~acil'ity: AN0 ARKANSAS NUCLEAR ONE Unit  : 2 Project :

W/O Type: PM Priority: 4 W/O Dspln: ELEC Planner : EWILLI3 WILLIAMS E W/O Title  : PERFORM 2Dll STATION BATTERY QUARTER W/O Task

Title:

PERFORM 2Dll STATION BATTERY QUARTER MASTER Written To  : PROC 2403.24 PROCED Rpt : TIPMCll Task Dspln  : ELEC Completed By: 20031230 Date: 12/09/03 Page : 1 Facility : AN0 Unit  : 2 op sys :

Division : Area Sys/Cls:

Equipment : Component:

Work Item : 2403.24PROCEDAA Eqt. List: 2403.24PAA 000 Ops Review Reqd: J Equip. Tag: Alt:

UTC Tbl/Brkdwn: (Past 12 mo)

Catalog ID: Job Type : ST UCR: 6 Client/Act:

Location : RAB 50031283 RAB 372 COL D LINE 5.8 EL RM 2103 Cost Centr: A2B Activity : PRSS User Def:

Percentage: 100.000 Acct No. : GL AN2 RWP Required Contain Closure : Doc Pkg : A Mode:

Contain Integrity: Q Group QA Grade:

Train Status NCR TS/SLC Related  : Tech Spec Action:

Maintenance Rel. : Y LC0  : N Tech Spec Date:

Detection Symptom Failure/Date :

Discovery Status : Plant Effect: Sys Effect Ctrl Rm Comm Reqd: Y Ctrl Rm Name/Signature:

      • DESCRIPTION***

PERFORM 2Dll STATION BATTERY QUARTERLY TEST PER 2403.024.

      • DESCRIPTION END***

CHAINING: MODEL WORK ORDER NBR-50242146 PMID/RQ--

Deficiency Tag No.:

Rework Job LOC:

Comments :

Tag Removed:

I, NO QC REQUIREMENTS FOR THE WORK ORDER TASK

I] ~acility: AN0 ARKANSAS NUCLEAR ONE Unit  : 2 Project :

W/O Type: PM Priority: 4 W/O Dspln: ELEC Planner : EWILLI3 WILLIAMS E W/O Title  : PERFORM 2Dll STATION BATTERY QUARTER W/O Task

Title:

PERFORM 2Dll STATION BATTERY QUARTER MASTER Written To  : PROC 2403.24 PROCED Ri3t : TIPMCll Task Dspln  : ELEC Completed By: 20031230 Date: 12/09/03 Page: 2 PRO Number: 2403.24 Sheet: 0 2Dll QUARTERLY SURVEILLANCE Image: Y PRO Number: OP-2403.024 Sheet :

OP-2403.024 Image: Y PRO Number: OP-2403.052 Sheet:

OP-2403.052 Image: Y TM Number: TMC173 0010 Sheet:

TMC173 0010 Image: Y Equip List Rev Equip List Description 2403.24PAA 000 2403.24 PROCED Seq Fac Unit Op Sys Division Area System Class AN0 2 2D NA RAB Equipment: BATTRY 2D-11 Name  : BATTERY BANK Loc Desc: RAB 372 COL D LINE 5.8 EL RM 2103 Exception Reason:

I Comments :

Completion Comments Required  : Y Comments :

m

~ a c i i i t ~ :ANO ARKANSAS NUCLEAR ONE Unit  : 2 Project :

W/O Type: PM Priority: 4 W/O Dspln: ELEC Planner : EWILLI3 WILLIAMS E W/O Title  : PERFORM 2Dll STATION BATTERY QUARTER W/O Task

Title:

PERFORM 2 D l l STATION BATTERY QUARTER MASTER Written To  : PROC 2403.24 PROCED Rot : TIPMCll Task Dspln  : ELEC Completed By: 20031230 Date: 12/09/03 Page: 3 I Completion Comments Required  : Y I

I Continued on Additional Sheets? :

I I M&TE Used: N Check Out Return Check Out Return DSG- 002.-

DLV- DO&

          • E N D O F R E P O R T *****

Entergy Operations, Inc. Entity 2403 .24 PROCED PERFORM TASK Repetitive work A C ~ .

Maintenance - Manf.

Md. #

MA1 # I Task No. ( Discipline 1 IMPACT STATEMENT THE COMPONENT, WITHIN THlS SYSTEM HAS BEEN DEEMED TO BE OF HIGH IMPACT AND HIGH ACTIVITY.

MAINTENANCE TO BE PERFORMED / STATUS OF SYSTEM, STRUCTURE OR COMPONENT DURING MAINTENANCE I PRE-MAICNTENANCE TESTING REQUIREMENTS:

2304.024 provides the guidance to obtain Cell voltages, overall bank Voltage Temperature, Specific Gravity of each cell, electrolyte Level of each Cell and DLRO ( connection resistance readings ) for 2D-11.

There is no impact to operability during performance of this task. If Cell voltage, Specific Gravity, or Bank voltage are out of spec then T.S. 3.8.2.3 could apply.

COMPENSATORY I CONTINGENCY ACTIONS:

NONE RELATED TECHNICAL SPECIFICATIONS I TECHNICAL IWQLTIREMENTS MAhUAL:

3.8.2.313.8.2.4 LIMITING CONDITION FOR OPERATION (LCO) ACTION:

TRAIN I LOOP: RED TRAIN SURVEILLANCE.

PLANT MODE:

WILL ACTIVITY BREACH SECURITY BARRIER/ FIRE BARRIER /DOOR? (COPD-3 DOOR BREACH CHECK LIST) NO CONTROL ROOM ANNUNCZATORS: NONE WILL THlS WORK EFFECT THE DECAY HEAT / SHUTDOWN COOLANT SYSTEMS? NO REACTIVITY MANAGEMENT Date Printed: 12/09/03 3:30:00 PM Page 1 of 2

ENTERGY OPERATIONS INCORPORATED ARKANSAS NUCLEAR ONE When you see these TRAPS Get these TOOLS Time Pressure Effective Communication Distractionllnterruption Questioning Attitude Multiple Tasks Placekeeping Overconfidence Self Check Vague or Interpretive Guidance Peer Check First ShiWLast Shift Knowledge Peer Pressure Procedures Changeroff Normal Job Briefing Physical Environment Coaching Mental Stress (Home or Work) Turnover

'ORM TITLE: I FORM NO. I CHANGE NO.

VERIFICATION COVER SHEET I 1000.006A 1 050-00-0

PAGE:

2403.024 2D11 QUARTERLY SURVEILLANCE CHANGE: 012-01-0 7.0 PREREQUISITES AND INITIAL CONDITIONS 7.1 Verify that the test equipment listed in Section 5.0 has a @fl//q$?fO~

current calibration date.

7.2 Verify that 2Dll and its charger system are in operation prior to performing this procedure.

zlb3 7.3 Verify that the exhaust fans in rooms affected by 2Dll are in operation.

7.4 The following protective equipment shall be available to personnel who perform the battery surveillance:

7.4.1 Goggles and plastic face shield (when measuring electrolyte or cleaning).

7.4.2 Acid proof gloves (When measuring electrolyte or cleaning).

7.4.3 Protective aprons and acid suits (when measuring electrolyte or cleaning).

7.4.4 water for rinsing in case of acid spillage.

7.4.5 Bicarbonate of soda or other acid neutralizing aaent .

4--

7.5 Verify that the Unit 2 Operations Shift Manager has been notified that the work is ready to start and that his authorization has been given 7.6 Verify that battery bank 2D12 and its charger are operable prior to performing the maintenance/surveillance of 2Dll.

NOTE During normal float operation, the battery charger is adjusted to maintain 2.20 to 2.25 volts per cell. (127.6 to 130.5 volts for a 58 cell bank) 7.7 Verify that battery 2Dll is on normal float charge and has 2/03 not been on an equalize charge for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to performing this procedure, or as directed by System Engineer.

7.8 Verify all Torque Wrenches have been checked on Torque Tester prior to performance of this procedure.

1 PROCJWORK PLAN NO. I PROCEDUREWORK PLAN TITLE: I PAGE: 7 of 55 I 2 D l l QUARTERLY SURVEILLANCE 8.0 INSTRUCTIONS I1 NOTE Immediately notify the Cognizant Supervisor and/or Shift Manager IF Procedural Tolerances are not met to ensure compliance with LC0 and Tech Specs.

8.1 QUARTERLY INSPECTION OF THE 2Dll STATION BATTERIES 8.1.1 Measure the total bank float voltage.

A. Set the Fluke multi-meter or equivalent up to measure a DC voltage on the 200 volt range.

B. Connect the meter test leads to the "Common" and "Volts" test lead jacks.

C. Connect the positive test lead of the multi-meter (this is the lead plugged into the "Volts" jack) to the positive terminal of the battery bank.

D. Connect the negative test lead of the multi-meter (this is the lead plugged into the "Common" jack) to the negative terminal of the battery bank.

During normal float operation, the 2Dll battery bank should be maintained in a voltage range of 127.6 to 130.5 volts. The Electrical Maintenance Supervisor shall be notified if the 2Dll battery bank is not within this range before proceeding.

E. Read the voltage value displayed on the multi-meter and record this value below VDC ACCEPTANCE F. IF the measured bank voltage of the 2Dll y/fi 1 qfl CRITERION was less than 124.7 W C .

3initiate a Condition Report and immediately notify the Cognizant Supervisor and Shift Manager that a Tech Spec limit has been exceeded, IF the battery bank voltage is equal to or greater than 124.7 VDC.

mark this step N/A.

PROC.NVORK PLAN NO. PROCEDUREWORK PLAN TITLE:

2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 D. Read the voltage value displayed on the multi-meter and record the value in column A of Data Sheet 1.

ACCEPTANCE -IF any cells voltage is less than 2.071 YDC, CRITERION -

TREN immediately notify the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for Operation has been exceeded and initiate a Condition Report.

-IF cell voltages are greater than 2.071 MC, THEN proceed with test.

SECOND PERSON VERIFIER A Second Person Verifier shall verify that voltagqyal~e-e properly recorded in step 8.1.2.D for all cells.

Second Person Verifier fiate 12-03 8.1.3 Measure the cell temperature of each individual cell CAUTION Use extreme caution when insertins and removina the thermometer from the sampling tube to avoid breaking the thennomete;. If breakage occurs and I

parts of the thermometer remain in the battery, the Cognizant Supervisor should be notifled as soon as possible.

NOTE When using the Fluke model 51 DT to take temperature measurements, the DT and probe to be used must have a pre cal performed by the Met Lab before use and a post cal after use in the temperature range it is going to be used in.

A DSG (Digital Specific Gravity Meter) may be used.

1 NOTE A Second Person shall observe, sign and verify after completion, that steps B through D have been completed for all cells and this value recorded on Data Sheet 1.

NOTE Repeat steps 8.1.3.B through 8.1.3.D until all the individual cells have been measured.

1 NOTE If two ( 2 ) thermometers are used, one may be used for half the cells and the second for the other half of the cells. (i.e. 1-28. 29-58].

r PROC.IWORK PLAN NO.

2403.024 PROCEDURWORK PLANTITLE:

2 D l l QUARTERLY SURVEILLANCE A. Fa PAGE'.

CHANGE:

digital hydrometer will be used to 10 of 55 012-01-0 measure specific gravity in step 8.1.5, 4 2go to step 8.1.4; IF NOT, THEN perform the following steps.

B. Place the thermometer in the sample tube of the individual cell being measured.

ZF the front sauqle tube is bent or hroken, THEN the Thermometer may be placed in the rear sample tube.

C. Leave the thermometer in the cell being measured for 15 seconds. (This will allow the reading to stabilize.)

D. Record the temperature to the nearest 1/10 "F in column A of Data Sheet 2.

IF any cell temperature deviates more than 3OC (sop)from the other cells during this inspection,

-notify the Cognizant Supervisor, THEN IF NOT,

-mark this step N/A.

Superv~sorRemarks:

/-

//

/ &-

(

SECOND PERSON VERIFIER A Second Person Verifier shall verify that properly recorded in step 8.1.3.D for all cells.

E. any cells have bent or broken sbmple tubes, or broken thermometer parts in the cell.

-THEN record the cell number in the space orovided below.

AND notify the Cognizant Supervisor.

IF NOT,

-THEN mark this step N/A.

Supervisor Remarks:

+&

PROC.IWORKPLAN NO. PROCEDURWORK PLAN TITLE:

2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 8.1.4 Measure the electrolyte level of each individual cell.

NOTE The electrolyte level shall be measured from the maximum (hi) level line.

The levels above the maximum (hi) level line should be recorded as positive and the levels below the maximum (hi) level line should be recorded as negative. Example: 1/8 inch above the maximum (hi) level line is recorded as plus + 1/8, 1/4 inch below the maximum (hi) level line is recorded as minus - 1/4.

NOTE A Second Person shall observe, sign and verify after completion, that step 8.1.4.A has been completed for all cells and this value recorded on Data Sheet 2.

NOTE 1 I Repeat step 8.1.4.A until all the individual cells have been measured.

I A. Measure the electrolyte level of the cells using a non-conducting ruler and record the readings in column B of Data Sheet 2 .

Electrolyte level shall be above the minimum (low) level indication mark and equal to or less than 1/4" above the maximum (hi) level indication mark.

-IF electrolyte level is within s~ecifiedranees.

-THEN initiate-a condition Report and immediately notify the Counizant Supervisor and Shift hlanager-that a Tech Spec iimit has been exceeded.

-IF electrolyte level within specified ranges, THEN proceed with test.

SECOND PERSON VERIFIER A Second Person Verifier shall verify that Electrolyte level was properly measured and recorded in step 8.1.4.A for-ls.,

I 12-12-03 Second/Person Verifier Date

PROCmORK PLAN NO.

2403.024 PROCEDUREMORK PLAN TITLE:

2D11 QUARTERLY SURVEILLANCE PAGE:

CHANGE: 012-01-01 i y o f 55 I. Remove the hydrometer from the sample tube and empty the electrolyte in the filler vent located in the center of the cell.

SECOND PERSON VERIFIER A Second Person shall verify that specific measured and recorded on Data Sheet 2.

8.1.6 Check for corrosion and measure the resistance of each inter-cell, Terminal plate to cable connection, terminal plate to battery connection and inter-tier connection.

CAUTION

-IF the resistance readings measured are greater than or equal to 150 micro-ohms, we have entered into a 2-hour action statement.

AND the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> begins from the time that the condition is found, THEREFORE, prompt notification to the Shift Manager for a determination is NOTE A Second Person shall observe, s q n and verify after completion, that steps A and B have been completed for all cells and recorded on Data Sheet 4.

A. Measure the resistance of each inter-cell connection, terminal plate to cable connection and terminal plate to battery connection and inter-tier connection using Supplement 1 and document "AS FOUND" readings on Data Sheet 4.

SECOND PERSON VERIFIER A Second Person shall verify/sign on "AS FOUNDw Da step A above has been completed for all cells.

/ [z-(Z-O~

S?eVcond~e?&n Verifier Date

PLAN NO.

2403.024 PROCEDURElWORKP U TITLE:

2D11 QUARTERLY SURVEILLANCE 1 PAGE:

CHANGE:

14 of 55 012-01-0 B. Inspect each inter-cell connection, terminal plate to cable connection, termlnal plate to battery connection and inter-tier connection for corrosion.

-IF corrosion is found, THEN proceed to Supplement 1 Section 2.0 for corrective action.

-IF no corrosion is found, THEN proceed with test.

SECOND PERSON VERIFIER A Second Person shall verlfy/sign that step B above completed for all cells.

8.1.7 Inspect the battery for the following items. Record the results of the inspection and any actions taken below:

NOTE Additional notes may be attached if the space provided for comments is insufficient 1

NOTE The items listed below are related to Technical Specifications 4.8.2.3, Section C-1 and any deficiencies found are to be reported to the Cognizant Supervisor, System Engineering and Shift Manager for an evaluation.

A. Inspect the battery for the following:

1. General cleanliness
a. Remove any electrolyte spillage on cells, covers, containers, battery racks, etc., with a solution of one pound of baking soda to one gallon of water followed by a clear water rinse

PROCSWORK PLAN N

O. PROCEDURE

NVORK P W TITLE: PAGE: 15 of 55 2403.024 2D11 QUARTERLY SURVEILLANCE CHANGE: 012-01-0 B. Check each cell for the following:

1. Container cracks.
2. Electrolyte leakage.
3. Internal contamination or buildup of sediment in bottom of cells.

NO/V& 7*T z5 A&&)

&? I z/I?-,h3 I NOTE

..-- I Battery Electrolyte attacks all copper and cupric alloys, causlng copper to deposit on the negative plates of the affected cell. The first typlcal indication of copper contamination is the discoloration, a pinkish-red color, of the negative plates and straps, and as the contamination progresses, the discoloration works its way down the negative plates. This condition can quickly lead to loss of battery capacity and serious deterioration.

C. Check the cell plates of each cell for the following:

1. Plate growth (foreign material on the plate).
2. Plate buckling.
3. Plate or electrolyte discoloration.
4. Grid cracks.
5. Copper contamination on the negative plates.
6. Battery degradation (positive plates being eaten away and crumbling).

D. Check the flame arrestor of each cell and record the cell numbers and disposition below when any white substance is found in the body of the flame arrestor of any cell.

-IF any white substance is found in the body of the flame arrestor.

THEN clean the flame arrestor with water IF NOT, THEN mark this step N/A.

PROC.!WORK PLAN NO. PROCEDURENVORK PLAN TITLE: PAGE: 160f55 I 2403.024 2D11 QUARTERL~SURVEILLANCE CHANGE: 012-01-0 E. Inspect and clean, as necessary, the battery room ventilation louvers, and record the inspection results and any corrective action taken below.

F. Check the battery racks visually to verify that all hardware is in place, no damage exists and there is no corrosion present.

-IF any discrepancies are found, THEN contact the Cognizant Supervisor and Issue a Work Document to have the racks repaired. Record the results and any corrective action below.

G. Check all cells for crazins (fine surface cracks) or cracking at the intersection of the internallv-molded rib in the bottom of the container and the side wall.

H. F any deficiencies were noted in steps 8.1.7.A through 8.1.7.G, THEN notify the Cognizant Supemisor for an evaluation of whether a Condition Report should be written; IF NOT, m a r k this step N/A.

Supervisors comments:

y/& / fl/&

8.2 CALCIJLATING CORRECTED VALTJES AND ASSESSING CORRECTED VALUES 8.2.1 Make a copy of the uncorrected data sheets and have an independent calculation done for comparison 8.2.2 Attach the copies to this procedure. 2/03 NOTE Attachment 1 shall be used to obtain the temperature correction factor, level correction factor and the corrected specific gravity needed in step 8.2.3 and 8.2.4.

8.7~7 Enter the temoerature correction factor (column 1

D) and the 1e;el correction factor (colu& E) for each cell on Data Sheet 2, obtaining the correction factors needed from Attachment 1.

PROC.MIORKPLAN NO. PROCEDURWORK PLAN TITLE: PAGE: 17 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 8.2.4 Calculate the corrected specific gravity using the formula on Attachment 1, and record the results in column F on Data Sheet 2.

NOTE The average cell temperature should be rounded off to the nearest 1/10 OF.

8.2.5 Add all the cell temperatures together and divide by the number of readings from the cell temperatures recorded on Data Sheet 2, and record the average cell temperature on Data Sheet 1.

A. If the average cell temperature is 6 5 OF or below, Then notify the Cognizant Supervisor for resolution If not,

-mark this Step N/A Then ACCEPTrnCE CRITERION B. g the average cell temperature is 6 or below, 0

. q/f THEN immediately inform the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for erati ti on has been exceeded and initiate a condition Report. (The battery is inoperable and must be restored within two

. . hours.)

(2)

IF NOT,

-ark this step N/A.

The average cell temperature recorded in step 8.2.5, and the formula on Data Sheet 1 must be used to find the temperature correction factor in Step 8.2.6.

8.2.6 Find the individual cells Temperature Correction Factors to determine corrected voltages and record on Data Sheet 1 Column "B" .

A. Perform a comparison of each individual cell's temperature with the average cell temperature recorded in step 8.2.5. All cells with a temperature less than or equal to the average cell temperature shall have

" 0 " entered as the Temperature correction Factor.

PROCEDURWORK PLAN TITLE:

2Dll QUARTERLY SURVEILLANCE CHANGE: 012-01-0 B. Find the Temperature Correction Factor for the remaining cells by using cell temperature from Column "A" Data Sheet 2 and Temperature Correction Factor information from Data Sheet 1.

8.2.7 Calculate and record the corrected cell voltage in Column C of Data Sheet 1, using the formula on Data Sheet 1.

8.2.8 Electrolyte Level A. Record the cell number(s) of any cell that meets the following conditions. (If none, indicate none)

1. Below or above Technical Specification Allowable Value.
a. Record any cell (s) with a liquid level below the top of the plates.
b. Record any cell(s) with liquid overflowing the top of the cell ACCEPTANCE CRITERION top of the plates or overflowing the top of the cell, THEN immediately notify the Unit 2 Operations Shift Manager and the Electrical Maintenance Supervisor that a Limiting Condition for Operation has been exceeded and initiate a Condition Report. (The battery is inoperable and must be restored within two ( 2 ) hours.)

IF NOT,

-THEN mark this step N/A.

PROC.NVORK PLAN NO. PROCEDURBWORK PLAN TITLE: PAGE: 190f55 (

2403.024 2D11 QUARTERLY SURVEILLANCE CHANGE: 012-01-0

2. Below or above Technical Specification Limits. (Refer to Data Sheet 2)

Record any cell(s) with a liquid level at or below the minimum line.

Record any cell(s) with a liquid level more than 1/4" above the maximum level line.

IF the liquid level of any cell is at or below the minimum line or more than 1/4" above the maximum line, THEN notify the W i t 2 Operations Shift Manager that a Limiting Condition for Operation has been entered and initiate a Condition Report. (The liquid level must be restored above the limits within seven ( 7 ) days.)

IF NOT, mark this step N/A.

3. Maintenance Limits
a. Record any cell(s) with a liquid level equal to or more than 1/2" below the maximum level mark.

steps 8.2.8.A.1 through 8.2.8.A.3, THEN verify that action has been initiated to restore the liquid level to the proper level.

IF no cell number(s) were recorded, THEN mark this step N / A .

PROC.IWORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 2 0 Of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 8.2.9 Corrected Cell Voltage A. Record the cell number(s) of any cells that meet the following conditions. (If none, indicate none)

1. Below Technical Specification Allowable Value
a. Record any cell (s) with an uncorrected voltage (Data sheet I, column A) equal to or less than 2.07 VDC.

ACCEPTANCE b. IF any cell voltage is equal to CRITERION or less than 2 . 0 7 VDC, THEN immediately notify the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for Operation has been exceeded and initiate a Condition Report. Notify engineering of this condition and the corrective action taken.

(The battery is inoperable and must be restored within two ( 2 )

hours.

IF NOT, THEN mark this step N/A.

2. Below Technical Specification Limits
a. Record any cell(s1 with a corrected cell voltage less than 2.13 VDC as indicated by Column "C' of Data Sheet 1.

PROC.IWORKPLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 21 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0

b. IF any corrected cell voltage is less than 2.13 VDC.

THEN immediately notify the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for Operation has been exceeded and initiate a Condition Report. Notify engineering of this condition and the corrective action taken.

(The cell voltage should be restored above the limits within seven (.7 1. davs.)

IF NOT, THEN mark this step N/A.

3. Maintenance Limits
a. Record any cell(s) with a corrected cell voltage (Data sheet 1, Column C) less than 2.17 W C .

C -- (a. ILL v o ~ )

4. any cell number(s) were recorded in steps 8.2.9.A.l through 8.2.9.A.3, THEN verify that action has been initiated to restore the cell voltages to an acceptable level and record supervisor comments below.

IF no cell numbers were recorded THEN mark this step N/A.

8.2.10 Specific Gravity A. Calculate the average corrected specific gravity of all connected cells and record the result below.

PROC.IWORKPLAN NO.

2403.024 PROCEDVREIWORK PLAN TITLE:

2D11 QUARTERLY SURVEILLANCE PAGE:

CHANGE:

22 of 5 5 012-01-0 1 SECOND PERSON VERIFICATION A Second Person Verifier shall calculate the average corrected specific gravity of all connected cells.

Calculate the average corrected specific gravity of all connected cells and record the results below.

/ 12-12.03 Second ~brsonVerifier Date

1. 6 Below Technical Specificati n Allowable Values
a. Indicate whether the average corrected specific gravity is equal to or greater than 1.190, or below 1.190.

1 -

x 1 Equal to or greater than 1.190 1-1 Below 1.190 ACCEPTANCE b. IF the average corrected specific CRITERION -

aravitv is less than 1.190.

(Data sheet 2 Column F).

THEN notify the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for Operation has been exceeded, the battery bank is inoperable and initiate a Condition Report. (The specific gravity must be restored above the limits within two (.2 .) hours.)

IF NOT, THEN mark this step N/A.

2. Below Technical Specification Limits
a. Indicate whether the average corrected specific gravity is above 1.200, or equal to or less than 1.200.

PROCEDURUWORK PLAN TITLE: PAGE: 23 of 55 2403.024 2D11 QUARTERLY SURVEILLANCE CHANGE: 012-01-0 ACCEPTANCE b. the average corrected specific  ?/&I M/@

CRITERION gravity is equal to or less than 1.200, (Data Sheet 2 Column F),

TaEN notify the Unit 2 Operations Shift Manager and the Cognizant Supervisor that a Limiting Condition for Operation has been exceeded and initiate a Condition Report. (The specific gravity must be restored above the limits within seven ( 7 )

days. )

IF NOT, THEN mark this step N/A.

NOTE The Technical Specification Allowable Specific Gravity is calculated by subtracting 0.020 from the Average Corrected Speclfic Gravlty.

{0CAN128306)

ACCEPTANCE B. Calculate the Technical Specification CRITERION allowable value for each individual cell and record the result below.

Allowable Value = 1. 2 2 Ll - 0.020 = 1. A D Y Average

1. Below Technical Speciflcation Allowable Value
a. Record from Data Sheet 2, Column F all cell number(s1 with a corrected specific gravity that is equal to or below the allowable value calculated in step 8.2.10.B P
b. -

IF any cell(s) corrected specific gravity is below the allowable value, THEN take the following action:

IF no cells specific gravity is G l o w the allowable value, THEN mark step 1 through 4 N/A.

NO. PROCEDURENVORK PLAN TITLE:

2 D l l QUARTERLY SURVEILLANCE PAGE:

CHANGE: 1 24 of 55 012-01-0 1.1 Immediately notify the Unit 2 Operations Shift Manaqer and the Coqnizant

~ u p e k s o rthat a Limiting Condition for Operation has been exceeded. (The battery is inoperable and must be restored to the operable status within two

( 2 ) hours.)

2.) Initiate a Condition Report.

3.) Inform the Cognizant Supervisor to determine if a stratification exists.

-IF a stratification exists, THEN perform step 8.3.6 IF NOT,

-/A this step.

NOTE IF stratification existed and Data Sheet 3 has been used, then use Data Sheet 3 instead of Data Sheet 2, as directed below.

I I

2. Below Technical Specification Limits
a. Record the cell number(s) with a corrected specific gravity below 1.190 as indicated by Column "F" of Data Sheet 2 or Data Sheet 3 (if applicable).
b. g a n y c e l l ( s ) hasacorrected s p e c i f i c gravity below 1.190,

"-$$-///$-

THEN take the following action:

I F no c e l l s p e c i f i c gravity i s below 1.190, THEN N/A steps 1 through 4 .

PLAN N

O. PROCEDURE

/WORK PLAN TITLE: PAGE: 25 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 1.) Immediately notify the Unit 2 ODerations Shift Manager and the Cognizant Supervisor that a Limlting Condition for Operation has been exceeded. (The specific gravity must be restored above the lim'its within seven (7) days.)

2.) Initiate a Condition Report.

3.) Inform the Cognizant Supervisor to determine if stratification exists.

4.) IF a stratification exists THEN perform step 8.3.6, if not previously accomplished in step 8.2.lb.B.l.b.4 IF NOT, THEN N/A this step.

IF stratification existed and Data NOTE Sheet 3 has been used, THEN use Data Sheet 3 instead of Data Sheet 2, as directed below.

3. IF any cell number (s) were recorded in SteDs 8.2.10.B.l and 8.2.10.B.2.

THEN verify that the cellcs) haGe been identified, and action has been initiated to restore the specific sravitv to an acceotable level.

IF; &

THEN mark this step N/A C. Maintenance Limits

1. Calculate the following average corrected specific gravity maintenance limit.

AverageLimit= t.2aLl - O.OI= \.XI7 Average

I P R o C . ~ O R KPLAN NO. I PROCEDUREIWORK PLAN TITLE: I PAGE: 260f 55 1 2 D l l QUARTERLY SURVEILLANCE I CHANGE: 012-01-0 I

2. Record from Data Sheet 2 or Data Sheet 3 (if applicable), column F all cell number (s) with a corrected specific gravity that is equal to or below the average specific gravity maintenance limit. (Value calculated in Step 1 above) .

N O d L

3. any cell (s) were recorded in 8.2.10.C.2 THEN inform the Cognizant Supervisor to determine what corrective action is to be taken:

IF NOT, m a r k this step N/A Supervisor Recommended Action:

8.2.11 Resistance

{0CAN128306)

CAUTION IF any inter-cell connection is greater than or equal to 150 micro-ohms, THEN we have entered into a 2-hour action statement.

AND the 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> begins from the time that the high resistance reading is found, THEREFORE. prompt notification of the Shift Manager is essential.

A. Record below any cell connection(s) that meets the following conditions. [If none, indicate none)

1. Maintenance Limits
a. Record any cell-to-cellor terminal connection ls) with a micro-ohm reading greater than 50 micro-ohms.

I PROCJWORK PLAN NO. I PROCEDUREWORK PLAN TITLE: I PAGE: 2 7 o f 55 i 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 I

2. g any cell-to cell or terminal comection(s) was recorded in step 8.2.11.A.1, THEN notify Cognizant Supervisor for corrective action to be taken.

IF no cell-to-cellor terminal connection(s) was recorded

- mark this step N/A.

THEN Supervisors comments:

8.3 CORRECTIVE ACTION 8.3.1 IF corrective action is required, THEN verify that the Electrical Maintenance Supervisor has been consulted prior to initializina corrective action.

d IF NOT, THEN mark this step N/A 8.3.2 -

I F any cellb) were recorded in part 3a of step 8.2.8.A. indicating deficient electrolyte level, THEN correct the electrolyte level for each cell in accordance with procedure 2403.052 and attach the copy of procedure 2403.052 used to this procedure.

IF NOT, THEN mark this step N/A.

I CAUTION Enerqizinq the off-line inverter, while battery charoer on euualize, I I will-blow-fuses on the on-line inverters. ~rio;notification-to Operations Shift Manager required if battery placed on equalize in either Step 8.3.3 or 8.3.4. (Ref. CR-ANO-2-2000-0604) 8.3.3 IF any cellcs) were recorded in part 3a of step 8.2.9.A, indicating cells with a voltage less than 2.17 VDC, a place the battery on equalize charge, Or the battery may be evaluated over a period of time to determine the cause.

IF NOT, THEN mark this step N/A.

PROC.MIORK PLAN NO. PROCEDURE~WORKPW TITLE: PAGE: 28 of 55 1 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 I 8.3.4 -IF any cell(s) were recorded in 8 . 2 . 1 0 . C . 2 indicating a cell with a corrected specific gravity below average maintenance limit, THEN inform the Electrical Maintenance Supervisor to determine if a equalizing charge is necessary.

-IF an equalizing charge is necessary,

-perform procedure 2 4 0 3 . 0 5 2 and attach the THEN copy of procedure 2 4 0 3 . 0 5 2 used to this procedure.

IF NOT, THEN mark this step N/A Action taken:

1 8.3.5 -IF any cell-to cell or termlnal connection exceeds the Tech Spec. limit or maintenance limit, whlch indicates a high resistance connection,

-THEN verify that corrective action has been taken per section 1 . 6 of supplement 1 to restore cell to cell or terminal connection(s) to the

-oroper

- limits.

-IF no corrective action is necessary THEN N/A this step.

NOTE When performing step 8 . 3 . 6 suction shall be taken from the top of the cell through the flame arrestor hole. Discharge shall be through the sample tube to the bottom of the cell.

8.3.6 -IF a stratification exists in specific gravity as determined by the Cognizant Supervisor, THEN perform the following steps:

-IF no stratification exists, THEN N/A steps A, B and C.

A. Mix the electrolyte in each affected cell for 3 0 minutes using a variable speed micro pump with 1 / 4 " suction tubing.

F3 Measure the specific gravity again using </fl /A$,$.

step 8 . 1 . 5 for instructions and record the new readings on Data Sheet 3).

C. Proceed to section 8 . 2 . 1 0 substituting Data Sheet 3 where Data Sheet 2 is referenced.

PRDC.NVORK PLAN NO.

2403.024 PROCEDURWORK PLAN TITLE:

2Dl I QUARTERLY SURVEILLANCE PAGE:

CHANGE:

29 of 55 012-01-0 1 9.0 RESTORATION AND CHECKOUT

-IF any Condition Reports were issued during the performanc of this procedure, THEN attach a copy of the Condition Report to this

-procedure.

IF NOT, THEN mark this step N/A.

Verify that the requirements of Housekeeping Level I1 have been met.

Verify that the battery log book has been updated to include the following:

9.3.1 Date this procedure was performed.

9.3.2 Time this procedure was completed.

9.3.3 Performer of this procedure.

9.3.4 Any problems encountered and corrective action taken.

NOTE 124.7 VDC is the Tech. Spec. Value (lower limit) for a 58-cell bank's float voltage. However, the as left float voltage should be 127.6 to 130.5 when measured at the battery terminal.

9.4 Verify that the battery bank float voltage measured in step 8.1.1 is equal to or greater than 124.7 M C when on normal float charse.

9.5 Verify that the average cell temperature calculated in Section 8.2.5 is greater than 60°F.

9.6 Verify that the Electrolyte levels in Section 8.1.4 are above the minimum line and equal to or less than 1/4" above the maximum line.

9.7 Verify that the average corrected specific gravity of the battery is qreater

- than 1.200.

9.8 Verify that the corrected specific gravlty of each cell is not below the allowable value calculated in step 8.2.10.B.

9.9 Verify that the "As Left" corrected single cell voltage euual to or qreater than 2.13 VDC when on normal float charge.

r PROC.NVORK PLAN NO.

2403.024 9.10 PROCEDURUWORK P U N TITLE:

2 D l l QUARTERLY SURVEILLANCE Verify that all cell-to-cell and terminal connections are PAGE:

CHANGE:

30 of 55 012-01-0 less than or equal to the Maintenance Limit of 50 micro-ohms (or engineering justification and action plan is attached IF >50 micro ohms and < 150 micro ohms).

9.11 Notify the Unit 2 Operations Shift Manager that this surveillance test is complete.

9.12 IF USED, THEN, verify all

- Torque Wrenches have been post tested after completion of this procedure.

OTHERWISE, mark this step N/A.

9.13 Submit copy of test results to the assigned System Engineer.

9.14 All set-polnts and tolerances in this procedure have been checked and are verifled to be withln the limits herein specifled and any exceptions are noted.

10.0 ATTACHMENTS AND FORMS 10.1 ATTACHMENTS 10.1.1 Data Sheet 1 10.1.2 Data Sheet 2 10.1.3 Attachment 1 10.1.4 Data Sheet 3 10.1.5 Supplement 1 10.1.6 Data Sheet 4 10.1.7 Attachment 2 10.2 FORMS 10.2.1 None

PROC.WORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 32 of 55 I 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 2 Page 1 of 2 BATTERY BANK 2Dll 1

I I

CELL NO.

I I

I 8.1.3.D Column "A" TEMPERATURE I

I I

8.1.4.A Column "B" ELECTROLYTE LEVEL I

I I

8.1.5.H Column "Cr' HYDROMETER SPECIFIC GRAVITY, READING I

I I

8.2.3 Column I'D" TEMPERATURE CORRECTION FACTOR I

I I

8.2.3 Column "E" LEVEL CORRECTION FACTOR I

I 8.2.4 Column " F "

CORRECTED I SPECIFIC GRAVITY I I

PROC.!WORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 33 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 2 Page 2 of 2 BATTERY BANK 2Dll SPECIFIC GRAVITY

PROC.NVORK PLAN NO. PROCEDUREIWORK PLAN TITLE: PAGE: 31 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 1 BATTERY BANK 2011 Corrected Voltage = V + TCV = Float Voltage 8.2.5 Average Cell Temp. 68.6 'F (From Data Sheet 2 Col. "Au)TC = (Cell Temp - Average Cell Temp.) ( . 003)

Note: If cell temp. is equal to or less than average TC = 0 Test Equip. - 192. Cal. Due 1 0 ' i A/C Ripple Voltage 5'r3*f VAC Positive Voltage to Ground bq,9+ r D

C Negative Voltage to Ground 5 9 . 37 i@f2

r PROC.NVORK PLAN NO.

2403.024 PROCEDURENVORK PLAN TITLE:

2 D l l QUARTERLY SURVEILLANCE DATA SHEET 4 PAGE:

CHANGE:

42 of 55 012-01-0 Page 1 of 12 "AS- FOUND "

BATTERY BANK 2011 I BATTERY RACK 1 RECORD RESISTANCE CELL TO CELL IN MICRO-OHMS FOR

NO. PROCEDURWORK PLAN TITLE: PAGE: 43 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 4 Page 2 of 12 "AS-FOUND "

BATTERY BANK 2Dll 1 BATTERY RACK I RECORD RESISTANCE I CELL TO CELL IN MICRO-OHMS FOR CONNECTIONS LISTED CONNECTIONS 29N1-30P1 1 29N2-30P2

pROC.IW0RK PLAN NO. PROCEDURENVORK PLAN TITLE: PAGE: 44 of 55 2 D l l QUARTERLY SURVEILLANCE 1 CHANGE: 012-01-0 1 DATA SHEET 4 Page 3 of 12 "AS FOUND" BATTERY BANK 2Dll

,LATE AND TERMINAL PLATE TO MICRO OHMS FOR LISTED ABLE CONNECTIONS /CONNECTIONS I 1P1-TERM. PLT.

I 2 J

'ERMINAL PLATE TO I

!ELL # 1 I 1P2-TERM. PLT.

I I

I 3

TERM. PLT.-LUG#1 I

'ERMINAL PLATE TO I

I 16 TERM. PLT.-LUG#2

NCOMING 250 MCM I XBLE LUGS CELL # 1 I

[

17 TERM. PLT.-LUG#3 I

I

/

I 3 19N1-TERM. PLT.

I

'ERMINAL PLATE TO I 3

ELL # 19 I 19NZ-TERM. PLT.

I 9

I I

I iI TERM. PLT.-LUG#l 1

TERM. PLT.-LUG#2 I TERM. PLT.-LUG#3 I 7 PERMINAL PLATE ON CELL # 19 PO INTERTIER 4/0 CABLE LUGS iI /

TERM. PLT.-LUG#4 I

I I

6 TERM. PLT.-LUG#5 I 7-iI s TERM. PLT . -LUG#6

1 PROC.IWORK PLAN NO. I PROCEDUREIWORK PLAN TITLE: PAGE: 450f 55 1 2 D l l QUARTERLY SURVEILLANCE DATA SHEET 4 Page 4 of 12 "AS FOUND" BATTERY BANK 2Dll JBATTERYRACK CELL TO TERMINAL \RECORD RESISTANCE IN

, - - AND TERMINAL PLATE TO IPLATE IMICRO OHMS FOR LISTED

]CABLE CONNECTIONS \CONNECTIONS I 20P1-TERM. PLT.

I I

/TERMINAL PLATE TO I ICEL S # 20 ( 20P2-TERM. PLT.

I I /'

1i (D TERM. PLT.-LUG#1 I

1 I 7 TERM. PLT.I LUG#^

I I

1 TERM.

z PLT . -LUG#3 I

TERMINAL PLATE ON CELL # 20 II IT0 INTERTIER 4/0 CABLE LUGS TERM. PLT.-LUG#4 I I I

I I

\

7 TERM. PLT.-LUG#5

! I II TERM. PLT.-LUG#6 I

1 I 5-39N1-TERM. PLT.

TERMINAL PLATE TO CELL # 39 1 39N2-TERM. PLT.

7 TERM. PLT.-LUG#l I

I 1 lo TERM. PLT.-LUG#2 I II TERMINAL PLATE ON CELL # 39 1 TO INTERTIER 4/0 CABLE LUGS 1 TERM. PLT.-LUG#3

PROC.WORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 46 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 01201-0 DATA SHEET 4 Page 5 of 12 "AS FOUND" BATTERY BANK 2011 j PLATE AND TERMINAL PLATE TO j MICRO OHMS FOR LISTED j

]CABLE CONNECTIONS 1 CONNECTIONS I

!I I TERM. PLT.-LUG#4 !I I

I II I

]TERMINAL PLATE ON CELL # 39 TERM. PLT.-LUG#5 I IT0 INTERTIER 4/0 CABLE LUGS I

1I 7 II I I i I TERM. PLT.-LUG#6

=i I

I I I I I -

1 I TERM. PLT.-

II II Y iI I

1 TERM. PLT.-LUG#2 I

I I 7 I I

TERM. PLT.-LUG#3

-7 I I

/TERMING PLATE ON CELL # 40 iI / i IT0 INTERTIER 4/0 CABLE LUGS TERM. PLT.-LUG#4 I I I I/ 7 TERM. PLT.-LUG#5 I

I TERM. PLT . -LUG#6 I 58N2-TERM. PLT. 1

PROC.IWORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 47 of 55 2403.024 2Df1 QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 4 Page 6 of 12 "AS FOUND" BATTERY BANK 2Dll IBATTERYANDRACK CELL TO TERMINAL IMICRO[RECORDRESISTANCE IN PLATE TERMINAL PLATE TO CABLE CONNECTIONS OHMS FOR

~CONNECTIONS

-- LISTED II I TERM. PLT.-LUG#l I

I /D I TERM. PLT.-LUG#2 OUTGOING 250 MCM I CABLE LUGS CELL # 58 I id I I TERM. PLT.-LUG#3 COMMENTS :

Test Equip. and Cal. Due. Date: DLRo - 00 1 / 2-9-0'j /

/ , -

Performed by: .......... ,- /Z./?O Second Person Verifier:&

PROCJWORK PLAN NO. PROCEDUREWORK PLAN TITLE: PAGE: 31 of 55 2403.024 2 D l l QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 1 BATTERY BANK 2Dll Corrected Voltage = V + TCV = Float Voltage 8.2.5 Average Cell Temp. m.6 OF (From Data Sheet 2 Col. "A") TC = (Cell Temp - Average Cell Temp.) (.OO3)

Note: If cell temp. is equal to or less than average TC = 0 Test Equip. , i ) ~-h172

~ Cal Due 1-31-O'i A/C Ripple Voltage YO.! VAC Positive Voltage to Ground 6q. qL( VDC Negative Voltage to Ground 5 9 . 37 r k

PROC.NVORK PLAN NO. PROCEDUREMORK PLAN TITLE: PAGE: 32 of 55 2403.024 2Dll QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 2 Page 1 of 2 BATTERY BANK 2Dll 8.1.3.D 8.1.4.A 8.1.5.H 8.2.3 8.2.3 8.2.4 Column "A" Column "B" Column "C" Column O D " Column "E" Column "F" CELL N~DROMETER TEMPERATURE LEVEL NO. TEMPERATURE ELECTROLYTE SPECIFIC GRAVITY, CORRECTION CORRECTION CORRECTED

PROC.NVORK PLAN NO. PROCEDURENVORK PLAN TITLE: PAGE: 33 of 55 2403.024 Z D I I QUARTERLY SURVEILLANCE CHANGE: 012-01-0 DATA SHEET 2 Page 2 of 2 BATTERY BANK 2Dll Column "A" I Column "BU I Column "C" I Column "D" I Column "E"

-.-.A Column 'IF" I HYDROMETER I TEMPERATURE LEVEL I CORRECTION CORRECTED