514
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/19/1990
From:
CENTERIOR ENERGY
To:
Shared Package
ML20028H336 List:
References
NUDOCS 9012210112
Download: ML20065S514 (5)


Text

_ _ _ _ _ _ _ _ -

Dockat Nu bar 50-346 Licenso Nurber NPF-3 Scriel Number 1885 4 --

INSTRUMENTATION STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2.2 The Steam and Feedwater Rupture Control System (SFRCS) instrumen-tation channels shown in Table 3.3-11 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-12 and with RESPONSE TIMES as shown in Table 3.3-1 APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a.

With a SFRCS instrumentation channel trip setpoint less con-servative than the value shown in the Allowable Values column of Table 3.3-12, declare the charnel inoperable and apply the applicable ACTION requirement of Table 3.3-11, until the channel is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value, b.

With a SFP.CS instrumentation channel inoperable, take the action shown in Table 3.3-11.

SURVEILLANCE REOUIREMENTS 4.3.2.2.1 Each SFRCS instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and shown CHANNEL in Table FUNCTIONAL 4.3-11, TEST during the MODES and at the frequencies 4.3.2.2.2 The logic for the bypasses shall be demonstrated OPERABLE during bypass the at power CHANNEL FUNCTIONAL TEST of channels affected by operation.

The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.

4.3.2.2.3 The STEAM AND FEE 0 WATER RUPTURE CONTROL SYSTEM RESPON of each least onceSFRCS function shall be demonstrated to be within the limit at per 18 nunths.

Each test shall include at least one channel per function such that all channels are tested at least once every N times 18 months where N is the total numbe of redundant channels in a specific SFRCS function as shown in the " Total No of Channels" Column of Table 3.3 11.

DAVIS-BESSE, UNIT 1 3/4 3-23 9012210112 901219 PDR ADOCK 05000346 P PDR

ENNCE

% 5;;15; a m e !"_. 5 3 A Ns rar

,wn c,

> TABLE 3.3-11 ~ "w m $5?

f, STEAM AND FEEDUATER RUPTURE CONTROL SYSTEM INSTRUMENTATION *7y ue g

N HINIMUM TOTAL No. CHANNELS CSANNELS l FUNCTIONAL LHIT OF CHANNELS TO TRIP OPERABLE- ACTION

1. Main Steam Pressure Lov Instrument Channels
  • 2 1 2 161 l
a. PS 36898 Steam Line 1 Channel I
b. PS 3689D Steam Line 2 Channel I
c. PS 3689F Steam Line 1 Channel 1 s.
d. PS 3689H Steam Line 2 Channel 1

{

d 3 ---.

PS 3687A Steam Line 2 Channel 2

"""" M e.

E 13 rs

f. PS 3687C Steam Line 1 Channel 2 MM g

$ E F g. PS 3687E Steam Line 2 Channel 2 D T d ===4 3

g 5N C

h. PS 3687G Steam Line 1 Channel 2 3<

~

M c3 rn 3 C s

IN kC 1

EN$C?

E E " S Er e E- E E *.

1 [!

gar o ,.,

h-m TABLE 3.3-11 (Cont (nuedl 5zo

$50 En STEAM AND FEEDUATER RIJPTIIRE CONTROL SYSTEN INSTRifMENTATION b$

N

.N HINIHi1H h

H TOTAL NO. CHAftiELS CHANNELS FINGCTIONAL UNIT OF CRANNELS TO TRIP OPERABLE ACT g w

2. Feedvater/ Steam Generator Differential Pressure - Elgh Imstrument Chamaels 2 1 2 163l
a. PDS 2685A Feedwater/ Steam Generator 2 Channel 2 PDS 26858 Feedvater/ Steam Generator 2 Channel 2 1' b. PDS 2685C Feedvater/Stean Generator 2 Channel 1
  • FDS 26850 Feedwater/5 team Generator 2 Channel 1 Y

g c. PDS 2696A Feedvater/ Steam Generator I Channel 1 FDS 26868 Feedwater/ Steam Generator-1 Channel I H

d. PDS 2686C Feedvater/ Steam Generator I Channel 2 g PDS 2686D Feedwater/Stesa Generator 1 Channel 2 3-g 3. Steam Generator g

'g Level - Low Instrument Channels 2 1 2 C3 m l3l>

N 16s l

[

, a. LSLL SP988 Steam Generator I Channel ! ym a

LSLL SP989 Steam Generator i Channel I gm E h. LSLL SP9A6 Steam Generator 2 Channel I y P LSLL SP9A7 Steam Generator 2 Channel 1 y h c. LSLL SP9A8 Steam Generator 2 Channel 2 E LSLL SP949 Steam Generator 2-Channel 2 g 2

Q C:7

WMU I

m>mro

$a "l. 0 X 0 EST 5 ? ~ " ~E c$Ez

" " ? ?, &

a C A??

g TABLE 3.3-11 (Continued) j"m m

f, STEAM AND FEEDUATER RUPTIIRE C0ffTR01. SYSTEM INSTRUMENTATION 85?

" 8 E

N HINIMUH g TOTAL NO. CHAMELS CHANNELS a FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE ACTION l

3. Steam Generator l Level - Law Instrument l Channels.(continued)
d. LSLL SP986 Steam Generator 1 Channel 2 LSLL SF957 Stese Generator 1 Channel 2
4. Loss of RCP Channels 2 1 2 165 l S. Manual Initlatlon (Fush buttons)
a. Initlate AFFT 51 '1 1 1 1y
b. -Initiate AFPT 12 I I 1 =-17
c. Initiate AFFT Il and Isolate SG 81 1 1 1 My
d. Initlate AFPT B2 and Isolate SC 52 1 1 1M y g mN g CD 3:s n  ::23 cm E gm a :p

- -4  %

  • 6 "23 b

y 2E"as::::

C lX c

3 C:3 CE!c=2 m

DockstNdmbar50-346 Licens2 Nunbar NPF Serial Number 1885 Attachment Page 11 of 11 TABLE 3.3-11 (Continued)

TABLE NOTATION '

qg May be bypassed when steam pressure is below psig. Bypass shall be automatically removed when the steam pressure exceeds sig.

i The provisions of Specification 3.0.4 are not'applicab .

ACTION STATEMENTS ACTION 16 -

Vith the number of OPERABLE Channels one less than the I Total Number of Channels. STARTUP and/or POVER OPERATION\

may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided'the inoperable section of the channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.,

ACTION 17 -

Vith the number of OPERABLE Channels one less than the i Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY vithin the following the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTD0VN vithin 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

DAVIS-BESSE, UNIT 1 3/4 3-27 Amendment No. A7,4%4/,135

_ _ _ _ - _ _ - -