EJiillERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- c.
By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment wn;ch could be transported to the containitent sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed.:
- 1.
For all accessible areas of the containment prior to establ;sning CONTAINMENT INTEGRITY, and
- 2.
- Of the areas affected within contairwent at the completion of each containment entry when CONTAINMENT INTEGRITY is established..
- d.
At least once per 18 110nths by:
- 1.
- !:i:::.:~:*:!:.!::1~!~:.:*:;.::::"!::: :::;::.::.:"~.:~:~
~'tett pFeS&WFI h lbGldl 5SO psig.
- 1.
A visual inspection of the contaiment S&lllP and verifying that
]
the subsyste111 suction inlets are not restricted by debris and that the sump CQllPonents (trash racks, screens, etc.) show no evidence of structural distress or cor1"'0sion *
- e.
At least once per 18 11anths, during shutdown, by:
- 1.
Verifying that each automatic valve in the flow p~th actuates to its.correct position on a safety injection test signal.
- 2.
Verifying that each of the following pumps start automatically upon receipt of 1 safety injection test signal:
a) b)
c)
Cent1"ifuga1 charging pump Safety injection pa.mp Residual heat removal p~
(
8205210390 8:;;;2:;;:0-;;-5-:;-17;;;;------~\\
~DR ADOCK 05000272 PDR
. 3/4 5-5
C:MERGENCY CORE CO~LING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.5.2.1 The automatic isolation and interlock function of the RHR System.shall be verified within the seven (7) days prior to placing the RHR System in service for cooling of the Reactor Coolant System.
Thie *hall be done by verifying that valves RHl and RH2 cl.ose upon insertion of a test signal corresponding to a reactor coolant pressure of 580 psig or less, and that, with a test signal corresponding to a reactor coolant pressure of 580 psig or greater, that the valves cannot be opened.
SALEM UNIT 1 3/4 5.5 b
~MERGENCY CORE CO~LING SYSTEMS SURVEILLANCE REQUIREMENTS {Continued) 4.5.2.i The automatic isolation and interlock function of the RHR System shall be verified within the seven (7) days prior to placing the RHR System in service for cooling of the Reactor Coolant System.
This shall be done by verifying that valves RHl and RH2 close upon insertion of a test signal corresponding to a reactor coolant pressure of 580 psig or less, and that, with a test signal corresponding to a reactor coolant pressure of 580 psig or greater, that the valves cannot be opened.
SALEM UNIT 2 3/4 5-6a
EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- c.
By a visual inspection which verifies that no 1oose debris (rags, trash, clothing, etc.) is present in the containment which could be transported to the containinent sump and cause restriction of the pump suctions during LOCA conditions. ihis visual inspection shall be performed:
- d.
- 1.
For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and
- 2.
Of the areas affected within contain1tent at the completion of each con~inment entry when CONTAINMENT INTEGRITY is established.
At least once per 18 11Cnths by:
~:!~;:~.:u:::*~;:,!::1~:!~:.:*~::::'"!::: :::;::.::.:*~.:~~~
~tell pFeS&WFI is HJQVI 5SC p&iio
- l.
- 1.
A visual inspection of the containment sumi:i and verifying that the subsystem suction inlets are not restricted by debris and that the sump C011Ponents (trash rackJ, screens, etc.) show no evidence of structural distress or corrosion.
- e.
At least once per 18 8Cnths, during shutdown, by:
- 1.
Verifying that each automatic valve in the flow p~th actuates to its correct position on a safety injection test signal.
- 2.
Verifying that each af the following pu.ps start automatically upon receipt of 1 safety injection test signal:
a)
Centrifugal charging pump b). Safety injection punp c)
Residual hti&t f8ilaval pump SALEM - UNIT 2 3/4 S-5