ML20034A978

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3/4.2.1, Average Linear Heat Generation Rate
ML20034A978
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/16/1990
From:
GULF STATES UTILITIES CO.
To:
Shared Package
ML20034A976 List:
References
NUDOCS 9004250169
Download: ML20034A978 (1)


Text

.__..- -.-.-. - - _

o '3/4. 2 POWER DISTRIBUTION LIMITS

' 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE l

LIMITING CONDITION FOR OPERATION 4

3.2.1 All' AVERAGE PLANAR LINEAR HEAT GENERATION RATES (APLHGRs) for each type of fuel as a function of AVERAGE PLANAR EXPOSURE shall not exceed the limits e;~..,, ja fig.7ei 0. 2.1,1, 3. 2y-2, 3. j. }-3, 3. j. } *, 3.2. }-p,,3 3. }-p,,3. 2.14

{

.nu..... v.

4..

i m. i.. vi r i vun.

....r4,

......,... 4,,.....,,

3. 2.1 - 0, 0. 2.1 G, 0. 2.1 7 e,m 0.0.1 0,shall be reduced ~to a value of 0.84 j

times the two 4ylap o

erotion limit when in single loop i

M ration, specifieri in the COIR.

i limit s cified

  • the CD APPLICABILITY:

OPERATIONAL CONDITION 1, w e ate an or equal to 25% of RATED THERMAL POWER.

ACTION:

With an APLHGR exceeding the limit......g re 0.0.1 1,.'.2.1 2, 0.2.1-0, 0.2.14, 0.2.10, 0.0.10, 0.2.17 er 0.2.1-0, initiate corrective action

[

within 15 minutes and restore APLHGR to within the required limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within-i the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.1 All APLHGRs shall be verified to be equal to or less than the limits U

determined fre;. fig.re; 0.0.11,0.2.12,.';.2.10,0.0.14,0.2.10,0.2.10, 0.2.1 7 =d 0.2.1-0:

d ep a.

At least once per 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br />, b.

Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after completion of a THERMAL POWER increase of at

-least 15% of RATED THERMAL POWER, and

'i c.

Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for APLHGR.

RECElyED d.

The provisions of Specification 4.0.4 are not applicable.

gY051989 5Dc

  • Tu :i;.it; = rig ra; 0.0.17 ;a: 0.2.1-0.r; t: u =:: =13 fr==1
l; 1;tien;.

RIVER BEND - UNIT 1 3/4 2-1 Amendment No. 22, JZ, 33 9004250169 900416 m

DR ADOCK 05000458 PDC dj s