Category:Report
MONTHYEARML18100A0142018-04-0404 April 2018 Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML21165A1172018-02-0606 February 2018 NX-503 Rev 0 Part 2 HBL-17-003, License Termination Plan Technical Basis Documents2017-07-0606 July 2017 License Termination Plan Technical Basis Documents HBL-14-017, Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes2014-06-10010 June 2014 Independent Spent Fuel Storage Installation Humboldt Bay Quality Assurance Plan Proposed Changes ML15210A7352014-02-28028 February 2014 Cultural Resources Monitoring Report No. 1, 08/2010 - 08/2013 DCL-13-094, and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask2013-09-30030 September 2013 and Humboldt Bay Power Plant, 10 CFR 71.95 Reports Regarding Energysolutions' Model 8-120B Shipping Cask ML14128A3952013-08-31031 August 2013 Cultural Resources Monitoring Report & Recommendations, Humboldt Bay Power Plant Decommissioning, Humboldt County, California ML15211A5142013-08-31031 August 2013 Cultural Resources Monitoring Report and Recommendations ML14177A2802013-07-31031 July 2013 Preliminary Wetland Delineation for the PG&E Humboldt Bay Power Plant Canal Remediation Project, Humboldt County California, Dated July 2013 HBL-13-002, Post-Shutdown Decommissioning Activities Report, Revision 42013-07-19019 July 2013 Post-Shutdown Decommissioning Activities Report, Revision 4 ML15211A5062013-07-15015 July 2013 Cultural Resources Inventory and Evaluation ML14177A2822013-07-15015 July 2013 Cultural Resources Inventory and Evaluation, Humboldt Bay Power Plant Decommissioning, Canal Remediation Project, Humboldt County, California, Dated July 15, 2013 ML13130A0092013-05-0303 May 2013 License Termination Plan, Revision 0, Evaluation Through Chapter 2 Site Characterization - East Side Site ML13130A0112013-05-0303 May 2013 License Termination Plan, Revision 0, Chapter 2 - Site Characterization, Appendix 2-C Hbpp Groundwater Monitoring Summary Through Chapter 6 Compliance with the Radiological Criteria for License Termination ML14128A3692012-10-0101 October 2012 Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report ML13130A1402012-09-26026 September 2012 in Situ Object Counting System (Isocs) as Applied to Scan Requirements in Support of Final Status Survey at Hbpp ML13130A1372012-07-11011 July 2012 Gross Activity Dcgl in Support of the Final Status Survey at Hbpp ML14128A1132012-06-28028 June 2012 Report - Decommissioning Capstone Document ML13130A1362012-06-13013 June 2012 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Hbpp ML13130A1392012-05-16016 May 2012 Radionuclide Selection for Dcgl Development, Attachment, a Dandd Calculation Reports ML13130A1382012-05-16016 May 2012 Radionuclide Selection for Dcgl Development HBL-12-004, 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 20112012-02-21021 February 2012 10 CFR 50.59 Report of Changes, Tests, and Experiments for the Reporting Interval of January 1, 2010, Through December 31, 2011 ML13130A1342011-07-31031 July 2011 Humboldt Bay Power Plant (Hbpp) Historical Site Assessment 2011 Update HBL-13-008, (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils2011-07-31031 July 2011 (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils ML11209B5382011-04-20020 April 2011 Confirmatory Survey Results for Portions of the Material and Equipment from Units 1 and 2 at the Hbpp. 2029-SR-01-0 ML14128A1112010-10-31031 October 2010 Mitigation Plan, Humboldt Bay Power Plant. Prepared by Jrp Historical Consulting in Response to California Energy Commission for Demolition of Units 1, 2, and 3. Revision Dated October 2010 ML1027005392010-09-17017 September 2010 Scan Action Limits ML1023005572010-08-11011 August 2010 E-mail Dated August 11, 2010, from David Sokolsky, Pg&E, to John Hickman, NRC, Regarding NRC Questions on Humboldt Bay 20.2002 Request Including Radiological Characterization Report ML1027005382010-06-25025 June 2010 Marsame Survey Package - Structural Steel ML1027005372010-03-10010 March 2010 Procedure - Marsame Disposition of Materials and Equipment ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML14128A1122009-07-31031 July 2009 Mitigation Plan, Humboldt Bay Power Plant in Response to California Energy Commission CUL-10 for Demolition of Units 1, 2 and 3 HBL-09-009, Post-Shutdown Decommissioning Activities Report, Revision 32009-06-30030 June 2009 Post-Shutdown Decommissioning Activities Report, Revision 3 ML0830800972008-09-16016 September 2008 Letter Dated September 16, 2008, Providing Background Information for Conference Call with Humboldt Bay on Soil Sampling of New Generation Site HBL-08-006, Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act2008-03-31031 March 2008 Post-Shutdown Decommissioning Activities Report, Revision 2, and Request for NRC Coordination of Section 106 of the National Historic Preservation Act ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers HBL-05-017, Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-0172005-05-27027 May 2005 Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-017 HBL-05-010, ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant2005-03-31031 March 2005 ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report ML15211A5102003-08-12012 August 2003 Cultural Resource Study for the PG&E Humboldt Bay Power Plant, ISFSI Licensing Project - Final Report HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest2002-12-27027 December 2002 Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig ML0336503802002-09-0505 September 2002 Data Report a, Revision 0, Geologic Mapping in the ISFSI Site Area. ML0336503842002-09-0505 September 2002 Data Report D, Revision 0, Trenches at the ISFSI Site. ML0336503862002-05-10010 May 2002 Data Report E, Revision 0, Soil Laboratory Test Data. ML0336503822002-05-10010 May 2002 Data Report C, Revision 0, Downhole Geophysics in ISFSI Site Area. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2018-04-04
[Table view] Category:Technical
MONTHYEARML18100A0142018-04-0404 April 2018 Submittal of Independent Confirmatory Survey Summary and Results for Survey Units OOL10-14 and NOL01-09 ML21165A1172018-02-0606 February 2018 NX-503 Rev 0 Part 2 HBL-17-003, License Termination Plan Technical Basis Documents2017-07-0606 July 2017 License Termination Plan Technical Basis Documents ML14128A3952013-08-31031 August 2013 Cultural Resources Monitoring Report & Recommendations, Humboldt Bay Power Plant Decommissioning, Humboldt County, California ML14177A2802013-07-31031 July 2013 Preliminary Wetland Delineation for the PG&E Humboldt Bay Power Plant Canal Remediation Project, Humboldt County California, Dated July 2013 ML14177A2822013-07-15015 July 2013 Cultural Resources Inventory and Evaluation, Humboldt Bay Power Plant Decommissioning, Canal Remediation Project, Humboldt County, California, Dated July 15, 2013 ML14128A3692012-10-0101 October 2012 Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report ML13130A1402012-09-26026 September 2012 in Situ Object Counting System (Isocs) as Applied to Scan Requirements in Support of Final Status Survey at Hbpp ML13130A1372012-07-11011 July 2012 Gross Activity Dcgl in Support of the Final Status Survey at Hbpp ML14128A1132012-06-28028 June 2012 Report - Decommissioning Capstone Document ML13130A1362012-06-13013 June 2012 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Hbpp ML13130A1392012-05-16016 May 2012 Radionuclide Selection for Dcgl Development, Attachment, a Dandd Calculation Reports ML13130A1382012-05-16016 May 2012 Radionuclide Selection for Dcgl Development HBL-13-008, (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils2011-07-31031 July 2011 (Hbpp) Historical Site Assessment 2011 Update, Appendix E, 2008 Characterization Results for Surface and Subsurface Soils ML13130A1342011-07-31031 July 2011 Humboldt Bay Power Plant (Hbpp) Historical Site Assessment 2011 Update ML14128A1112010-10-31031 October 2010 Mitigation Plan, Humboldt Bay Power Plant. Prepared by Jrp Historical Consulting in Response to California Energy Commission for Demolition of Units 1, 2, and 3. Revision Dated October 2010 ML1027005392010-09-17017 September 2010 Scan Action Limits ML1027005382010-06-25025 June 2010 Marsame Survey Package - Structural Steel ML1027005372010-03-10010 March 2010 Procedure - Marsame Disposition of Materials and Equipment ML1000701172009-11-19019 November 2009 Oak Ridge Institute for Science and Education, Final Report - Radiological Survey for New Generation Footprint Area Plant Soils at Humboldt Bay Unit 3 ML14128A1122009-07-31031 July 2009 Mitigation Plan, Humboldt Bay Power Plant in Response to California Energy Commission CUL-10 for Demolition of Units 1, 2 and 3 ML0830800972008-09-16016 September 2008 Letter Dated September 16, 2008, Providing Background Information for Conference Call with Humboldt Bay on Soil Sampling of New Generation Site HBL-05-017, Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-0172005-05-27027 May 2005 Enclosure 3, Spent Fuel Pool Physical Inspection and Enclosure 4, Engineering Review of Control and Accountability of Modified Fuel Assemblies at Humboldt Bay Power Plant, to PG&E Letter HBL-05-017 HBL-05-010, ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant2005-03-31031 March 2005 ATI Consulting Report Evaluation of Nuclear Fuel Rod Fragments and Inference to Fuel Rod A-49 at Humboldt Bay Power Plant ML0420503102004-07-22022 July 2004 Request for Additional Information on License Application and Safety Analyses Report HBL-14-008, Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Invest2002-12-27027 December 2002 Enclosure 9: Technical Report TR-HBIP-2002-01, Seismic Hazard Assessment for the Humboldt Bay ISFSI Project. Appendix 9A-42 to End. Enclosures 10 & 11: Humboldt Bay Power Plant Tritium Evaluation and DECON-POS-HOS-H011, Groundwater Investig ML0336503802002-09-0505 September 2002 Data Report a, Revision 0, Geologic Mapping in the ISFSI Site Area. ML0336503842002-09-0505 September 2002 Data Report D, Revision 0, Trenches at the ISFSI Site. ML0336503862002-05-10010 May 2002 Data Report E, Revision 0, Soil Laboratory Test Data. ML0336503822002-05-10010 May 2002 Data Report C, Revision 0, Downhole Geophysics in ISFSI Site Area. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences 2018-04-04
[Table view] |
Text
U I Nuclear Power Generation NUMBER RCP-6Q VOLUME 7 Humboldt Bay REVISION 0 EFFEC DATE 3-15-10 Power Plant PAGE 1of 6 TITLE APPROVED BY MARSAME DISPOSITION OF MATERIALS AND EQUIPMENT ORIGINAL SIGNED 3-10-10 DEPARTMENT MANAGER I DATE (Procedure Classification - Quality Related)
Level of Use - Reference 1.0 SCOPE 1.1 This procedure describes the HBPP program for the disposition of materials and equipment utilizing the MARSAME protocol.
1.2 The scope of MARSAME is material and equipment (M&E) potentially affected by radioactivity, including metals, concrete, tools, equipment, piping, conduit, furniture and dispersible bulk materials such as trash, rubble, roofing materials, and sludge.
1.3 This procedure represents the methodology for determining the disposition of materials and equipment, as outlined in NUREG-1575, Supp. 1, "Multi-Agency Radiation Survey and Assessment of Materials and Equipment Manual (MARSAME)" [5.1].
2.0 DISCUSSION 2.1 NUREG-1575, Supp. 1 provides the following:
2.1.1 The technical information on approaches for planning, implementing, assessing, and documenting surveys to determine proper disposition of materials and equipment 2.1.2 The increased flexibility of MARSAME comes with increased complexity. The goal of the MARSAME roadmap is to assist the MARSAME user in negotiating the information in MARSAME and determining where important decisions need to be made on a project-specific basis, as summarized in Roadmap Figure 7.1.
2.1.3 Records of MARSAME dispositional analyses, the supporting surveys and documentation must be retained.
2.1.4 This procedure provides a formalized process for documenting evaluations for release of potentially radiologically impacted material and equipment from the HBPP site, including inside the RCA in accordance with RCP-6B, Release of Solid Materials from Radiologically Controlled Areas.
NUCLEAR POWER GENERATION DEPARTMENT NUMBER RCP-6Q VOLUME 7 TITLE MARSAME RELEASE OF MATERIALS AND REVISION 0 EQUIPMENT PAGE 2 of 6 3.0 RESPONSIBILITIES 3.1 The Radiation Protection (RP) Manager is responsible for maintenance of records associated with the disposition of M&E.
3.2 Qualified Radiation Protection Technicians are responsible for surveys performed in support of MARSAME disposition of materials and equipment.
4.0 INSTRUCTIONS Note An approved standard procedure or an approved M&E-specific work package/plan should control MASAME release surveys. The approved standard procedure or the approved work package/plan should include the planning elements in steps 4.1 through 4.5.
4.1 Initial Assessment 4.1.1 Conduct an initial assessment (IA) of M&E:
- Review relevant operational and maintenance records
- Review previous survey results
- Review radiological incident reports
- Perform a visual inspection.
4.1.2 During the visual inspection, identify potential safety issues and required preparation activities associated with the M&E.
Note Sentinel measurements are biased measurements performed at key locations to provide information specific to the objectives of the IA, which is to gather sufficient information to support a categorization decision.
4.1.3 Ensure the collection of enough information during the IA to clearly describe the M&E and support a categorization decision and potential disposition decisions for the M&E (e.g., release or burial).
4.2 Categorization Note Non-impacted is a MARSAME term that applies to M&E where there is no reasonable potential for the presence of radioactivity above background. Impacted M&E have a reasonable potential for radioactive contamination or there is not enough information to support a "non-impacted" categorization decision.
NUCLEAR POWER GENERATION DEPARTMENT NUMBER RCP-6Q VOLUME 7 TITLE MARSAME RELEASE OF MATERIALS AND REVISION 0 EQUIPMENT PAGE 3 of 6 4.2.1 Based on information from the IA, categorize the M&E as either impacted or non-impacted.
4.2.2 Non-impacted M&E do not require additional investigation, but may require documentation of the justification for the non-impacted decision.
4.3 Classification Note Classification applies only to impacted M&E. Class 1 M&E have the highest potential for radioactivity above the action level. Class 2 M&E have low potential for radioactivity that exceeds the action level and little or no potential for small areas of elevated radioactivity.
Class 3 M&E have little or no potential for radioactivity above background and insufficient evidence to support categorization as non-impacted.
4.3.1 Based on information from the IA, classify the impacted M&E as Class 1, 2, or 3.
4.4 Data quality objectives (DQOs):
Note The DQO process, as described in MARSSIM [5.2], should be applied in planning for radiological surveys for disposition of M&E. DQOs are qualitative and quantitative statements that clarify technical and quality objectives of the survey, define the type of data, and specify tolerable levels for decision errors.
4.4.1 Initiate the DQO process and ensure that DQOs that must be met during the survey of the M&E are defined. Include the following in the DQO process:
- 1. Problem statement:
- Develop a concise description of the problem
" Identify team members and the decision-maker
" Specify available resources for the survey
- 2. Identify the decision:
- Define the question that the survey will resolve and identify alternative actions that may be taken based on the outcome of the survey.
- 3. Identify the input required for the decision
- Type and sensitivity of measurements
- 4. Define the survey boundaries
NUCLEAR POWER GENERATION DEPARTMENT NUMBER RCP-6Q VOLUME 7 TITLE MARSAME RELEASE OF MATERIALS AND REVISION 0 EQUIPMENT PAGE 4of6
- 5. Decision rule:
- The decision rule is an "if...then..." statement consisting of three parts:
the action level(s), parameter of interest, and alternative actions.
- 6. Limits on decision errors 4.5 Measurement quality objectives (MQOs):
4.5.1 Develop MQOs to evaluate the survey design, focusing on the following:
- The measurement method uncertainty at a specified concentration expressed as a standard deviation
- The measurement method's detection capability expressed as the minimum detectable concentration
- The measurement method's range, which defines the measurement method's ability to measure the radionuclide or radiation of concern over some specified range of concentration or activity
" The measurement method's specificity, which refers to the ability of the measurement method to measure the radionuclide or radiation of concern in the presence of interferences and
" The measurement method's ruggedness, which refers to the relative stability of measurement method performance for small variations in measurement method parameter values
.4.6 Preliminary Surveys Note A preliminary survey is any survey performed prior to a MARSAME disposition survey and is generally performed to collect information required to support the design of the disposition survey. If the data are adequate, no additional data collection is required.
4.6.1 Based on information from the IA, determine if a preliminary survey is necessary to fill data gaps..
4.6.2 If necessary, perform a preliminary survey in accordance with an applicable standard procedure or develop a preliminary survey plan using the planning elements in steps 4.1 through 4.5. Otherwise, proceed to step 4.7.
NUCLEAR POWER GENERATION DEPARTMENT NUMBER RCP-6Q VOLUME 7 TITLE MARSAME RELEASE OF MATERIALS AND REVISION 0 EQUIPMENT PAGE 5 of 6 4.7 Disposition Survey Note Disposition survey designs will incorporate scans, static measurements, or a combination of both to support the disposition decision.
4.7.1 Perform the disposition survey in accordance with an applicable approved standard procedure or develop a disposition survey package/plan using the planning elements in steps 4.1 through 4.5. A sample format for the disposition survey package/plan is shown in Attachment 7.2.
4.7.2 Ensure that the disposition survey package/plan documents the following:
S Survey design S Action level(s)
S Operational decision rule S Classification of the M&E S Number and type of measurements S Quality requirements for the measurements 4.7.3 Conduct and document the disposition survey in accordance with the approved survey package/plan and/or the approved standard procedure.
4.8 Evaluate the Results Note The data quality assessment (DQA) process is a scientific and statistical evaluation that determines whether data are the type, quality, and quantity to support their intended use.
When individual measurement results are not recorded, as allowed in some scan-only survey designs, the preliminary data review will be brief and based primarily on the results of quality control (QC) measurements.
4.8.1 Initiate the DQA process to evaluate the survey results:
S Verify that the DQOs were met in the survey S Review QA and QC reports S Verify MDC and MQOs were met S Verify that the appropriate number of measurements were collected
NUCLEAR POWER GENERATION DEPARTMENT NUMBER RCP-6Q VOLUME 7 TITLE MARSAME RELEASE OF MATERIALS AND REVISION 0 EQUIPMENT PAGE 6 of 6 4.8.2 Conduct a preliminary data review:
- Perform a graphical review of the data, if applicable
- Calculate basic statistical quantities
- Compare survey results to release criteria 4.8.3 Draw conclusion from the data.
4.9 Disposition Decision 4.9.1 Based on the outcome of step 4.8, make a decision regarding the planned disposition option or alternative actions for the M&E.
4.10 Documentation 4.10.1 All documentation including the IA, preliminary surveys, sentential surveys, disposition survey and disposition decision will be archived as permanent RP survey records.
5.0 REFERENCES
5.1 NUREG- 1575, Supp. 1, "Multi-Agency Radiation Survey and Assessment of Materials and Equipment Manual (MARSAME)"
5.2 NUREG-1575, "Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM)"
6.0 APPENDICES None.
7.0 ATTACHMENTS -
7.1 Overview of MARSAME Process 7.2 Sample format for Disposition Survey Package/Plan 8.0 RECORDS Records created as described in this procedure are quality records and shall be processed as described in HBAP E-1, "Retention and Storage of HBPP Unit 3 and ISFSI Records".
9.0 RESPONSIBLE ORGANIZATION Radiation Protection
RCP-6Q Attachment 7.1 Rev. 0 Page 1 of 1 Attachment 7.1 Overview of MARSAME Process
RCP-6Q Attachment 7.2 Rev. 0 Page 1 of 4 Attachment 7.2 Sample Format for Disposition Survey Package/Plan Title Page
RCP-6Q Attachment 7.2 Rev. 0 Page 2 of 4
1.0 INTRODUCTION
2.0 OBJECTIVE 3.0 INITIAL ASSESSMENT 4.0 CATEGORIZATION 5.0 CLASSIFICATION
6.0 DESCRIPTION
Table 6. 1 Physical Attributes of M&E Attribute Description Dimensions:
Height (ft)
Diameter (ft)
Volume (gal)
Complexity Accessibility Inherent value Table 6. 2 Radiological Attributes of M&E Attribute Description Data Gaps Radionuclides Principle Emission Emission Energy Particle (MeV)
Activity Distribution Location 7.0 PRELIMINARY SURVEYS 8.0 DISPOSITION OPTION
RCP-6Q Attachment 7.2 Rev. 0 Page 3 of 4 9.0 SURVEY DESIGN 9.1 Null Hypothesis 9.2 Limits on Decision Errors 9.3 Decision Rule 9.4 Alternative Actions 9.45 Radionuclides-of-Concern 9.56 Action Levels 9.67 Survey Type 9.67.1 Measurement Techniques 9.6.2 Special Instructions 9.6.3 Measurement Quality Options 9.6.3.1 Measurement Uncertainty 9.6.3.2 Detection Capability Critical Value:
Minimum Detectable Net Instrument Count:
MDC for static measurement:
Minimum Detectable Count Rate for Scans:
Minimum Detectable Concentration for Scans:
9.6.3.3 Range 9.6.3.4 Specificity 9.6.3.5 Ruggedness 9.78 Survey Boundaries 9.9 Preparationand Special Instructions 9.810 QA Requirements 9.911 Survey Units 9.1012 Inputs for the Selection of ProvisionalMeasurement Methods 9.1113 Reference Area 9.1214 Optimization of the Survey Design 9.1315 Documentation of the Survey Desicn
RCP-6Q Attachment 7.2 Rev. 0 Page 4 of 4 10.0 SURVEY IMPLEMENTATION 10.1 Job HazardAnalysis 10.2 Survey Area PreparationVerification 11.0 SURVEY RESULTS 11.1 Survey Data 11.2 Data Quality Assessment 12.0 DECISION Prepared By: Date:
Reviewed By: Date:
Approved By: Approvd By:Date:
Date: