Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005B527 + (Procedural Guidelines for Reactor Coolant Gas Vent Sys)
- 05000387/FIN-2010004-01 + (Procedural Inadequacies Result in Reactor Scram and Loss of Normal Heat Sink)
- ML20058J408 + (Procedural Instructions for Determination and Analysis of Actual Underutilization of the Installed Electrical Capacity at Nuclear Power Plants)
- 05000335/FIN-2015001-02 + (Procedural Non Compliances Relating To Temporarily Installed Ladders Located Near Safetyrelated SSCs)
- 05000272/FIN-2014005-01 + (Procedural Non-Compliance Resulted in Low Temperature Overpressure Relief Lifting)
- 05000331/FIN-2011005-03 + (Procedural Non-Compliance Results in Reactor Building Crane Colliding with ISFSI Inspection StanD)
- 05000335/FIN-2015004-04 + (Procedural Non-compliances Relating to Installed Scaffold Located Near Safety-related SSCs)
- ENS 55911 + (Procedural Noncompliance with Administrative Items Relied on for Safety (IROFS))
- ENS 54298 + (Procedural Noncompliance with Administrative Item Relied on for Safety)
- ML20070B055 + (Procedural Order 7 Re Ndfc 93-1 Nuclear Decommissioning Financing Committee)
- ML20009H201 + (Procedural Order Requiring Replies by Intervenors Filing Late Contentions.Reply Should Address Specific Legal & Factual Arguments)
- ML20069G467 + (Procedural Reasons for Acceptance of D Gillman 830228 Five Contentions)
- 05000286/FIN-2010003-01 + (Procedural Requirements for N-38 Component Classification for Preventative Maintenance Not Implemented)
- 05000286/FIN-2011010-01 + (Procedural Requirements of Engineering Change Process Not Implemented)
- ML19294A603 + (Procedural Violation in Welding of Main Loop Piping of Reactor 1 Coolant Sys Reported to NRC on 781023 Has Been Investigated & Judged Not Reportable Under 10CFR50)
- ML20056A436 + (Procedural and Submittal Guidance for Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities.Draft Report for Comment)
- ML20082D178 + (Procedural and Submittal Guidance for Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities.Final Report)
- 05000280/FIN-2006005-01 + (Proceduralized Departures from TS)
- ML100350575 + (Procedure & Criteria Utilized to Generate In-Structure Response Spectra)
- ML102700537 + (Procedure - Marsame Disposition of Materials and Equipment)
- ML19327A510 + (Procedure 0-00-5,Revision 8, Licensed Operator Qualification & Requalification Program)
- ML17342A997 + (Procedure 0-ADM-019, Mgt on Shift)
- ML17342B019 + (Procedure 0-ADM-019, Mgt on Shift (Mos), Weekly Summary Rept for Wk Starting 871024)
- 05000327/FIN-2009002-02 + (Procedure 0-MA-REM-000-001.0, Extended Station Blackout, Did Not Close Hydrogen Igniter Breakers)
- 05000327/FIN-2008003-02 + (Procedure 0-MA-REM-001.0, Extended Station Blackout, Does Not Close Hydrogen Igniter Breakers)
- ML073240592 + (Procedure 00256-C, Rev. 7.1, Radioactive Waste Minimization Program)
- ML20197D946 + (Procedure 01/108, Fit Electrodes to Insulator. W/Six Oversize Drawings)
- ML20210N046 + (Procedure 07.25.85.133, Bone Mineral Analyzer Single Photon Rectilinear Scanner Model SP2 Users Manual)
- ML18142A137 + (Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures)
- ML20091M683 + (Procedure 1.0, Project QA Plan. Related Info Encl)
- ML20076M698 + (Procedure 1000-PNL-40101, Gpu Nuclear Corp Radiation Protection Plan)
- ML20198E732 + (Procedure 1021, Test Procedure for Wyle High Flow Steam Sys Safety/Relief Valves:Recertification/Acceptance/Evaluation Testing)
- ML20037C815 + (Procedure 15, Incomplete Fire Mods)
- ML20126H362 + (Procedure 15, Procedure for Release of Scrap Metal & Equipment from Front Bldg)
- ML20126H380 + (Procedure 16, Procedure for Replacing Roof Sections on Old Cell Area Encl)
- ML20127M880 + (Procedure 16000 8409, Safe Operating Procedure for Tests of Large Containment Models at Containment Test Site)
- ML19224B291 + (Procedure 1670.9,Revision 4:radiation Emergency Drill)
- ML20126H065 + (Procedure 17, Procedure for Monitoring Source Storage Pool Sys & Maint of Filtration Sys)
- ML20126H421 + (Procedure 18, Procedure for Entry Into New Cell & Labyrinth Area)
- ML20126H086 + (Procedure 19 Decon Cleaning Vent Motor,To Be Used for Old Cell Ventilation Sys)
- ML022060222 + (Procedure 1903.060, Emergency Supplies & Equipment)
- ML20024A440 + (Procedure 2-0030133, Local Annunciator Summary)
- ML20127J416 + (Procedure 2-3-89-001, Safety Equipment Status Sys)
- ML20126H091 + (Procedure 20, Procedure to Seal Seams Inside Plastic Encl of Old Cell Area)
- ML20126H107 + (Procedure 21, Procedure for Shipment of Low Level Waste)
- ML20126H125 + (Procedure 22, Procedure to Attach Duct Work for Ventilation Sys to Encl)
- ML20126H136 + (Procedure 23, Entry & Exit of Encl Area by Personnel)
- ML20092P677 + (Procedure 23, Post-Trip Evaluation)
- ML20126H141 + (Procedure 24, Removal of Original Plastic Curtain Enclosing Old Cell Area)
- ML041200072 + (Procedure 2403.24, Perform 2D11 Station Battery Quarter)
- ML20126H151 + (Procedure 25, Survey of Old Cell Area After Removal of Old Cell)